ACCESSION NBR: 8703110044 DQC. DATE: 87/03/02 NOTARIZED:
NO DOCKET 0 FACIL:50-250 Turkey Point Plant.
Unit 3i Florida Power and'ight C
05000250 50-251 Turkey Point Plant.
Unit 4i Florida Power and Light C
05000251 AUTH. MANE AUTHOR AFFILIATION MOODY'. O.
Florida Power Zc Light Co.
RECIP. NANE RECIPIENT AFFlLIATIGN Document Control Branch (Document'ontrol Desk)
SUBJECT:
Informs that completion of installation of spent fuel pit cooling pump floe measurement devices expected prior to Cycle 11 5 12 refueling outages for Units.'3 Sc 4i respectivelgi per 851226 ltr 8c discussion w/DQ-NcDonald.
DISTRXBUTION CODE:
A047D COPIES RECEIVED: LTR ENCL SX ZE:
TXTLE:
OR Submittal:
Inservice Inspection/Testing NOTES:
'EClPIENT ID CODE/NANE PMR-A ADTS PHRS PD2 LA NcDONALDp D INTERNAL: ADN/LFNB NRR/DSRQ/EIB OGC/HDS2 COPIES LTTR ENCL 1
1 0
1 1
1 0
1 1
1 0
RECIPXENT ID CODE/NAME PWR-A EB PWR-A PD2 PD 04 AEOD/PTB C OP IES LTTR ENCL 1
5 5
EXTERNAL:'LPDR NSXC 03 05 1
1 1
NRC PDR 02, TOTAL NUNBER OF COPIES REQUIRED: LTTR, 18 ENCL 15
>>I
,,<<>>/('
1 h
P'-.;
I f. t >'
c>>,,
k
>> >>'f >kl 1 ii il 1
1
-1 r
w p 41 Q f>> P ", ><>I ~ 0 t>
<<1 ig I"
I<<>i I
-g Q
I I <<1
~ i, h.ill
>I l>h 1
JI IP 'kii>>i il l>>ff 4',
I>>
I
'I >>,i'I h
1 ~
>>I
) <
',.',1'<<J;f if%'I'I'i "'(kiAa
, <<'Vo 1 0'..9]P ""
s 1;,'"I 1~
I,
."~:t..
I h
1 l
>1 1<<
lh<<4 i
1
)'"":i/h.<<g j P (""
,"kh>,I" k I ihi 10 Ili,'
'I'1 'J~ >15'>III
>'<<>>'I ll<<<<<<g )
> f,>>t>lgkl 1
P. O. Bo 0, JUNO BEACH, FL 33408-0420 lkARGH L-87-89 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555 Gentlemen:
Re:
Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-25 I S ent Fuel Pit Coolin Purn Flow Measurement Devices By letter (L-84-238) dated October 24, 1984, Florida Power 8 Light Company (FPL) added the spent fuel pit (SFP) cooling pumps to the pump and valve inservice test (IST) program for Turkey Point Units 3 and 4, and requested relief from IWP-4600 test requirements until flow measurement devices could be installed.
The implementation date for conformance with the ASME code test requirements was January I, 1986.
By letter (L-85-465) dated December 26, l985 and supplemented on August 20, l 986 (L-86-320), FPL requested a schedule extension.
Our December 26, l985 letter
- stated, in response to a
question from the NRC Staff, that the modifications would be made prior to the offload and storage of freshly discharged fuel (when the heat load on the SFP cooling system is low) for the Unit 3 Cycle I I and Unit 4 Cycle l2 refueling outages.
That letter also stated that this precaution will not be necessary if the work can be done without affecting SFP cooling system operation.
By letter dated September I8, l986 you granted the requested relief, further stating that conformance with the code testing requirements for the SFP cooling pumps would be achieved no later than the beginning of the Unit 3 Cycle I I and Unit 4 Cycle l2 refueling outages.
Your letter did not address the alternative where SFP cooling system operation would not be affected.
SX00<< 87030 PDR ADOCK 05000250 P
PDR an FPL GrouP comPany TCG6/020/ I
~
~ 0
'I Ct ~ ~ ~,I ~ ~
~ I
~
~
W~rr e'"
r
U. S. Nuclear Regulatory Commission L-87-89 Page two The required modifications can be made without impacting operation of the SFP cooling system.
As discussed with Mr. D. G. McDonald, FPL now intends to complete the installation of the flow measurement device prior to the end of the Unit 3 Cycle I I and Unit 4 Cycle l2 refueling outages as stated in our December 26, l985 letter.
lf there are any questions, please call us.
Very truly yours, C. O. Wood Group Vi resident Nuclear ergy COW/TCG/gp cc: