Requests Addl Info Re Proposed Tech Specs for Reactor Vessel Level Monitoring Sys Submitted w/860718 Ltr.Action Statement 9 Inappropiate Since Statement Permits Restart W/One of Two Channels Inoperable
ML17347A191
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 12/05/1986
From: Mcdonald D
Office of Nuclear Reactor Regulation
To: Woody C
FLORIDA POWER & LIGHT CO.
References
TAC-62072, TAC-62073, NUDOCS 8612100533
Download: ML17347A191 (6)


Text

December 5, 1986 Docket Nos.

50-250 and 50-251 Mr. C. 0.

Woody, Group Vice President Nuclear Energy Department Florida Power and Light Company Post Office Box 14000 Juno Beach, Florida 33408

Dear Mr. Woody:

DISTRIBUTION t~L NRC PDR Local PDR PAD¹2 Rdg T. Novak OGC-Bethesda E. Jordan R. Karsch B. Grimes J. Partlow N. Thompson, DHFT D. McDonald D. Miller ACRS (10)

Gray File

Subject:

Request for Additional Information, Proposed Technical Specifications for the Reactor Vessel Level Monitoring System (RVLMS) - Turkey Point Units 3 and 4

Reference:

TAC Numbers 62072 and 62073 By letter dated July 18, 1986, you proposed technical specifications for the RVLMS which has been installed and tested in the Turkey Point Plant, Units 3 and 4.

The RVLMS is a portion of the Inadequate Core Cooling System for the Turkey Point Plant which was reviewed and approved by the staff.

The details and basis for our approval are documented in the staff's Safety Evaluation (SE) dated January 28, 1985.

Our SE approved implementation of the RVLMS prior to approval of'echnical specifications for the system.

We have completed our, initial review of your proposed technical specifications for the RYLMS.

We have determined that Action Statement 9 is inappropriate.

As presently stated, this Action Statement would allow restart from a scheduled refueling outage with one of the two channels inoperable.

This could result in operation of a complete fuel cycle (18 months) with one failed channel and require the imposition of Action Statement 8 for the entire cycle.

Although operation in this condition is feasible, it is not considered prudent to restart with known defective equipment.

Every effort should be made to restore the equipment to operable.

An emergency or exigency amendment to the technical specifications could be requested if circumstances would not allow restoration of the equipment to an, operable status.

We therefore request that 86121005>3 8g1205 PDR ADOCK 05000250 PDR

e tP

~

I I f

Ifh I

f I

f

'I f

f If

~

~ ~

~

Mr. C. 0.

Woody you consider modifying your submittal such that Action Statement 9 would require restoration of the system (both channels) to operable status prior to restart from the scheduled refueling outage.

If you wish to appeal the staff's position on this issue, please inform me so arrangements can be made for a meeting.

Sincerely, 9, 6 ukl~s ~ 'Prop~ Pgaagc.w P4 ok or Daniel G. McDonald, Senior Project Manager PWR Project Directorate t2 Division of PWR Licensing-A Office of Nuclear Reactor Regulation cc:

See next page L:

DM er 12/

86 P

PADP2 McDonald 12/g/86 D:PAD LRubenstein 12/D /86

0 ap J'

y

"~

J

Mr. C. 0.

Woody Florida Power and Light Companv Turkey Point Plant CC:.

Harold F. Reis, Esquire Newman and Holtzinaer, P.C.

1615 L Street, N.W.

Washington, DC 20036 Mr.

>ack Shreve 0~fice of'he ~ublic Counsel Room 4, Holland Building Tallahassee, Florida 32304 Norman A. Coll, Fsquire

Steel, Hector and Davis 4000 Southeast Financial Center Miami, Florida 33131-2398 Mr. C.

M. Wethy, Vice President Turkey Point Nuclear Plant Florida Power and Light Company P.O.

Box 0?9100 Miami, Florida 33102 Mr. M.

P. Stierheim County Manager of Metropolitan Dade County Miami, Florida 33130 Resident Inspector lJ.S. Nuclear Requlatory Commission Turkey Point Nuclear Generating Station Post Office Box 57-1185 Miami, Flori da 33257-1185 Mr. Allan Schubert, Manager Office of Radiation Control Department o

Health and Rehahilitative Services 1317 Winewood Rlvd.

Tallahassee, Florida 32301 Interaovernmental Coordination and Review Office of Plannina Ic Budqet Executive Office of the Governor The Capitol Puilding Tallahassee, Florida 32301 Administrator Department of Fnvironmenta'.

Requlation Power Plant Siting Section State of ~lorida 26AD Blair Stone Rnad Tallahassee, Florida 32301 Reaional Administrator, Reqion II U.S. Nuclear Reaulatory Commission Suite 2900

.101 Marietta Street Atlanta, Georgia 30323 Martin H. Hodder, Esquire 1131 NE, 86th Street Miami, Florida 33]38

.>oct te Lorion 7~6a SW, 54 Avenue Miami, Florida 33143

~r. Chris il. Raker, Plant Manaqer Turkev >oint Nuclear Plant Florida Power and Light Companv P.D.

Rox 029100 Miami, Florida 3310~

Attorney General Department o~ Legal Affairs The Capitol Tallahassee, Florida 32304

as