Forwards Change a to Rev 1 to JNS-PTN-200, Second 10-Yr Inservice Insp Interval Inservice Testing Program for Pumps & Valves. Current Program Being Reviewed Against Requirements of Generic Ltr 89-04
ML17347B283
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 08/23/1989
From: Woody C
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML17347B284 List:
References
GL-89-04, GL-89-4, L-89-312, NUDOCS 8908300067
Download: ML17347B283 (15)


Text

AjCKLE~RATED D1STR1BUZON DEMONSTRATION SYrrZM REGULAR INFORMATION DISTRIBUTIO1%ZSTEM (RIDE)

ACCESSION NBR:8908300067 DOC.DATE: 89/08/23 NOTARIZED: NO DOCKET g FACIL:50-250 Turkey Point Plant, Unit 3, Florida Power and Light C 05000250 50-251 Turkey Point Plant, Unit 4, Florida Power and Light C 05000251

~

AUTH. NAME AUTHOR AFFILIATION WOODYFC.O. Florida Power 6 Light Co.

RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)

SUBJECT:

Forwards Change A to Rev 1 to "Second 10-Yr Inservice Insp Interval Inservice Testing Program for Pumps 6 Valves."

DISTRIBUTION CODE: A047D COPIES RECEIVED:LTR ENCL SIZE:

TITLE: OR Submittal: Inservice Inspection/Testing/Relief from AS E Code NOTES:

RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD2-2 LA 1 0 PD2-2 PD 5 EDISON,G 1 1 INTERNAL: AEOD/DSP/TPAB 1 NRR/DEST/MEB 9H 1 NRR/DEST/MTB 9H 1 NUDOCS-ABSTRACT 1 D '

OC/?IF;MB 1 0 OGC/HDS2 0 S EG.BI"IiEEh 01 RES/DSIR/EIB 1 G EXTERNAL: EGSrG BROWNFB 1 1 EGGG ROCKHOLDFH 1 1 LPDR 1 1 NRC PDR 1 1 NSIC 1 1 I

D NfTFO DlSTRla

~ M 0F FMCt.aaup u~'rosie D

D M7ZE TO ALL RIDS" RICIPZEPIS:

S PLEASE HELP US TO REDUCE %RDDE~ CGNI'ACT 'IHE DOCUMEÃZ CONTROL DESKF RDCN Pl-37 (EXT. 20079) KO ZKZKINATE KKR MNE HKH DISTEGBUTIGN LISTS XQR DOCUMEHIS %DU DCHFT NEEDf n1 TOTAL NUMBER OF COPIES REQUIRED: LTTR 20 ENCL

'I lu ~ '4 '

I'

P.O. Box14000, Juno Beach, FL 33408-0420 AUGUST, 2 5 1989 L-89-312 10 CFR 50.55a(g)

U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555 Gentlemen:

Re: Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 Inservice Testin Pro ram for Pum s and Valves Attached is the current Inservice Testing (IST) Program for Pumps and Valves (Revision 1, Change A) for Turkey Point Units 3 ~and 4.

It is being submitted to update the information previously submitted to you.

Since the second ten year submittal of the IST program on March 30, 1984, a number of administrative and technical changes have been made in order to enhance the program. The technical changes include additional testing of pumps and valves and revision, deletion and addition of relief requests'. Some of these changes have been identified by the NRC Staff and others through Florida Power & Light Company's (FPL's) implementation of the program.

Revision 1, Change A constitutes an inclusive summary of all program changes that have been incorporated.

FPL is reviewing the current program against the requirements of Generic Letter 89-04, "Guidance on Developing Acceptable Inservice Testing Programs", dated April 3, 1989, and will submit a revised program as required.

Changes included in the attached program which have not been previously submitted to the NRC, will be implemented in conjunction with additional program changes anticipated as a result of the generic letter with a schedule to be provided with the generic letter confirmatory response.

Should there be any questions regarding this information, please contact us.

