ML17347B271

From kanterella
Jump to navigation Jump to search
Forwards Monthly Operating Repts for Jul 1989 for Turkey Point Units 3 & 4 & St Lucie Units 1 & 2 & Corrected Monthly Operating Repts for June 1989 for Turkey Point Units 3 & 4
ML17347B271
Person / Time
Site: Saint Lucie, Turkey Point, 05000000
Issue date: 08/15/1989
From: Woody C
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML17347B272 List:
References
L-89-290, NUDOCS 8908240040
Download: ML17347B271 (4)


Text

ACCELERATED DIST3UTION DEMONSTRA+N SYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR: 8908240040 DOC. DATE: 89/08/15 NOTARIZED: NO DOCKET FACIL:50-000 Generic Docket 05000000 50-250 Turkey Point Plant, Unit 3, Florida Power and Light C 05000250 50-251 Turkey Point Plant, Unit 4, Florida Power and Light C 05000251 50-335 St. Lucie Plant, Unit 1, Florida Power & Light, Co. 05000335 50-389 St. Lucie Plant, Unit 2, Florida Power & Light Co. 05000389 AUTH. NAME AUTHOR AFFILIATION WOODY,C.O. Florida Power & Light Co.

RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)

S UBJECT: Forwards monthly operating repts for Jul 1989 for Turkey Point Units 3 & 4 & St Lucie Units 1 & 2.

DISTRIBUTION .CODE: IE24D COPIES RECEIVED:LTR ENCL SIZE:

TITLE: Monthly Operating Report (per Tech Specs NOTES:

RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD2-2 LA 3 3 PD2-2 PD 1 1 EDISON,G 1 1 NORRIS,J 1 1 INTERNAL: ACRS 10 10 AEOD/DOA 1 AEOD/DSP/TPAB 1 1 IRM TECH ADV 2 NRR/DLPQ/PEB 10 1 1 NRR/DOEA/EAB 11 1 1 1 NUDOCS-ABSTRACT 1 1 1 RGN2 1 EXTERNAL: EG&G SIMPSON,F 1 1 LPDR NRC PDR 1 1 NSIC A

TOTAL NUMBER OF COPIES REQUIRED: LTTR 31 ENCL 31

+ t'w lk 0 r I

P.O. Box 14000, Juno Beach, FL 33408-0420 AUGUKB 1 5 1989 L-89-290 10 CFR 50. 36 U. S ~ Nuclear Regulatory Commission Attn: Document Control Desk Washington, D~ C. 20555 Gentlemen:

RE: Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 St. Lucie Units 1 and 2 Docket Nos. 50-335 and 50-389 Month 1 0 erat in Re ort Attached are the July 1989 Operating Status Reports and Summary of Operating Experience Reports for Turkey Point Unit s 3 and 4, and St. Lucie Units 1 and 2 .

Also attached is a corrected copy of the June 1989 "Unit Shutdowns and Power Reductions" sheets for Turkey Point Units 3 and 4 .

Shutdown No. 05 for Unit 3 was 568 . 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> instead of the reported 580 9 hours1.041667e-4 days <br />0.0025 hours <br />1.488095e-5 weeks <br />3.4245e-6 months <br />.

~ For Unit 4, shutdown No. 15 should have been 26 2 ~

hours versus 26. 1 hours.

Very truly yours,

~ ~

C~ 0 ~ Woody Acting Senior Vice President Nuclear COW/DMB Attachments cc: Stewart D. Ebneter, Regional Administrator,'egion II, USNRC Senior Resident Inspector, USNRC, Turkey, Point Plant Senior Resident Inspector, USNRC, St. Lucie Plant 8908240040 8908 i 5 PDR ADOCK 05000250 PDC an ppg Group companY

Ql e

~- ~

~ W