ML18003A528

From kanterella
Jump to navigation Jump to search
Confirms Commitment to Meet W/Environ Project Manager in Bethesda,Md on 790508
ML18003A528
Person / Time
Site: Harris  Duke Energy icon.png
Issue date: 04/12/1979
From: Mcduffie M
CAROLINA POWER & LIGHT CO.
To: Harold Denton
Office of Nuclear Reactor Regulation
References
NUDOCS 7904180274
Download: ML18003A528 (8)


Text

INIL-'EGULATORY 1NFORMATION DISTRIBUTION SYSTEM (RIOS) '

ACCESSION NBR:7904180274 DOC ~ DATE: 79/04/12 NOTARIZED!

NO DOCKET FACIL:50~000 SHEARON HARRIS NUCLEAR POWER PLANTE UNIT 1P

CAROLINA, 5000000 50-401 SHEARON HARRIS NUCLEAR POWER PLANT UNIT 2 CAROLINA 0500 M 4)2 SHEARON HARRIS NUCLEAR POWER PLANTE UNIT 3P CAROLINA 05000402 AUTH,HKMP3 AUTHOR AFF ILIATION Ogeoeyog MCDUFFIE M ~ A ~

CAROLINA POWER 5 LIGHT CO ~

RECIPNNAME RECIPIENT AFFILIATION DENTONE H ~ R ~

OFFICE OF NUCLEAR REACTOR REGULATION

SUBJECT:

CONFIRMS COMMITMENT TO MEET W/ENVIRON PROJECT MANAGER 'lN BETHESDA P MD ON 790508

~

DISTRIBUTION CODE:

COOEB COPIES RECEIVED:LTR l ENCL SIZE:~

TITLE: ENVIRON ~

COMMENTS, NOTES'l, I

I I

'I i,l.i '0 I" ~'~j'P" RECIPIENT ID CODE/NAME ACTION:

05 PM a BA'/~8 18 LA'/~~~

INTERNAL+

0 EG F ILF 0

10 CST BNFT ANL 12 AD SITE TECH 15 EFLT TRT SYS 19 DIR DSE AD SITE ANALY COPIES LTTR ENCL RECIPIENT ID CODE/NAME 17 BC E'PcS PF~

AD W ~ooRE 02 NRC PDR 09 ENVN SPEC BR 11 TA/EDO 10 ACDENT ANALY 16 RAD ASMT BR AD ENVIRON TECH OELD COPIES LTTR ENCL' 1

1 1

1 1

1 EXTERNAL! 03 LPDR 1

20 NATL LAB dgNL.

5 04 NSIC ACRS L~

U8>s +<~ o Lmg ~e Pl I /t/Eg ZAJQ 6 4 /

/pe Zg yg~

0 TOTAL NUMBER Of COP IES REQUIRED i LTTR 28 ENCL

ily V

f e

'E Y

h

Carolina Power 8 Light Company April 12, 1979 Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation United States Nuclear Regulatory Commission Washington, D. C.

20555 SHEARON HARRIS NUCLEAR POWER PLANT, UNIT NOS

. 1, 2, 3, AND 4 DOCKET NOS; 50-400, 50-401, 50-402, AND 50-403 ENVIRONMENTAL REPORT

Dear Mr. Denton:

This is to confirm our commitment to meet with the'RC's Environmental Project Manager for the Shearon Harris Nuclear Power Plant (SHNPP) at 9:30 a.m.

on May 8, 1979, at the NRC offices in Bethesda.

Carolina Power

& Light Company has requested this meeting to discuss the preparation of the SHNPP Environmental Report (ER), which is tq be submitted to the NRC staff in June, 1980.

We wish to ensure that your staff is. aware of and concurs with our approach in preparing the SHNPP ER in order to expedite the docketing and review of this document and avoid licensing delays.

As you are

aware, our target date for an Operating L'icense for SHNPP Unit No.

1 is June, 1983.

matter.

We are looking forward to a productive session with the NRC on this Yours very truly, M. A. McDuffie Senior Vice President Engineering

& Construction SDF/mf r@e4ze o>ag 41't Fayetteville Street

~ P. O. "ox t55t

~ Raleigh

',4. C. 27o02

Fr s

.r r

REGULATORY INFORMATION DISTRIBUTION SYSTEM <RIDS)

DISTRIBUTION FOR INCOMING MATERIAL 50-400/401/402/403 f

REC:

CASE E

G ORG:

MCDUFFIE M A NRC CAROLINA PWR 5 LIGHT DOCDATE: 05/01/78 DATE RCVD: 05/04/78 DOCTYPE:

LETTER NOTARIZED:

NO COPIES RECEIVED SUBJECT; LTR 1

ENCL 0

'FURNISHING INFO RE MINOR CHANGE IN APPLICANT"S CONSTRUCTION PLANS FOR CLEARING OF THE MAIN RESERVOIR... ADVISING APPLICANT NO LONGER INTENDS TO CLEAR THE RESERVOIR AREA IN TWO STAGES.