Very truly yours, C. 0. Woody Acting Senior Vice President Nuclear COW/TCG/gp Attachment cc: Stewart D. Ebneter, Regional Administrator, Region II, USNRC Senior Resident Inspector, USNRC, Turkey Point Plant an FPL Group company, 8/08S00067 890823 1 PDR ADOCK 05000250 6 PNU

SUMMARY

OF CHANGES MADE TO THE IST PROGRAM SXNCE THE SECOND TEN YEAR SUBMITTAL OF 30 MARCH 1984 INTRODUCTION SINCE THE SECOND 10 YEAR SUBMITTAL OF THE IST PROGRAM OF 3 0 MARCH 1 984 g A NUMBER OF ADMINISTRAT IVE AND TECHN CAL CHANGES I HAVE BEEN MADE IN ORDER TO ENHANCE THE PROGRAM. THE TECHNICAL CHANGES INCLUDE, ADDITIONAL TESTING OF PUMPS AND VALVES AND REVIS ION g DELETXON AND ADDITION OF RELIEF REQUESTS SOME OF THESE CHANGES HAVE BEEN XDENTIFIED BY THE NRC STAFF AND OTHERS THROUGH FPL's IMPLEMENTATION OF THE PROGRAM. REVISXON 1, CHANGE A (ATTACHED) CONSTITUTES AN INCLUSIVE

SUMMARY

OF ALL PROGRAM CHANGES THAT HAVE BEEN INCORPORATED.

I S NCE MARCH 3 0 g I 1 9 8 4 g A NUMBER OF TECHN CAL CHANGES TO THE PROGRAM HAVE BEEN COMMUMICATED TO THE NRC THROUGH CORRESPONDENCE. THOSE CHANGES IDENTIFIED IN CORRESPONDENCE SINCE MARCH 30'984 HAVE BEEN FULLY IMPLEMENTED'HANGES INCLUDED IN THE ATTACHED PROGRAM (REV 1, CHG A)

WHICH HAVE NOT BEEN PREVXOUSLY SUBMITTED TO THE NRCg WILL BE IMPLEMENTED IN CONJUNCTION WITH ADDITIONAL PROGRAM CHANGES ANTICIPATED AS A RESULT OF THE GENERIC LETTER WITH A SCHEDULE TO BE PROVIDED WITH THE GENERIC LETTER CONFIRMATORY RESPONSE.

GENERAL CHANGES THE IST PROGRAM FORMAT HAS BEEN CHANGED TO MORE CLEARLY AND COMPLETELY STATE THE OBJECTIVES OF THE PROGRAM. THE PROGRAM PRESENTATION HAS BEEN SUBDIVIDED INTO A NUMBER OF SECTIONS NAMELY:

1. INTRODUCTION
2. DEVELOPMENT OF THE INSERVICE PUMP TEST PROGRAM
3. DEVELOPMENT OF THE INSERVICE VALVE TEST PROGRAM
4. RELIEF REQUESTS
5. 10 CFR 50, APPENDIX J, TESTING
6. RCS PRESSURE ISOLATION VALVE TESTXNG
7. PIPING AND INSTRUMENTATION DRAWINGS
8. RECORDS
9. INSERVICE TESTING PROGRAM PUMP AND VALVE TABLES RELXEF REQUESTS AND PROGRAM TABLES (SECTIONS 4 AND 9)

HAVE BEEN REFORMATTED IN ORDER TO CLARIFY THE INFORMATION PRESENTED AND TO PROVIDE ADDITIONAL INFORMATION.

Wg A+

0

SPECIFIC CHANGES RELIEF RE UESTS A NUMBER OF RELIEF REQUESTS HAVE BEEN REVISED g DELETED OR ADDED TO THE PROGRAM. THE SPECIFIC RELIEFS AFFECTED ARE OUTLINED BELOW.

PUMPS 1 ~ RELIEF REQUEST 5 1 HAS BEEN REVISED TO DELETE THE UNIT 3 CONTAINMENT SPRAY PUMPS AND HIGH HEAD SAFETY INJECTION PUMPS.

2 ~ RELIEF REQUESTS g 2g3 HAVE BEEN DELETED SINCE THEY ARE NO LONGER NECESSARY.

3. RELIEF REQUEST g 6 HAS BEEN REVISED TO MORE CLEARLY STATE THE ALTERNATIVE TESTING PROPOSED.

4 ~ RELIEF REQUESTS g 7,8 HAVE BEEN DELETED SINCE THEY ARE NO LONGER NECESSARY.

