Forwards IE Insp Repts 50-400/78-09,50-401/78-09,50-402/78- 09 & 50-403/78-09.No Noncompliance Noted
ML18003A365
Person / Time
Site: Harris  Duke Energy icon.png
Issue date: 12/19/1978
From: Murphy C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Jackie Jones
CAROLINA POWER & LIGHT CO.
Shared Package
ML18003A363 List:
References
NUDOCS 7901180105
Download: ML18003A365 (2)


See also: IR 05000400/1978009

Text

~C

~p,8 RECy

1

~ ~

+

0

Cy

oQ

gg

++*++

In Reply Refer To:

RII:RDB

50-400/78-09

50-401/78-09

50-402/78-09

50-403/78-09

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION II

101 MARIETTASTREET, N.W.

ATLANTA,GEORGIA 30303

DEC l 9

>978

Carolina Power and Light Company

Attn:

Mr. J.

A. Jones

Executive Vice President

Engineering,

Construction

and Operation

336 Fayetteville Street

Raleigh, North Carolina

27602

Gentlemen:

This refers to the inspection

conducted

by Mr. R. D. Bradley of this

office on December 5-8,

1978 of activities authorized

by NRC License

Nos.

CPPR-158,

CPPR-159,

CPPR-160

and

CPPR-161 for the Shearon Harris

Nuclear Power Plant facility, and to the discussion

of our findings held

with Mr. R.

M. Parsons

at the conclusion of the inspection.

Areas

examined during the inspection

and our findings are discussed

in

the enclosed

inspection report.

Within these

areas,

the inspection

consisted

of selective

examinations

of procedures

and representative

records,

interviews with personnel,

and observations

by the inspector.

Within the scope of this inspection,

no items of noncompliance

were

disclosed.

We have examined actions

you have taken with regard to previously identi-

fied enforcement matters.

These

are discussed

in the enclosed

inspection

report.

In accordance

with Section 2.790 of the NRC's "Rules of Practice",

Part 2, Title 10,

Code of Federal Regulations,

a copy of this letter and

the enclosed

inspection report will be placed in the NRC's Public

Document

Room. If this report contains

any information that you (or

your contractor) believe to be proprietary, it is necessary

that you

make

a written application within 20 days to this office to withhold

such information from public disclosure.

Any such application must

include

a full statement

of the reasons

on the basis of which it is

claimed that the information is proprietary,

and should

be prepared

so

Carolina

Power and

I,ight Company

OCC

1 9 878

that proprietary information identified in the application is contained

in a separate

part of the document.

If we do not hear

from you in this

regard within the specified period, the report will be placed in the

Public Document

Room.

Should you have

any questions

concerning this letter,

we will be glad to

discuss

them with you.

Sincerely,

r

., --q'~

Charles

E. Murphy, Chief

Reactor Construction

and

Engineering

Support Branch

Enclosures:

Inspection Report Nos. 50-400/78-09,

50-401/78-09,

50-402/78-09

and

50-403/78-09

cc w/enclosures:

Mr. Roland Parsons,

Project Manager

Shearon Harris Nuclear Power Plant

Post Office Box 101

New Hill, North Carolina

27562