Text
rj Docket Nos.
50-254 and 50-265 January ll, 1985 Mr. Dennis L. Farrar Director of Nuclear Licensing Commonwealth Edison Company Post Office Box 767 Chicago, Illinois 60690
Dear Mr. Farrar:
In order to continue our ongoing review of your Inservice Inspection Program for squad Cities Unit 1 and 2, the information as described in the enclosure to this letter is needed.
Please respond within 60 days of receipt of this letter.
The reporting and/or recordkeeping requirements of this letter affect fewer than ten respondents; therefore, OMB clearance is not required under P.L.96-511.
Enclosure:
As stated Sincerely, Original signed by/
Domenic B. Vassallo, Chief Operating Reactors Branch P2 Division of Licensing cc w/enclosure:
See next page Distribution t
oc et e
NRC PDR Local PDR ORBP2 Reading Gray file DEisenhut SNorris RBevan OELD ACRS (10)
EJordan PMcKee JPartlow 8'L:ORB RBev9n 01/I( /
5 DL.
Bk'2:BC DVassallo Ol/il/85
~+ 850i310473 850iii PDR ADOCK 05000254
A lh I
li lh
~hr. Dennis L. Farrar Commonwealth Edison Company Ouad Cities Nuclear Power Station, Units
'. and 2
CC:
I!r. B. C. O'rien President Iowa-Illinois Gas and Electric Company 206 Fast Second Avenue Davenport, Iowa 52801 Robert G. Fitzgibbons, Jr.
Isham, Lincoln 8 Beale Three First National Plaza Suite 5200 Chicago, Illinois 60602 ltlr. Nick Kalivianakis Plant Superintendent Ouad Cities Nuclear Power Station 22710 - 206th Avenue - North Cordova, Illinois 61242 Residen.
Inspector U. S. Nuclear Reou'.atory Commission 22712 206th Avenue North Cordova, Illinois 61242 Chairman Pock Island County Board of Supervisors Rock Island Countv Court House Rock Island, Illinois 61201 James G. Keppler Regional Administrator
- . Region III Office U. S. Nuclear Regulatory Commission 799 Roosevelt Road Glen El lyn, Illinois 60137 Susan N. Sekuler Assistant Attorney General Environmental Control Division 188 M. Randolph Street Suite 2315 Chicago, Illinois 60601 The Honorable Tom Corcoran United States House of Representatives llashington, D.
C.
20515 tlr. Garv N. Mr'.aht Nuclear Facility Safety Illinois Department of Nuclear Safety 1035 Outer Park Drive, 5th Floor Springfield, Illinois 6?704
ENCLOSURE REQUEST FOR ADDITIONAL INFORMATION INSERVICE INSPECTION PROGRAH Quad Cities Station, Units 1 and 2
Some of your requests for relief for the 2nd ISI interval (Ref.2,3) are different from or in addition to requests for relief for the 1st ISI inter-val.(Ref. 1).
Those not attributable to use of different codes are:
1st Interval CR-5 CR-6 None Hone Comparable 2nd Interval CR-3 CR-4 CR-10 CR-11 Subject Inaccessible Welds Piping Penetrations Class 2 Branch Connections SBLC Nozzle (Ref. 3)
In those instances where relief is needed but not requested (2nd interval for first two items, 1st interval for last item) in the references, it should be requested under the terms of sub-paragraph 10 CFR 50.55a(g)(5)(iv) from the requirements of the applicable Code edition.
Please submit such requests or explain why they are not required.
References:
1.
Inservice Inspection and Testing Program, Quad Cities Nuclear Power Station, Units 1 and 2, Commonwealth Edison, Co.,
Rev.
1, June 1, 1982.
2.
Letter, T. J.
Rausch (CECo) to H.
R. Denton (HRC), February 17,
- 1983, transmits 2nd Interval
- Program, dated August 18, 1982.
3.
- Letter, B. Rybak (CECo) to H. R. Denton (NRC), Sept.
7, 1984, RAI response.