~ 5. RELIEF REQUESTS g 9 ~ 1 0 HAVE BEEN ADDED TO REQUEST RELIEF FROM INSTRUMENT RANGE REQUIREMENTS OF IWP-4120.

6. RELIEF REQUEST g 11 HAS BEEN ADDED TO REQUEST RELIEF FROM BEARING TEMPERATURE MEASUREMENT REQUIREMENTS OF IWP-4310.

7 ~ RELIEF REQUEST g 12 HAS BEEN ADDED TO REQUEST RELIEF FROM PUMP INLET PRESS. MEASUREMENT REQUIREMENTS OF IWP-3100.

VALVES REACTOR COOLANT SYSTEM

1. RELIEF REQUEST g 7 HAS BEEN DELETED SINCE IT IS NO LONGER NECESSARY.

CHEMICAL VOLUME AND CONTROL SYSTEM RELIEF REQUEST 4 2 HAS BEEN REVISED TO CLARIFY THE BASIS.

2. RELIEF REQUEST g 4 WAS DELETED AFTER THE FIRST TEN YEAR SUBMITTAL.

3 ~ RELIEF REQUEST 5 5 HAS BEEN REVISED TO CLARIFY

'BASIS AND ALTERNATIVE TESTING.

4. RELIEF REQUEST 8 9 HAS BEEN DELETED SINCE IT IS NO LONGER NECESSARY.

\

C'

\

y$

J'

'h C

I

CHEMICAL VOLUME AND CONTROL SYSTEM (Cont.)

5. RELIEF REQUEST 4 10 HAS BEEN REVISED TO CLARIFY THE VALVE FUNCTION.
6. RELIEF REQUEST g 11 HAS BEEN REVISED TO CLARIFY THE VALVE FUNCTION.

7 ~ RELIEF REQUEST g 12 HAS BEEN REVISED TO CLARIFY THE VALVE FUNCTION.

8. RELIEF REQUEST g 13 HAS BEEN REVISED TO CLARIFY THE VALVE FUNCTION AND BASIS FOR RELIEF.
9. RELIEF REQUEST g 15 HAS BEEN REVISED TO CLARIFY THE VALVE FUNCTION.

AUXILIARY COOLANT RESIDUAL HEAT REMOVAL

1. RELIEF REQUEST g 2 HAS BEEN REVISED TO CLARIFY THE VALVE FUNCTION.
2. RELIEF REQUEST g 3 HAS BEEN REVISED TO CLARIFY THE BASIS FOR RELIEF AND ALTERNATIVE TESTING.

SAFETY INJECTION SYSTEM 1 ~ RELIEF REQUEST 8 1 HAS BEEN DELETED SINCE IT IS NO LONGER NECESSARY.

2 ~ RELIEF REQUEST g 2 HAS BEEN DELETED SINCE IT IS NO LONGER NECESSARY.

3. RELIEF REQUEST 5 3 HAS BEEN REVISED TO CLARIFY THE ALTERNATIVE TESTING.

4 ~ RELIEF REQUEST g 4 HAS BEEN REVISED TO CLARIFY THE ALTERNATIVE TESTING.

5. RELIEF REQUEST 5 5 HAS BEEN REVISED TO CLARIFY THE VALVE FUNCTION.
6. RELIEF REQUESTS g 7 g 8 J 9 HAVE BEEN REVISED TO RECATEGORIZE THE VALVES AND CLARIFY THE VALVE FUNCTIONS AND ALTERNATIVE TESTING.
7. RELIEF REQUEST g 10 HAS BEEN REVISED TO CLARIFY THE FUNCTION AND ALTERNATIVE TESTING.
8. RELIEF REQUEST 5 14 HAS BEEN REVISED TO CLARIFY THE VALVE FUNCTION.
9. RELIEF REQUEST 5 15 HAS BEEN REVISED TO CLARIFY THE VALVE FUNCTION AND ALTERNATIVE TESTING.
10. REL1EF REQUEST 0 16 HAS BEEN REVISED TO RECATEGORIZE THE VALVES AND CLARIFY THE VALVE FUNCTION.
11. RELIEF REQUEST g 17 HAS BEEN REVISED TO CLARIFY THE VALVE FUNCTION AND ALTERNATIVE TESTING.
12. RELIEF REQUEST 5 18 HAS BEEN DELETED AND INCORPORATED IN RELIEF REQUEST g 14.

