UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 Ms. Tanya M. Hamilton Site Vice President Shearon Harris Nuclear Power Plant 5413 Shearon Harris Road M/C HNP01 New Hill, NC 27562-0165 January 2, 2018
SUBJECT:
SHEARON HARRIS NUCLEAR POWER PLANT, UNIT 1 - REQUEST FOR ADDITIONAL INFORMATION REGARDING LICENSE AMENDMENT REQUEST PROPOSING CHANGES TO EMERGENCY DIESEL GENERATOR TECHNICAL SPECIFICATION SURVEILLANCE REQUIREMENTS (CAC NO. MF9828; EPID L-2017-LLA-0244)
Dear Ms. Hamilton:
By application dated June 5, 2017 (Agencywide Documents Access and Management System Accession No. ML17156A216), Duke Energy Progress, LLC (the licensee) submitted a license amendment request for the Shearon Harris Nuclear Power Plant, Unit 1 (HNP), requesting changes to the HNP Technical Specifications. The changes would restrict the steady-state voltage and frequency limits for emergency diesel generator (EOG) operation to ensure that accident mitigation equipment can perform as designed. The proposed changes would also increase the voltage limit for the EOG full load rejection test.
The U.S. Nuclear Regulatory Commission staff has determined that additional information is needed in order to complete its review. The enclosed request for additional information was e-mailed to the licensee in draft form on December 7, 2017, and the licensee determined it did not need a clarification call. However, a 45-day response date was requested. Please note that if a response to this letter is not received by January 22, 2018, or an acceptable alternate date is not provided in writing, we may deny the application for amendment under the provisions of Title 1 O of the Code of Federal Regulations, Part 2, Section 108, "Denial of application for failure to supply information."
If you have any questions, please contact me at 301-415-2760 or by e-mail to Martha.Barillas@nrc.gov.
Docket No. 50-400
Enclosure:
Request for Additional Information cc: Listserv Martha Barillas, Project Manager Plant Licensing Branch 11-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation
DUKE ENERGY PROGRESS, LLC SHEARON HARRIS NUCLEAR POWER PLANT, UNIT 1 DOCKET NUMBER 50-400 REQUEST FOR ADDITIONAL INFORMATION REGARDING A LICENSE AMENDMENT REQUEST PROPOSING CHANGES TO EMERGENCY DIESEL GENERATOR TECHNICAL SPECIFICATION SURVEILLANCE REQUIREMENTS CAC NUMBER MF9828 EPID L-2017-LLA-0244 By Letter dated June 5, 2017 (Agencywide Documents Access management System Accession No. ML17156A216), Duke Energy Progress, LLC (the licensee) requested an amendment to Shearon Harris Nuclear Power Plant, Unit 1 (HNP). The proposed amendment would revise the Technical Specification (TS) Surveillance Requirements (SRs).
SR 4.8.1.1.2.a.4, SR 4.8.1.1.2.e, SR 4.8.1.1.2.f.2, SR 4.8.1.1.2.f.4.b, SR 4.8.1.1.2.f.6.b, and SR 4.8.1.1.2.f.14 would restrict the steady-state voltage and frequency limits for emergency diesel generator (EOG) operation from plus or minus 10% of the nominal EOG voltage (6900 +/- 690 volts) to plus or minus 4% of the nominal EOG voltage (6900 +/- 276 volts), and frequency limit from plus or minus 0.8% of the nominal frequency (60 +/- 0.48 hertz), to plus or minus 2% of the nominal frequency (60 +/- 1.2 hertz). The licensee also requests to revise TS SR 4.8.1.1.2.f.11 to increase the voltage limit for the EOG full load rejection test from 110% to 120%.
The U.S. Nuclear Regulatory Commission (NRC) staff has determined the following request for additional information (RAI) is needed in order to complete its review.
Regulatory Requirements Title 10 of the Code of Federal Regulations, Appendix A of Part 50, General design criterion (GDC) 17, "Electric power systems," requires, in part, that an onsite electric power system and an offsite electric power system be provided to permit functioning of structures, systems, and components important to safety. The safety function for each system (assuming the other system is not functioning) shall be to provide sufficient capacity and capability to assure that (1) specified acceptable fuel design limits and design conditions of the reactor coolant pressure boundary are not exceeded as a result of anticipated operational occurrences and (2) the core is cooled and containment integrity and other vital functions are maintained in the event of postulated accidents. The onsite electric power supplies shall have sufficient independence, redundancy, and testability to perform their safety functions assuming a single failure.
Appendix A of 10 CFR Part 50, GDC 18, "Inspection and testing of electric power systems,"
requires that electric power systems important to safety shall be designed to permit appropriate periodic inspection and testing of important areas and features, such as wiring, insulation, connections, and switchboards, to assess the continuity of the systems and the condition of their components. The systems shall be designed with a capability to test periodically (1) the operability and functional performance of the components of the systems, such as onsite power sources, relays, switches, and buses, and (2) the operability of the systems as a whole and, under Enclosure conditions as close to design as practical, the full operation sequence that brings the systems into operation, including operation of applicable portions of the protection system, and the transfer of power among the nuclear power unit, the offsite power system, and the onsite power system.
EEOB RAI 1 Section 2.0, "Detail Description," of the license amendment request states:
"SR 4.8.1.1.2.f.2 verifies that during shutdown, on a rejection of a load of greater than or equal to 1078 kilowatts (kW), the EOG will maintain a voltage of 6900 +/- 690 volts and frequency of 60 +/- 6. 75 Hz, with frequency stabilizing to 60 +/- 1.2 Hz within 10 seconds without any safety-related load tripping out or operating in a degraded condition. This SR is being revised to limit the frequency stabilizing value to 60 +/- 0.48 Hz within 10 seconds without any safety-related load tripping out or operating in a degraded condition."
The NRC staff notes that the proposed changes to SR 4.8.1.1.2.f.2 only change the frequency values and not the voltage values. SR 4.8.1.1.2.f.2 keeps plus or minus 10% of the nominal voltage (6900 +/- 690 volts) instead of the plus or minus 4% of the nominal EOG voltage (6900 +/- 276 volts), as proposed in the license amendment request.
Please provide a discussion addressing this discrepancy. In your discussion, provide a summary of the analysis that demonstrates the steady-state voltage values of plus or minus 10% of the nominal voltage (6900 +/- 690 volts) is acceptable to SR 4.8.1.1.2.f.2 while only the frequency is changed in the proposed revision to the SR.
ML17360A013 OFFICE NRR/DORL/LPL2-2/PM NRR/DORL/LPL2-2/LA NAME MBarillas BCla ton DATE 01/02/2018 12/29/2017 OFFICE NRR/DORL/LPL2-2/BC NRR/DORL/LPL2-2/PM NAME UShoo RSchaaf for MBarillas DATE 01/02/2018 01/02/2018