ML18003A526
| ML18003A526 | |
| Person / Time | |
|---|---|
| Site: | Harris |
| Issue date: | 04/09/1979 |
| From: | Mcduffie M CAROLINA POWER & LIGHT CO. |
| To: | Harold Denton Office of Nuclear Reactor Regulation |
| References | |
| NUDOCS 7904160089 | |
| Download: ML18003A526 (5) | |
Text
REGULATORY INFORMAT10N DISTRIBUTION SYSTEM (RIDS)
ACCESSION NBR+7904160089 OOC ~ DATE! 79/04/09 NOTARIZED!
NO FACILe50"400 SHEARON HARRIS NUCLEAR POWER PLANTt UNIT 1 p CAROLINA 50 401 SHEARON HARRIS NUCLEAR POWER PLANTE UNIT,2 ~
CAROLINA 50 002 SHEARON HARRIS NUCLEAR POWER Pl ANTP UNIT '3g CAROI INA AUTH BYNAME AUTHOR AFFILIATION MCDUFFIEPM ~ Ao CAROLINA POWER 5 LIGHT CO ~
RECIP ~ NAME 'ECIPIENT AFFILIATION DENTON H,R ~
OFFICE OF NUCLEAR REACTOR RfGULATlON DOCKET ¹ 05000000 05000401 05000402 5p-gb3 SUBJECT FORWARDS INFO 5
COMMITMENTS IN RESPONSE TO 790320 QUESTIONS RE STRENGTH OF WEATHEREO ROC'K FOUNDATIONS 5 IN PLACE GRADUATION 0 RANDOM EMBANKMENT MATL, DISTRIBUTION CODE I SOOIS COPIES RECEIVED'LTR ~
ENCL '~'SIZE i
TITLE: PSAR/FSAR ANDTS AND RELATED CORRESPONDENCE, NOTES'
~,
Ill 4!8
+!4
$ I tN I
'I REC IPIENT ID CODE/NAME ACTION>
05 PM H~g~
1 RECIPIENT ID CODE/NAME AD V~gqg ~
LA~g COPIES LTTR ENC 1
INTERNALS REG F ILE 09 GEOSCIEN BR ll MECH ENG" BR 13 MATL ENG BR 16 ANALYSIS BR 18 AUX SYS BR 20 I 5
C SYS BR 22 AD SITE TECH 27 EFFL'RT SYS 29 K1RKWOOD AD PLANT SYS AD SITE ANLYS IS l1P A 1
2 1
1 2
1 1
,1 1
1 1
1 1
02 NRC PDR 08 OPERA LIC BR 10 QAB 12 STRUC ENG BR 15 REAC SYS BR 17 CORE PERF BR 19 CONTAIN SYS 21 POWER SY8 BR 26 ACCONT ANLYS 28 RAD ASMT BR AD FOR ENG AD REAC SAFETY DIRECTOR NRR OELD 1
1 1
1 1
1 1
1 1
1 EXTERNAL! 03 LPDR 30 ACRS 1
10 1
04 NSIC APR g8 )g7g L.gC.
+00~
86
&8c 5
6&SvJR ceo w ~R O
TOTAL NUMBER OF COPIES REQUIRED:
LTTR 49 ENCL SO
1 III l
1 n
II
Carolina Pov(er 8 Light Company April 9, 1979 Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation United States Nuclear Regulatory Commission Washington, D. C.
20555 SHEARON HARRIS NUCLEAR POWER PLANT, UNIT NOS. 1, 2, 3, AND 4 DOCKET NOS. 50-400, 50-401, 50-402, AND 50-403 IN-PLACE 'TEST PILL'PROGRAM
Dear Mr. Denton:
In response to your staff's questions of March 20, 1979, concerning the strength of the weathered rock foundations and in-place gradation of random rockfill embankment material for the Shearon Harris Nuclear Power Plant's (SHNPP) auxiliary dam and separating dike, the following information and commitments are provided:
l.
Ebasco Specification CAR-SH-CH-4, Embankments, Dams, Dikes, and Channels,"
has been revised to require a)
The minimum allowable dry density of the in-situ residual soil where the dam and dike embankments will be placed on suitable soil shall be 98 lb/ft.
The expected'verage dry density should be 109 lb/ft3.
(Design parameters See PSAR Appendix 2E).
b)
The dam and dike residual soil foundation shall be proof rolled to identify wet or soft material.
The proof rolling shall consist of slow travel with a loaded pan over 100 percent of the soil surface in both the longitudinal and transverse axis.
In areas where the width is restrictive, the proof rolling will be completed only in the longitudinal direction.
Any soft or wet material identified shall be removed and replaced with suitable material in accordance with Paragraph 104.
c)
The minimum dry density for the in-place random rock fillzone shall be 130 lb/ft.
The average dry density for the in-place random rock fillzone shall be 135 lb/ft3.
d)
A site geologist and soil engineer will map and classify the foundation in accordance with ASTM visual classification methods to verify that the foundation conditions conform to the boring data.
~11 Fayetleville Street
~ P. O. Box test
~ Releign, N. C. 27602 V904160o 9
Mr, Harold R. Denton 2.
SHNPP Technical Procedure TP-08, "Soil Control Program Class I Dams, Fill and Backfill," has been revised to require:
a)
After excavation of unsuitable material where the dam or dike embankment material will be placed on in-situ residual soil, field density tests shall be performed on the prepared surface at a frequency of one test every 5000 ft2.
The density tests shall be completed prior to proof rolling.
b)
Proof rolling of residual soil where embankment material will be placed shall be monitored by a qualified inspector to assure any wet or soft material. zones are removed and replaced with suitable material in accordance with Ebasco Specification CAR-SH-CH-4.
c)
An in-place density test and gradation analysis of the rockfill and random rockfill material shall be performed for every 20,000 cubic yards of material placed.
If the first two tests for both density and gradation indicate results consistent with test fill criteria, the frequency can be reduced to every 40,000 cubic yards.
Carolina Power 6 Light Company believes that the above information will allow your staff to approve the in-place test fillprogram for the SHNPP auxiliary dam and separating dike.
Yours very truly, M. A. McDuffie Senior Vice President Engineering
& Construction RGB/mf cc: