ML17354A221
| ML17354A221 | |
| Person / Time | |
|---|---|
| Site: | Turkey Point |
| Issue date: | 02/01/1983 |
| From: | FLORIDA POWER & LIGHT CO. |
| To: | |
| Shared Package | |
| ML17354A219 | List: |
| References | |
| NUDOCS 8302070534 | |
| Download: ML17354A221 (2) | |
Text
h.
Any indicate of an unanticipated deficienc n some aspect of design or operation of safety related structures,
- systems, or components.
i.
Reports and meeting minutes of the Plant Nuclear Safety Com-mittee.
6.5.2.8 AUDITS Audits of facility activities shall be performed under the cognizance of the CNRB.
These audits shall encompass:
a.
The conformance of facility operation to all provisions contained within the Technical Specifications and applicable license conditions at least once per year.
b.
The performance, training and qual'ifications of the entire facility staff at least once per year.
c.
The results of all actions taken to correct deficiencies occurring in facility equipment, structures, systems or method of operation that affect nuclear safety at least once per six months.
d.
The performance of all activi ties required by the equality Assurance Program to meet the criteria of Appendix "B", 10 CFR 50, at least once per two years.
e.
The Emergency Plans and implementing procedures at least once per year.
f.
The Security Plan and implementing procedures at least once per year.
g.
The Facility Fire Protection Program and implementing procedures at least once per two years.
830 0 053 o00280 4 830201 PDR ADOCK PDR P
6-12
0 t
(i