Text
Docket Nos.
50-250 and 50-251 March 4, 1985 Mr. J.
W. Williams, Jr., Vice President Nuclear Energy Department Florida Power and Light Company Post Office Box 14000 Juno Beach, Florida 33408 Distribution
" ~1='~
LPDR HThompson EJordan JPartlow CParrish Gray File NRC PDR ORB¹l Rdg OELD BGrimes DMcDonald ACRS 10
Dear Mr. Williams:
Reference:
TAC Nos.
51363 and 51264
SUBJECT:
ENGINEERING EVALUATION OF INSTRUMENTATION SYSTEMS FOR REGULATORY GUIDE 1.97, REV.
3 By letter dated January 26, 1984, you submitted your evaluation report in relation to conformance with Regulatory Guide,(RG) 1.97, Rev.
3.
This submittal was in response to Generic Letter No. 82-33, Supplement 1 to NUREG-0737, dated December 17, 1982.
We are in the process of reviewing your submittal for conformance to R.G.
1.97 and the justifications provided for exceptions from the guidance provided in the R.G.
We are being assisted in our review by Idaho National Engineering Laboratory (INEL).
INEL has developed an interim report identifying the acceptable portions of your submittal including the justifications provided for deviations from R.G.
1.97 and also those unacceptable portions of your submittal.
We have enclosed the interim report for your assessment and request that you respond to the open items within 45 days from receipt of this letter in order to'eet our current review schedule.
We also request that you provide any other comments if the interim report includes any incorrect assumptions or reflects a commitment beyond the intent of your response.
Sincerely,
/'s/SVarga Steven A. Varga, Chief Operating Reactors Branch ¹1 Division of Licensing
Enclosure:
As stated cc w/enclosure:
See next page 8 ¹1'DL R ¹1:DL DMcDonald;ps S
>/$/<<
/
p~~
4039'yp~
85pgg F
ADOCK OS00025 PDR
I
\\
I k
J.
W. Williams, Jr.
Florida Power and Light Company Turkey Point Plants Units 3 and 4
cc:
Harold F. Reis, Equire Newman and Holtzinger, P.C.
1615 L Street, N.W.
Washington, DC 20036 Mr. Jack Shreve Office of the Public Counsel Room 4, Holland Building Tallahassee, Florida 32304 Norman A. Coll, Esquire
- Steel, Hector and Davis 4000 Southeast Financial Center
- Miami, Fl orida 33131-2398 Mr.
Ken N. Harris, Vice President Turkey Point Nuclear Plant Florida Power and Light Company P.O.
Box 029100 Miami, Florida 33102 Mr.
M.
R. Stierheim County Manager of Metropolitan Dade County Miami, Florida 33130 Resident Inspector Turkey Point Nuclear Generating Station U.S. Nuclear Regulatory Commission Post Office Box 57-1185
- Miami, Fl orida 33257-1185 Regional Radiation Representative EPA Region IV 345 Courtland Street, N.W.
- Atlanta, GA 30308 Intergovernmental Coordination and Review Office of Planning 8 Budget Executive Office of the Governor The Capitol Building Tallahassee, Florida 32301 Administrator Department of Environmental Regulation Power Plant Siting Section State of Florida 2600 Blair Stone Road Tallahassee, Florida 32301 James P. O'Reilly Regional Administrator, Region II U.S Nuclear Regulatory Commission Suite 2900 101 Marietta Street
- Atlanta, GA 30303 Martin H. Hodder, Esquire 1131 N.E. 86th Street Miami, Florida 33138 Joette Lorion 7269 SW 54 Avenue Miami, Florida 33143 Mr. Chris J. Baker, Plant Manager Turkey Point Nuclear Plant Florida Power and Light Company P.O.
Box 029100 Miami, Florida 33102 Attorney General Department of Legal Affairs The Capitol Tallahassee, Florida 32304 Mr. Allan Schubert, Manager Public Health Physicist Department of Heal th and Rehabilitative Services 1323 Winewood Blvd.
Tallahassee, Florida 32301