L-89-290, Forwards Monthly Operating Repts for Jul 1989 for Turkey Point Units 3 & 4 & St Lucie Units 1 & 2 & Corrected Monthly Operating Repts for June 1989 for Turkey Point Units 3 & 4
| ML17347B271 | |
| Person / Time | |
|---|---|
| Site: | Saint Lucie, Turkey Point, 05000000 |
| Issue date: | 08/15/1989 |
| From: | Woody C FLORIDA POWER & LIGHT CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| Shared Package | |
| ML17347B272 | List: |
| References | |
| L-89-290, NUDOCS 8908240040 | |
| Download: ML17347B271 (4) | |
Text
ACCELERATED DIST3UTION DEMONSTRA+N SYSTEM ACCESSION NBR:
FACIL:50-000 50-250 50-251 50-335 50-389 AUTH.NAME WOODY,C.O.
RECIP.NAME REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS) 8908240040 DOC. DATE: 89/08/15 NOTARIZED: NO Generic Docket Turkey Point Plant, Unit 3, Florida Power and Light C Turkey Point Plant, Unit 4, Florida Power and Light C St. Lucie Plant, Unit 1, Florida Power
& Light, Co.
St. Lucie Plant, Unit 2, Florida Power
& Light Co.
AUTHOR AFFILIATION Florida Power
& Light Co.
RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)
DOCKET 05000000 05000250 05000251 05000335 05000389
SUBJECT:
Forwards monthly operating repts for Jul 1989 for Turkey Point Units 3
& 4
& St Lucie Units 1
& 2.
DISTRIBUTION.CODE:
IE24D COPIES RECEIVED:LTR ENCL SIZE:
TITLE: Monthly Operating Report (per Tech Specs NOTES:
RECIPIENT ID CODE/NAME PD2-2 LA EDISON,G INTERNAL: ACRS AEOD/DSP/TPAB NRR/DLPQ/PEB 10 EXTERNAL: EG&G SIMPSON,F NRC PDR COPIES LTTR ENCL 3
3 1
1 10 10 1
1 1
1 1
1 1
1 1
1 1
1 RECIPIENT ID CODE/NAME PD2-2 PD NORRIS,J AEOD/DOA IRM TECH ADV NRR/DOEA/EAB 11 NUDOCS-ABSTRACT RGN2 LPDR NSIC COPIES LTTR ENCL 1
1 1
1 1
2 1
1 1
A TOTAL NUMBER OF COPIES REQUIRED:
LTTR 31 ENCL 31
lk 0
+ t'w r
I
P.O. Box 14000, Juno Beach, FL 33408-0420 AUGUKB 1 5 1989 L-89-290 10 CFR 50. 36 U.
S
~ Nuclear Regulatory Commission Attn: Document Control Desk Washington, D ~
C.
20555 Gentlemen:
RE:
Turkey Point Units 3 and 4
Docket Nos.
50-250 and 50-251 St. Lucie Units 1 and 2
Docket Nos.
50-335 and 50-389 Month1 0 erat in Re ort Attached are the July 1989 Operating Status Reports and Summary of Operating Experience Reports for Turkey Point Units 3 and 4, and St. Lucie Units 1 and 2.
Also attached is a corrected copy of the June 1989 "Unit Shutdowns and Power Reductions" sheets for Turkey Point Units 3
and 4.
Shutdown No.
05 for Unit 3 was 568. 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> instead of the reported 580
~ 9 hours1.041667e-4 days <br />0.0025 hours <br />1.488095e-5 weeks <br />3.4245e-6 months <br />.
For Unit 4, shutdown No.
15 should have been 26 ~ 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> versus
- 26. 1 hours1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />.
Very truly yours,
~
~
C ~
0 ~
Woody Acting Senior Vice President Nuclear COW/DMB Attachments cc:
Stewart D. Ebneter, Regional Administrator,'egion II, USNRC Senior Resident Inspector,
. Turkey,Point Plant Senior Resident Inspector, USNRC, St. Lucie Plant 8908240040 8908 i5 PDR ADOCK 05000250 PDC an ppg Group companY
Ql e
~- ~
~ W