I T

J C"

k~

SAFETY INJECTION SYSTEM (Cont.)

13. RELIEF REQUEST 8 19 HAS BEEN REVISED TO CLARIFY THE FUNCTION AND ALTERNATIVE TESTING.

14 'ELIEF REQUEST f20 HAS BEEN WITHDRAWN'INCE THESE VALVES HAVE BEEN REPLACED.

15. RELIEF REQUEST 5 21 HAS BEEN REVISED TO CLARIFY THE VALVE NUMBERS.
16. RELIEF REQUEST g 22 IS NEW AND HAS BEEN ADDED TO SPECIFY ADDITIONAL ALTERNATIVE TESTING TO BE PERFORMED ON CHECK VALVES.

SAMPLING SYSTEM

1. RELIEF REQUEST 4 1 HAS BEEN DELETED SINCE IT IS NO LONGER NECESSARY.

AUXILIARY COOLANT COMPONENT COOLING SYSTEM 1~ RELIEF REQUESTS g 1 g 2 WERE DELETED AFTER THE FIRST TEN YEAR PROGRAM SINCE THEY WERE NO LONGER NECESSARY.

2. RELIEF REQUEST g 4 HAS BEEN DELETED AND COMBINED WITH RELIEF REQUEST 8 3.

CONDENSATE AND FEEDWATER SYSTEM

1. RELIEF REQUESTS g 1,2 HAVE BEEN DELETED SINCE THEY ARE NO LONGER NECESSARY.
2. RELIEF REQUEST 4 4 HAS BEEN REVISED TO CLARIFY THE BASIS FOR RELIEF AND ALTERNATIVE TESTING.
3. RELIEF REQUEST 8 5 HAS BEEN ADDED TO THE PROGRAM FOR A NUMBER OF NEW VALVES ADDED TO THE PROGRAM FOR THIS SYSTEM.

DIESEL OIL SYSTEM

1. RELIEF REQUEST 5 2 HAS BEEN REVISED TO CLARIFY THE BASIS FOR RELIEF AND THE ALTERNATIVE TESTING.
2. RELIEF REQUEST g 3 HAS BEEN REVISED TO CLARIFY THE VALVE NUMBER.

g l

VALVES ADDED TO THE IST PROGRAM CONDENSATE AND FEEDWATER SYSTEM 1 ~ FCV

3 ~ SV

  • 6275A1 i Bl i Cl BYPASS S/G BLOWDOWN ISOLATION VALVES.

COMPONENT COOLING WATER SYSTEM

1. CV-*-739-CCW FROM EXCESS LETDOWN HEAT EXCHANGERS.

SPENT FUEL PIT COOLING SYSTEM

1. *-911,914- "A AND B>> SPENT FUEL COOLING PUMP DISCHARGE CHECK VALVES.

STEAM SUPPLY SYSTEM 1~ MOV

VALVES DELETED FROM THE IST PROGRAM AUXILIARY COOLANT RESIDUAL HEAT REMOVAL SYSTEM

1. *-741A- THIS VALVE HAS'EEN DELETED FROM THE IST PROGRAM SINCE IT IS NOW LOCKED CLOSED AND CATEGORI ZED B PASS IVE i REQUIRING NO CODE TESTING.

4,C %1 COO G SYS E 1

  • 911i914 nA AND B<> SPENT FUEL COOLING PUMP DISCHARGE CHECK VALVES~

SU PL S S E 1 ~ MOV

V LVES D LETED F 0 IS OG U I COO R UA A MOV L SYSTEM

1. *-741A- THIS VALVE HAS BEEN DELETED FROM THE IST PROGRAM SINCE IT IS NON LOCKED CLOSED AND CATEGORIZED "B PASSIVE/

REQUIRING, NO CODE TESTING.

a>

,4 7

r'i pl,

~ t