PLANT NAME:SHEARON HARRIS 81 SHEARON HARRIS 12 SHEARON HARRIS 43 SHEARON HARRIS 84 REVIEWER INITIAL:

XJM DISTRIBUTER INITIAL:

DISTRIBUTION OF THIS MATERIAL IS AS FOLLOWS ENVIRONMENTAL COMMENTS (DISTRIBUTION CODE C002>

FOR ACTION:

FOR INFO:

FOR INFO:

INTERNAL:

EXTERNAL:

ASST DIR MOORE++LTR ONLY(i>

PROJ l"lGR ECHOLS++LTR ONLY(1)

VASSALLO~~4LTR ONLY< 1)

MINE LT'fPVNLY=(-

EG-.F-.

- =

TR ONLY(1 >

HANAUER++LTR ONLY(i)

ERNST++LTR ONLY(1)

YOUNGBLOOD4I+LTR ONLY(i)

VQLLMER+4LTR ONLY<i)

J.

COLLINS++LTR ONLY( 1 )

LPDR'S RALEIGH'C++LTR ONLY< 1 )

NATL LAB++LTR ONLY(6)

NSIC++LTR ONLY< 1)

TIC++LTR ONLY(i>

ACRS CAT B+4LTR ONLY<0)

BR CHIEF REGAN>+LTR ONLY(i >

LIC ASST KREUTZER%<LTR ONLY<i)

PARR44LTR ONLY<i)

RUSHBROOK++LTR ONLY(i)

NRC PDR4+LTR ONLY(l>

OELD4~~LTR ONLY<i)

DENTON/MULLER>~LTR ONLY(i>

BALLARD44LTR ONLY(i)

GAMMILL++LTRONLY(2 >

BUNCH+4LTR ONLY( 1)

KREGER++LTR ONLY(i)

DISTRIBUTION:

LTR 33'NCL 0 SIZE:

iP CONTROL NBR:

781240033

, ~

THE END

p CÃQP Carolina Power 8 Light Company May 1, 1978

'4/It)~

Mr. Edson G.

Case, Acting Dixector

'E5p.p Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D.

C.

0555 SHEARON HARRIS NUCLEAR POWER PLANT UNITS 1, 2, 3, ANI4 DOCKET NOS. 50-400, 50-401, 50-402, 50-403 Q

EROSION AND SEDIMENTATION CONTROL

Dear Mr. Case:

This is to inform you of a minor change in our construction plans for clearing of'he main xeseryoix.

Contrary to the'iscussion in. Section" 4',4 of the Reyised Final Environmental Statement (FES),

we no longer intend to'lear the reservoir area in two stages.

Our original plan to clear the area. between low and normal water, levels after'onstruction of the'am applied to the'0,'000 acre lake; and was based" on the'act, that when'.we were planning for,the 10,000 acre lake, approximately three'ears could have elapsed between clearing. the upper reservoir area and inundation, During this time regrowth would have occurred, thus xequiring reclearing.

With the'maller 4,000 acre lake'his is no longer a pxoblem'.

The, change will have no material, effect on our program for minimizing impacts from'rosion and sediaientation, In fact,'" since the"'drafting of the" Com-'anyts Envixonmental.Report and-the'ublication, of.the'evised Sinai Environmental Statemenh, North" Carolina has implemented an erosion and sedimentation control pxogram pursuant to'hich. the Company must obtain State authorization for reser-yoir cleaiing.

-The State'program requires protective, measures-that equal or ex-ceed those discussed in theFES, and thus assures'ompliance with the erosion and sedimentation control measures'ontemplated in the'ES and in.the construction permits.

If you have any questions concerning our plans,,we will be glad to discuss them with you.

Yours very truly, M. A. McDuffie Senior Vice President Engineering

& Construction

( 781240033 g~0

,O 336 Fayettevit le Street

~ P. O. Box 1551

~ Raleigh, N. C. 27602

C

'R 4 IRg Q

'I 4 /,'llf E

I 0 ~

I'

\\

I P,

e I

~

~ ~'

~ I I

Ii C

,'-. I,"R P

'R I

e I'