Text
Doc)et Nos. 50-250 and 50-251 PESO 9 <er Mr. C. 0. Woody, Group Vice President Nuclear Energy Department Florida Power and Light Company Post Office Box 14000 Juno Beach, Florida 33408
Dear Mr. Woody:
DISTRIBUTION c~.
NRC PDR Local PDR PAD¹2 Rdg T. Novak OGC-Bethesda E. Jordan B. Grimes J. Partlow N. Thompson D. McDonald D. Miller ACRS (10)
Gray File
Subject:
Turkey Point Plant Site Visit Post-Implementation Audit of the Safety Parameter Display System (SPDS)
The NRC staff has requested a site visit on March 23 through 25, 1987, to perform a post-implementation audit of the SPDS at the Turkey Point Plant Units 3 and 4.
I have discussed this effort with members of your staff and provided them a proposed agenda.
A copy of the proposed agenda is also enclosed.
I will provide you a list of attendees and their social security numbers prior to the visit.
Please contact me if there are any questions or other arrangements to be made.
Sincerely,
Enclosure:
As stated cc w/enclosure:
See next page Daniel G. McDonald, Senior Project Manager PWR Project Directorate ¹2 Division of PWR Licensing-A 2/
/87
- PAD¹2 DMcDonald:hc 2/0,/87 PD:PAD¹2 LRubenstein 2/ 4/87 8702170326 870209 PDR kDOCK 05000250 P
PDR;
C a) 4'4
Mr. C. 0.
Woody Florida Power and Light Company Turkev Point Plant CC:
Harold F. Reis, Esquire Newman and Holtzinger, P.C.
1615 L Street, N.W.
Washington, DC 20036 Mr. Jack Shreve Office of the Public Counsel Room 4, Holland Building Tallahassee, Florida 32304 Norman A. Coll, Esquire
- Stee1, Hector and Davis 4000 Southeast Financial Center Miami,'lorida 33131-~398 Mr. C. M. Wethy, Vice President Turkey Point Nuclear Plant Florida Power and Light Company P.O.
Box 029100 Miami, Florida 33102 Mr. M. R. Stierheim County Manager of Metropolitan Dade County Miami, Florida 33130 Resident Inspector U.S. Nuclear Regulatory Commission Turkey Point Nuclear Generating Station Post Office Box 57-1185 Miami, Florida 33257-1185 Mr. Allan Schubert, Manager Office of Radiation Control Department of Health and Rehabilitative Services l317 Winewood Blvd.
Tallahassee, Florida 32301 Intergovernmental Coordination and Review Office of Planning A Budget Executive Office of the Governor The Capitol Building Tallahassee, Florida 32301 Administrator Department of'nvironmental Regulation Power Plant Siting Section State of Florida 2600 Blair Stone Road Tall ahassee, Flori da 32301 Re 9iona 1 Admini s tra tor, Regi on II U.S. Nuclear Regulatory Commission Suite 2900 10I Marietta Street Atlanta, Georoia 30323 Martin H. Hodder, Esquire 1131 NE, 86th Street Miami, Florida 33138 Joette Lorion 7269 SW, 54 Avenue Miami, Florida 33143 Mr. Chris J. Baker, Plant Manager Turkey Point Nuclear Plant Florida Power and Light Company P.O.
Box 029100 Miami, Florida 33102 Attorney General Department of Legal Affairs The Capitol Tallahassee, Florida 32304
ENCLOSURE PPOPOSED AGENDA FOR POST-IMPLFMENTATION AUDIT OF TURKEY POINT NUCLEAR POWER PLANT, UNITS 3 AND 4 SAFETY PARAMETER DISPLAY SYSTEM (SPDS)
(3/23 through 3/25/87)
DAY 1 (3/23/87)
Noon 12:15 p.m.
2:15 p.m.
2:30 p.m.
4:00 p.m.
DAY 2 (3/24/87)
Introduction and Briefing (NRC)
Overview of SPDS Implementation (Presentations by Licensee)
Definition of SPDS Parameter Selection Process Human Factors Engineering Program Rel iabi 1 ity Verificat ion and Validati on Program Implementation Program Project Milestones Break Tour of Control Room/SPDS Demonstration Adjourn 8:00 a.m.
9:30 a.m.
9:45 a.m.
Critical Safet Function/Parameter Selection (Presentations by licensee Parameter Selection Critical Safety Functions (vs.
Critical Safety Functions/Parameter Relationships Range of Events/Conditions covered by parameters Safety Evaluation Report Concerns Break
~St D
i fP ti b
Lh
System Description
Display Configuration Data Validity Security
PROPOSEA AGENAA (continued)
S stem Verification and Validation (Presentations by Licenseel Verification Test Plan Validation Maintenance It Configuration Control 11:30 a.m.
Lunch 1:00 p.m.
Human Factors Enaineerinq Review (Control Rooml Display Location Display Format Display Techniques Open Concerns 0 erations Review (Control Room)
Concise Display Parameters identified in SAR on SPDS Critical Safety Functions (0737 and Plant>
Reliability (Hardware/Softwarel
Response
Times (Display Call-up and Screen Updatel Integrated into Emergency Operations SPDS Parameter Values vs. Fixed Panel Values (Comparison)
Procedures and Training Control Room SPDS vs. Simulator SPDS Comparison Electrical Isolation (This should be omitted if covered by a separate rev ew 4:30 p.m.
Adiourn BAY 3 (3/25/87) 8:00 a.m.
Operator Interviews Shift Supervisor Reactor Operator Shift Technical Advisor 9:30 a.m.
ll:30 a.m.
Documentation Peview Audit Team Caucus Exit Briefing
~'