ML17347A297
| ML17347A297 | |
| Person / Time | |
|---|---|
| Site: | Turkey Point |
| Issue date: | 02/20/1987 |
| From: | Woody C FLORIDA POWER & LIGHT CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| Shared Package | |
| ML17347A298 | List: |
| References | |
| L-87-81, TAC-62072, TAC-62073, NUDOCS 8703020457 | |
| Download: ML17347A297 (4) | |
Text
REGULATOR INFORNATION DISTRIBUTION TEN (RIDB)
ACCESSION NBR: 8703020457 DOC. DATE: 87/02/20 NOTARIZED:
NQ FACIL:50-250 Turkey Point Planti Unit 3i Florida Power and Ligh+
C 50-251 Turkey Point Plant>
Unit 4i Florida Power and Ligh+
C AUTH. NANE AUTHOR AFFILIATION WOODY> C. O.
Florida Power 5 Light Co.
REC IP. NANE RECIPIENT AFFILIATION Document Control Branch (Document Control Desk )
DOCKET ¹ 05000250 Q5000251
SUBJECT:
Fortoards revised Tech Specs superceding 860718 application For amends to Licenses DPR-31 5 DPR-41 in response to. NRC 861205 request. Proposed amends to App A incorporate plan+-
speciFic Tech Specs For reactor vessel monitoring sos.
DZSTRZDUTZON CODE:
AOOZD COPZES RECEZVED: LTR I ENCL I SZZE:
TITLE:
OR Submittal:
General Distribution NOTES:
RECIPIENT ID CODE/NAKE PWR-A EB PWR-A FOB PMR-A PD2 PD 04 PWR-A PSB INTERNAL: ADN/LFNB
/TBCB Q F 01 COPIES LTTR ENCL 1
1 1
1 5
5 1
1 0
1 1
1 1
REC IPIENT ID CODE/NANE PMR-A EICSB PMR-A PD2 LA NcDQNALDi D PWR-A RSB ELD/HDB4 NRR/ORAS COP IES LTTR ENCL 2
2 1
0 1
1 1
1 0
1 0
EXTERNAL:
EQ8(Q BRUSKEi S NRC PDR 02 1
1 1
LPDR NSIC 03 05 TOTAL NUNBER OF COPIES REQUIRED:
LTTR 22 ENCL 18
F"
'I,
).
)l,)
'I II
'I I I
~ A'll,)
y A '
'I
,l
'II/
I I
y
'I a y,l'I y II," I lt II y) y~
'I 4
y) y I
A
-y fii' yf')II F I y
I I' I
2 ~
'lip
F II
>if".4 y
b II
)
I I
I
)I'y I
I'
" Ii
,,I 11 f)
I ll
~
~
P. O.
14000, JUNO BEACH, FL 33408-0420 gyp)il//g, FEBRUARY 80 1987 L-87-8 I U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555 Gent lemen:
Re:
Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-25 I Proposed License Amendment Reactor Vessel Level Monitoring System NRC TAC Nos. 62072 and 62073 By letter dated July I8, l986 (L-86-296), Florida Power 6 Light Company (FPL) submitted a request to amend Appendix A of Facility Operating Licenses DPR-3 I and DPR-4I to incorporate plant specific technical specifications for the Reactor Vessel Level Monitoring System.
Your letter of December 5, l986 requested that we modify our submittal such that Action Statement 9 (Table 3.5-5) would require restoration of the system (both channels) to operable status prior to restart from the scheduled refueling outage.
We have revised our submittal in accordance with your request.
The attached technical specification pages supersede the same pages included with our July I8, l986 letter.
The conclusions reached, in the Safety and No Significant Hazards Evaluation remain unchanged.
This revision has been reviewed by the Turkey Point Plant Nuclear Safety Committee and the FPL Company Nuclear Review Board.
If there are any questions, please call us.
Very truly yours, C. 0. Wood Group Vi resident Nuclear ergy COW/TCG/gp Attachment cc:
Dr. J. Nelson Grace, Region ll, USNRC Senior Resident Inspector, USNRC, Turkey Point Plant Mr. Lyle Jerrett, Florida Dept. of Health and Rehabilitative Services
)~I 8703020457 870220 PDR ADDCK 05000250 P
PDR an FPL Group company TCG6/023/ I
~al'
~
a Iilawr a ~ I
~
~
~ 'a
~
J 4
a r ~ r *,I
~
) I
~
aw Ia w II I I
r w4l I.
'l c.",wa i ~
~
I a ~
~r
~
w II il Il<
J aa
~, Irar II p'r i
(
a, a
4r ~
I a
JI II,)',
a,rr I)
II
$ k fl, wl
~ 'an',
- aal,
- a. l,,>>
lit W I a
l Iab a
~ Ifd II II II:
II a.
ga a
~
I 'ira
- i w
'I ~,
f Irr
~
l wl'I
"'. I if I II w
w I"
r
- rf w i I Ia I'll a
a G
~
)
I w
II I l II I l: I 2 ll r'~
a I
- r ~
w
,, l. C'f)
I II
~
a wa
~
I
~ If.r ~ -
ar w
r
~
alt
~
w IIII w II wc l(rar a Ia'l
~ a o
rIall Jla)
I' a
,l ~,
a I,
~ ~ ~.) ~ '-
~ r I
~ ra
~
l II" f
Q
~ '
I W Ii
~ ~
ll