L-86-320, Discusses Rev to Inservice Test Program for Pumps & Valves. Flow Measure Device Will Be Installed on Spent Fuel Pit Cooling Sys Prior to Offload & Storage of Discharged Fuel
| ML17342A667 | |
| Person / Time | |
|---|---|
| Site: | Turkey Point |
| Issue date: | 08/20/1986 |
| From: | Woody C FLORIDA POWER & LIGHT CO. |
| To: | Mcdonald D Office of Nuclear Reactor Regulation |
| References | |
| L-86-320, NUDOCS 8608260149 | |
| Download: ML17342A667 (4) | |
Text
4 A
REQUL*
>RY INFGR1'1ATIGN DISTR IBUTI SYSTE1'1 (R IDS)
ACCESSION NOR: 8608260i49 DGC. DATE: 86/08/20 NOTARIZED-NO FACIL: 50-250 Tuv I eg Point Plant~
Unit 3i Flov ida Powev and Light C
50-25i Tuv 1:eg Point Plant>
Unit 4i Flov ida Powev and Light C AUTH. NAI'1E AUTHOR AFFILIATION MOODY~ C. O.
Flor ida Powev Zc Light Co.
RECIP NANE RECIPIENT AFFILIATION 1'1CDONALD> D. G.
P1lR Pv object Div'ectorate 2
SUBJECT:
Discusses v ev to inservice test pv'ogram fov pumps
~c valves.
Flow measure device will be installed on spent fuel pit cooling sos pv'iov'o offload i~< stov'age of discharged fuel.
DISTRIBUTION CODE:
A047D COP IEB RECEIVED: LTR ENCL SI ZE:
TITLE:
GR Submittal:
Insev vice Inspection/Testing NOTES:
DOCKET 05000250 0500025i REC IP IENT ID CODE/NANE PWR-A ADTS PNR-A PD2 LA 11c DONALD, D COPIES LTTR ENCL RECIPIENT ID CODE/NAHE PWR-A EB PNR-A PD2 PD Oi COPIES LTTR ENCL i
1 INTER NAL ADI'1/LFl'19 ELD/HDS4 NRR/TANG RCN2 EXTERNAL LPDR NSIC 03 05 AEGD/PTB EIB NRC PDR 04 02 TOTAL NU1'1BER GF COPIEB REQUIRED'TTR i9 ENCL
J t
~
4 il k
M
FLORIDAPOWER & LIGHT COMPANY Ne 2 O Ippp L-86-320 Office of Nuclear Reactor Regulation Attention: Mr. D. G. McDonald, Project Manager PWR Project Directorate II2 Division of P WR Licensing - A U. S. Nuclear Regulatory Commission Washington, D.C.
20555
Dear Mr. McDonald:
Re:
Turkey Point Units 3 R 4 Docket Nos. 50-250 and 50-251 Revision to Inservice Test Program For Pum s and Valves Florida Power R Light Company submitted a revision to the Inservice Test (IST)
Program for Pumps and Valves for Turkey Point. Units 3 and 4 in letter L-84-238 dated October 24, 1984 which added, among other components, the spent fuel pit (SFP) cooling pumps to the program, and requested relief from IWP-4600 test requirements until flow measurement devices could be installed.
The effective date of implementation for the SFP cooling pumps was predicated upon completion of the modifications that are required to do the testing.
In letter L-85-465 dated December 26,
- 1985, we stated that the
- design, procurement, and installation of the SFP cooling pump flow measurement devices would be done concurrent with the SFP cooling system
- upgrades, which we committed to have completed by the end of the Unit 3 Cycle 11 and Unit 4 Cycle 12 refueling outages.
In response to your question regarding installation of the flow measuring device, it is our intent to install the device when the heat load on the SFP cooling system is low.
This would be prior to the off load and storage of freshly discharged fuel.
This precaution will not be necessary if the work can be done without affecting SFP cooling system operation.
If you have any further questions, please call us.
Very tr ly yours, C. O. Woody Group Vice President Nuclear Energy COW/TCG/aa cc:
Dr. 3. Nelson Grace, Region Ll:1 8608260149 862820 PDR ADOCK 05000250 P