ML18003A293

From kanterella
Jump to navigation Jump to search
Forwards Final Deficiency Rept on Deletion of Bond Breaker & Void at Base of Containment Liner Wall
ML18003A293
Person / Time
Site: Harris  Duke Energy icon.png
Issue date: 11/28/1978
From: Chiangi N
CAROLINA POWER & LIGHT CO.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML18003A294 List:
References
SH-N-2-78, NUDOCS 7812070187
Download: ML18003A293 (4)


Text

REGULATO'ORMATION DISTRIBUTION S EM DOCKET NBR: 5 -400 401/402 SHEARON HARRIS RECIPIENT:

~ O'REILLY, J.P.

ORIGINATOR:

CHIANGI, N.J.

COMPANY:

CAROLINA PWR 6 LIGHT

SUBJECT:

Forwards final rept on "Deletion of Bond Wall."

1/2/DOC DATE:

781128 3/4 ACCESSION NBR:

7812070187 COPIES RECEIVED:

LTR ENCL SIZE:

1+2 Breaker 6 Void at Base of Containment Liner DISTRIBUTION CUOE~

DISTRIBUTION TITLEt CflNSTRUCT ION OFF I C?ENCY REPORT (10CFR50

~ SSE)

NOTARIZED TAHE ENCL7 FOR ACTION ASST OTR BR CHIEF PRQJ HQR LIC h

T FT PTi R 8

E GELD GCISSICX L

S TAFF HIPC 0 IREC TflR OEPUTY nIR OP~

QAfj 0 I RECTOR OSS AO FUR FNG AO FOn REAC SFTY AO FUR PLANT SYSTEMS Ap Ftl~

SYS R,.~ROJ STANOAROS

OEY, E. Jordan IE Field Coordinator LPOR TERA NSIC ACRS

~/ENCL

~/ENCL H/ENCL I

iS/ENC L

M/2 ENCL W/FNCL

'H /ETC L 4/ENCL w/EhrCL W/ENCL W/FNCL W/ENCL w/ENCL i"/F~CL

>/ENCL

~/ENCL N/ENCL w/ENCL

'A/ENCL

'w/E<CL w/ENCL

>/E>CL W/1~

ENCL

~

VASSALLO

~

W gyp g f lJlo TATA(

NUHBER OF COPIES REAUIREDi LTR ENCL 41 41 NOTES:

e l

,l I

File:

SH N-2/18 November 28, 1978

~1'mL I

Carolina Power 8 Light Company

<<<<L@OI OOC,KET RLE COPY Mr. James P. O'Reilly United States Nuclear Regu1atory Cotmnission Region II 101. Marietta Street, Northwest Atlanta, Georgia 30303.'.

CAROLINA POWER 6 LIGHT COMPANY, HARRIS PROJECT 1984-86-88-90 3,'600 MW - UNITS.1, 2,. 3,AND 4 DELETION OF BOND BREAKER AND VOID AT THE BASE OF THE'ONTAINMENT LINER WALL

Dear Mr. O'Reilly:

In accordance with 10CFR50.55(e),

the Region II office (Mr. R. Bradley) was officiallynotified of the subject deficiency at the Shearon Harris Nuclear Power Plant on November 3, 1978.

Attached is. a final report. which describes the problem and the corrective action taken to.accomplish resolution." With this report, Carolina Power 6

Light Company considers the'matter closed.

If you have any questions regarding this matter, please do not hesitate to, contact;me.

Yours very truly, KVH/gea Attachment cc:

Mr. J.

G.

Dashes (2). W/a,P N.d.c~

N. J. Chiangi - Manage~r Engineering

& Construction Qua1ity'ssurance 0

411 Fayetteville Street

~ P. 0. Box 1551

~ Raleigh. N. Cr 27602

~ao70 zs'7

r i/ wl n~

Ir