Informs NRC of Status of Const Re Fire Protection Sys.Fire Water Pumps Are on-site.Procurement Tech Specs for Fire Detection on Sys Scheduled to Be Issued on 790125 & Fire Doors Tech Specs Shortly Thereafter
ML18003A383
Person / Time
Site: Harris  Duke Energy icon.png
Issue date: 01/19/1979
From: Hone P
CAROLINA POWER & LIGHT CO.
To: Mattson R
Office of Nuclear Reactor Regulation
References
NUDOCS 7901240176
Download: ML18003A383 (4)


Text

C REGULATORY INF()RMATION DISTR IBU '<)N SYSTEM (BIDS) 0',

ACCESSION NBB-790124m 76 DOC.DATF.- 79/01/19 i OTARIZED- NO DOCKET FACIL:50-400 SHEARON HARB'S/ l, CAROLINA POWER 8, LIGHT CO. 0500 4 ~

50-401 SHFARON HABRIS N2, CAROLINA POWER 8 LIGHT CO. O.l '50 50-402 BYNAME SHEARON HARRIS 413, CAROLINA POWFR 8 LIGHT C() ~ 0500 402 AUTH AUTHOR AFFILIATION Sc-s 3 ~

HONE, P. W. CA ROLI NA POWER 8 LIGHT RECI P - NAMF RECIPIENT AFFILIATION MATTS()N, R.J ~ *DIV..OF SYSTEMS SAFETY SUBJECT- Informs NBC of status of const re f ire protection sys.Fire water pumps are on-site. Procurement Tech Specs for fire detection on sys scheduled to be issued on 790125 8, fire doors Tech Specs shortly thereafter.

DISTRIBUTION CODE~ B002S COPIES RECEIVFD-LTR i ENCL TITLE: FIRE PBOTFCTION (PRIOR TO ISSUANCE OF OL).

Z SIZE: l NOTES:

RECIPIENT CO.P I ES REC I PI ENT COP I ES ID CODE/NAME LTTR ENCL I D C()DE/NAMF. LTTR FNCL ACTION> 05 BC L~('4r3 I I 06 PM WiN~ I I LA a.wc ~3 I 0 INTERNALS I BFG 02 NBC PDR I I 0 0 11 AU XI L S YS BR 3

2 3

2

-10 AD PLANT SYS 13 QAB I

I I

I 14 TA/EDO I I 15 PWR SYS BR I I 16 PLANT .SYS BR 2 2 18 OPER LIC BB I ADFOBQA8,0 I 0 AD SYS 8 PROJ I 0 DFYOUNG,B. I 0 DIRECTOR DOR I 0 DIRECTOR DPM I 0 I8C SYS BB I 0 MUBANAKA,B. I 0 OF.LD ,I 0 VASSA LLO I' EXTERNAL ~ 03 LPDR I I 04 NS I C 19,. ACRS 16. 16 JAN 25 Jgg TOTAL NUMBFR OF COPIES REQUIBFD: LTTB 44 ENCL 34

lt 0,

'J I.

t' I

l

~

Jt F l

tt e I' 1

C

- t

~ 1 i

I Eg I 0 FJ I

I I

1,

I III 1

f<

ll I N I I 1, II

'(

0 lt I CE EI 1

I I l I, 0

"(

J 0

Q$3%~$

Carolina Power 8 Light Company January 19, 1979 Mr. Roger Mattson, Director Division of System Safety United States Nuclear Regulatory Commission Washington, D. C. 20555 SHEARON HARRIS NUCLEAR POWER PLANT, UNIT NOS. 1, 2, 3, AND 4 DOCKET NOS. 50-400, 50-401, 50-402, AND 50>>403 FIRE PROTECTION

Dear Mr. Mattson:

The attached letter from Mr. M. A. McDuffie to Mr. Harold R. Denton dated November 21, 1978, requested that the review of our proposed fire pro-tection provisions for the Shearon Harris Nuclear Power Plant (SHNPP) be expedited so that construction and procurement does not proceed beyond the point where changes can be economically made.

In our meeting of December 13, 1978, you requested that we inform you of the status of construction with regard to our fire protection system. Briefly, as of January 1, 1979, the overall construction of SHNPP Unit 1 was approximately 12 percent complete with the remaining units less than one percent complete. Addi.

tionally, the procurement activity on our fire protection system is progressing to the point where changes could be costly. The fire water pumps for the system have been procured and are on-site. The procurement technical specifications for the fire detection system are scheduled to be issued for inquiry on January 25, 1979, and the procurement technical specifications for the fire doors will be issued shortly thereafter. The design of the underground piping loop and internal containment and turbine building piping has been released for fabrication. The sprinkler system procurement technical specification has been prepared by Ebasco and sent to us for final review prior to inquiry.

Again, if your staff has any reason to believe that our fire protection system as contained in the SHNPP Preliminary Safety Analysis Report (PSAR) will not meet your requirements, we request that you expedite your review in order to alleviate costly changes in our construction and procurement activity. Please if let us know there is any additional information you need to complete your

'(P review of the SHNPP fire protection evaluation.

Yours very truly, P. W. Howe Vice President Technical Servi.ces Department SDF/mf Attachment cc: Mr. Harold R. Denton'ir-~ -'"-

hatt <<ayettewiie Street ~ P Box t55. ~ Rale:gn. N, C. 2"M2 7go<Z4 Or 9b