Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-250/86-06 & 50-251/86-06.Basis for Denial of Acceptance Criteria Re Spray Pump 4B Will Be Examined During Subsequent Insps
ML17346B216
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 07/01/1986
From: Reyes L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Woody C
FLORIDA POWER & LIGHT CO.
References
NUDOCS 8607290057
Download: ML17346B216 (2)


See also: IR 05000250/1986006

Text

Florid

Power and Light Company

ATTN:

Mr. C. 0.

Woody

'roup

Vice President

Nuclear Energy Department

P. 0.

Box 14000

Juno

Beach,

FL

33408

Gentlemen:

SUBJECT:

REPORT

NOS. 50-250/86-06

AND 50-251/86-06

Thank you for your response

of May 29,

1986, to our Notice of Violation issued

on

April 15,

1986, concerning activities conducted at your Turkey Point facility.

The violation described

in our letter pertained to an apparent failure to provide

adequate

acceptance

criteria for inservice testing of containment

spray

pump

4B

as required

by the

ASME BOILER AND Pressure

Vessel

Code Section

XI paragraph

IWP-3111.

We will examine

the

basis

for your denial

of acceptance

criteria

discrepancies

in a subsequent

inspections.

We appreciate

your cooperation

in this matter.

Sincerely,

i'll

Luis A. Reyes,

Acting Director

Division of Reactor Projects

cc:

.

M. Wethy, Vice President

Turkey Point Nuclear Plant

C. J.

Baker, Plant Manager

J

Turkey Point Nuclear Plant

.

W. Bladow, Plant

gA Superintendent

J. Arias, Jr.,

Regulatory

and Compliance

Supervisor

bcc.

NRC Resident

Inspector

Document Control

Desk

State of Florida

RII

WPKleinsorge: er

06/g9/86

~ 06/ff/86

RIb b6

ARHerdt

06/g3/86

RII

RII

AFGibson

DMVerre1 1 i

06/g +86 f g

06/g/86

RII

GJenkins

06/

/86

8607>+Oo

O()25O

PDR

'ADOC'K 050

6

ri

.i'