Text
ACCELE RATED
DISTRIBUTION
DEMO%STRA.TIO.'i
SYSTEM
REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
ACCESSION NBR:8903150480
DOC.DATE: 89/03/01
NOTARIZED: NO
DOCKET
FACIL:50-250 Turkey Point Plant, Unit 3, Florida Power
and Light C
05000250
50-251 Turkey Point Plant, Unit 4, Florida Power
and Light C
05000251
UTH.NAME
AUTHOR AFFILIATION
ULIAN,C.A.
Region 2, Ofc of the Director
RECIP.NAME
RECIPIENT AFFILIATION
CONWAYgW.F.
Florida Power
& Light Co.
SUBJECT: Forwards
Insp Repts
50-250/89-04
a 50-251/89-04
on
890130-0203.No violations or deviations
noted.
DISTRIBUTION CODE:
IE01D
COPIES
RECEIVED:LTR
ENCL
SIZE:
TITLE: General
(50 Dkt)-Insp Rept/Notice of Violation Response
NOTES:
RECIPIENT
ID CODE/NAME
PD2-2
INTERNAL: AEOD
DEDRO
NRR/DEST DIR
NRR/DLPQ/QAB 10
NRR/DREP/EPB
10
NRR/DRIS DIR 9A
NUDOCS-ABSTRACT
OGC/HDS2
RGN2
FILE
01
COPIES
LTTR ENCL
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
RECIPIENT
ID CODE/NAME
EDISON,G
AEOD/DEIIB
NRR SHANKMANgS
NRR/DLPQ/PEB 11
NRR/DOEA DIR 11
NRR/DREP/RPB
10
NRR/PMAS/ILRB12
OE LIEBERMANiJ
COPIES
LTTR ENCL
1
1
1
1
1
-1
1
1
1
1
2
2
1
1
1
1
-1
'1
ERNAL: LPDR
1
1
1
1
NRC PDR
1
1
NOIR 'IO ALL 'RIDS"
RECIPZEPIS'LEASE
HELP US 'io REDUCE HASTE.'XM'ACT '%HE DOQJMEÃZ CON'ZROL DESK,
ROCK Pl-37
(EXT. 20079) m EZiQGZLTE YOUR NAME FRCH DIBIIGBVZZQN
LISTS FOR DOCUMENIS KRJ DON'T NEEDf
TOTAL NUMBER OF COPIES
REQUIRED:
LTTR
23
ENCL
23
Docket Nos.
50-250,
50-251
License
Nos.
Florida Power and Light Company
ATTN:
Mr.
W.
F.
Conway
Senior Vice President
- Nuclear
P. 0.
Box 14000
Juno
Beach,
FL
33408-0420
Gentlemen:
SUBJECT'RC
INSPECTION
REPORT
NOS. 50-250/89-04
AND 50-251/89-04
This refers
to. the Nuclear Regulatory
Commission
(NRC) inspection
conducted
by J.
R. Harris
on January
30 - February 3,
1989.
The inspection
included
a
review of activities
authorized
for your Turkey Point facility.
At the
conclusion of the inspection,
the findings were discussed
with those
members
of your staff identified in the enclosed
Inspection
Report.
Areas
examined
during the inspection are identified in the report.
Within these
areas,
the
inspection
consisted
of selective
examinations
of procedures
and
representative
records,
interviews with personnel,
and observation of activities
in progress.
Within the scope of the inspection,
no violations or deviations
were identified.
In accordance
with Section 2.790 of the
NRC's
"Rules of Practice,"
Part 2,
Title 10,
Code of Federal
Regulations,
a copy of this letter and its enclosure
will be placed in the
NRC Public Document
Room.
Should you have
any questions
concerning this letter,
please
contact us.
Sincerely,
Enclosure:
NRC Inspection
Report
/S/
Caudle
A. Julian, Chief
Engineering
Branch
Division of Reactor Safety
cc w/encl:
J.
S.
Odom, Vice President
Turkey Poin. Nuclear Plant
J.
E. Cross,
Plant Manager
Turkey Point Nuclear Plant
L.
W. Bladow, Plant
gA Superintendent
J. Arias, Jr.,
Regulatory
and Compliance
.
Supervisor
State of Florida
bcc:
(See
Page
2)
~ rs(> q g'=<<.>4..:fi 85'(~301
P<)R
AKiQik 050002'~O
ri'GC
MAR 0.1 @9
Flori da
Power and Light Company
bcc w/encl:
G.
E. Edison, Project Manager,
Project
Directorate II-2, Division of Reactor
Projects,
NRC, Resident
Inspector
DRS Technical Assistant
Document Control
Desk
t
RII
JHaP8i s: svh
02/~)/89
RC len ak
02
9
>(G s
RI I .I,9
RI
TConl on
02/)q /89