ML18003A321
| ML18003A321 | |
| Person / Time | |
|---|---|
| Site: | Harris |
| Issue date: | 11/30/1978 |
| From: | Murphy C NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Jackie Jones CAROLINA POWER & LIGHT CO. |
| Shared Package | |
| ML18003A319 | List: |
| References | |
| NUDOCS 7812210324 | |
| Download: ML18003A321 (3) | |
See also: IR 05000400/1978007
Text
~p8 RE0y,
(4
0
Cl
op
j'~
+n k**y4
In Reply Refer To:
RII:RDB
50"400/78-07,
50-401/78-07,
50-402/78-07)
50-403/78-07
UNITED STATES
NUCLEAR REGULATORY COMMISSION
REGION II
101 MARIETTASTREET, N.W.
ATLANTA,GEORGIA 30303
NOV 80 l978
Carolina
Power and Light Company
ATTN:
Mr. J.
A. Jones
Executive Vice President
Engineering,
Construction
and Operation
336 Fayetteville Street
Raleigh, North Carolina
27602
Gentlemen:
This refers to the inspection
conducted
by Mr. R.
D. Bradley of this
office on October 26-27,
1978, of activities authorized
by NRC Construction
Permit Nos.
CPPR-158,
CPPR-159,
CPPR-160
and
CPPR-161 for the Shearon
Harris Nuclear Power Plant facility, Units 1, 2,
3 and
4 and to the
discussion
of our findings held with Mr. R.
M. Parsons
at the site
on
October 26,
1978,
and Mr. N. J. Chiangi at the corporate office on
October 27,
1978, at the conclusion of the inspection.
Areas
examined during the inspection
and our findings are discussed
in
the enclosed
inspection report.
Within these
areas,
the inspection
consisted
of selective
examinations
of procedures
and representative
records,
interviews with personnel,
and observations
by the inspectors.
Within the scope of this inspection,
no items of noncompliance
were
disclosed.
We have
examined actions
you have taken with regard to previously reported
unresolved
items.
The status
of these
items is discussed
in the enclosed
report.
In accordance
with Section 2.790 of the NRC's "Rules of Practice",
Part 2, Title 10,
Code of Federal Regulations,,a
copy of this letter and
the enclosed
inspection report will be placed in .the NRC's Public
Document
Room. If this report contains
any information that you (or
your contractor) believe to be proprietary, it is necessary
that you
make
a written application within 20 days to this office to withhold
such information from public disclosure.
Any such application must
include
a full statement
of the reasons
on the basis of which it is
70132 >0 3&'f
0
Carolina
Power and
Light Company
-2"
NOV 3 0 197(
claimed that the information is proprietary,
and should be prepared
so
that proprietary information identified in the application is contained
in a separate
part of the document.
If we do not hear from you in this
regard within the specified period,
the report will be placed in the
Public Document
Room.
Should you have any questions
concerning this letter,
we will be glad to
discuss
them with you.
Sincerely,
~~< 87
Charles
E. Murphy, Chief
Reactor Construction
and
Engineering
Support Branch
Enclosure:
Inspection Report No. 50-400/78-07,
50-401/78-07,
50-400/78-07
and 50-408/78-07
cc w/encl:
Mr. Roland Parsons,
Site Manager
Shearon Harris Nuclear Power Plant
Post Office Box 101
New Hill, North Carolina
27562
1