L-89-290, Forwards Monthly Operating Repts for Jul 1989 for Turkey Point Units 3 & 4 & St Lucie Units 1 & 2 & Corrected Monthly Operating Repts for June 1989 for Turkey Point Units 3 & 4

From kanterella
(Redirected from L-89-290)
Jump to navigation Jump to search
Forwards Monthly Operating Repts for Jul 1989 for Turkey Point Units 3 & 4 & St Lucie Units 1 & 2 & Corrected Monthly Operating Repts for June 1989 for Turkey Point Units 3 & 4
ML17347B271
Person / Time
Site: Saint Lucie, Turkey Point, 05000000
Issue date: 08/15/1989
From: Woody C
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML17347B272 List:
References
L-89-290, NUDOCS 8908240040
Download: ML17347B271 (4)


Text

ACCELERATED DIST3UTION DEMONSTRA+N SYSTEM ACCESSION NBR:

FACIL:50-000 50-250 50-251 50-335 50-389 AUTH.NAME WOODY,C.O.

RECIP.NAME REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS) 8908240040 DOC. DATE: 89/08/15 NOTARIZED: NO Generic Docket Turkey Point Plant, Unit 3, Florida Power and Light C Turkey Point Plant, Unit 4, Florida Power and Light C St. Lucie Plant, Unit 1, Florida Power

& Light, Co.

St. Lucie Plant, Unit 2, Florida Power

& Light Co.

AUTHOR AFFILIATION Florida Power

& Light Co.

RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)

DOCKET 05000000 05000250 05000251 05000335 05000389

SUBJECT:

Forwards monthly operating repts for Jul 1989 for Turkey Point Units 3

& 4

& St Lucie Units 1

& 2.

DISTRIBUTION.CODE:

IE24D COPIES RECEIVED:LTR ENCL SIZE:

TITLE: Monthly Operating Report (per Tech Specs NOTES:

RECIPIENT ID CODE/NAME PD2-2 LA EDISON,G INTERNAL: ACRS AEOD/DSP/TPAB NRR/DLPQ/PEB 10 EXTERNAL: EG&G SIMPSON,F NRC PDR COPIES LTTR ENCL 3

3 1

1 10 10 1

1 1

1 1

1 1

1 1

1 1

1 RECIPIENT ID CODE/NAME PD2-2 PD NORRIS,J AEOD/DOA IRM TECH ADV NRR/DOEA/EAB 11 NUDOCS-ABSTRACT RGN2 LPDR NSIC COPIES LTTR ENCL 1

1 1

1 1

2 1

1 1

A TOTAL NUMBER OF COPIES REQUIRED:

LTTR 31 ENCL 31

lk 0

+ t'w r

I

P.O. Box 14000, Juno Beach, FL 33408-0420 AUGUKB 1 5 1989 L-89-290 10 CFR 50. 36 U.

S

~ Nuclear Regulatory Commission Attn: Document Control Desk Washington, D ~

C.

20555 Gentlemen:

RE:

Turkey Point Units 3 and 4

Docket Nos.

50-250 and 50-251 St. Lucie Units 1 and 2

Docket Nos.

50-335 and 50-389 Month1 0 erat in Re ort Attached are the July 1989 Operating Status Reports and Summary of Operating Experience Reports for Turkey Point Units 3 and 4, and St. Lucie Units 1 and 2.

Also attached is a corrected copy of the June 1989 "Unit Shutdowns and Power Reductions" sheets for Turkey Point Units 3

and 4.

Shutdown No.

05 for Unit 3 was 568. 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> instead of the reported 580

~ 9 hours1.041667e-4 days <br />0.0025 hours <br />1.488095e-5 weeks <br />3.4245e-6 months <br />.

For Unit 4, shutdown No.

15 should have been 26 ~ 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> versus

26. 1 hours1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />.

Very truly yours,

~

~

C ~

0 ~

Woody Acting Senior Vice President Nuclear COW/DMB Attachments cc:

Stewart D. Ebneter, Regional Administrator,'egion II, USNRC Senior Resident Inspector,

USNRC,

. Turkey,Point Plant Senior Resident Inspector, USNRC, St. Lucie Plant 8908240040 8908 i5 PDR ADOCK 05000250 PDC an ppg Group companY

Ql e

~- ~

~ W