ML17342A440
| ML17342A440 | |
| Person / Time | |
|---|---|
| Site: | Turkey Point |
| Issue date: | 04/03/1986 |
| From: | Mcdonald D Office of Nuclear Reactor Regulation |
| To: | Woody C FLORIDA POWER & LIGHT CO. |
| References | |
| RTR-REGGD-01.097, RTR-REGGD-1.097 TAC-51363, TAC-51364, NUDOCS 8604070537 | |
| Download: ML17342A440 (4) | |
Text
Docket Nos.
50-250 and 50-251 Mr. C. 0.
Woody, Group Vice President Nuclear Energy Department Florida Power and Light Company Post Office Box 14000 Juno
- Beach, Florida 33408
Dear Mr. Woody:
Reference:
TAC Numbers 51363 and 51364 DISTRIBUTION NRC PDR Local PDR PAD¹2 Rdg T. Novak OELD E. Jordan B. Grimes J. Partlow D. McDonald D. Miller ACRS (10)
Tech Branch Gray File J.
Joyce
Subject:
Instrumentation to Follow the Course of an Accident - Conformance to Regulatory Guide 1.97, Rev.
3 By letter dated March 20,
- 1986, we provided the results of our review related to the above subject and concluded that the Turkey Point Plant, Units 3 and 4, design is acceptable with respect to conformance to the guidelines of RG 1.97, Revision 3.
We enclosed our Safety Evaluation and Supporting Technical Evaluation (TER EGG-EA-6814) to the transmittal letter.
It has been brought to our attention that the even numbered pages of the Technical Evaluation were missing as the result of an administrative error.
Enclosed is a corrected copy of the Technical Evaluation (TER EGG-EA-6814) to replace the one originally included in ohr March 20, 1986 letter.
Please accept our apologies for any inconvenience this error may have caused.
Sincerely, ls[
Daniel G. McDonald, Project Manager PWR Project Directorate ¹2 Division of PWR Licensing-A Office of Nuclear Reactor Regulation
Enclosure:
As stated cc w/enclosure:
See next page D
ler 3/)i/86 PM:
2 D
DMcDonald:hc LRu ein 5/ i /86 Q/ t /86 8604070537 860403 FDR ADOCK 05000250(
P
- PDR,
P 1
Mr. C.
O.
Woody Florida Power and Light Company Turkey Point Plant CC:
Harold F. Reis, Esquire Newman and Holtzinger, P.C.
1615 L Street, N.W.
Washington, DC 20036 Mr. Jack Shreve Office of the Public Counsel Room 4, Holland Building Tallahassee, Florida 32304 Norman A. Coll, Esquire
- Steel, Hector and Davis 4000 Southeast Financial Center Miami, Florida 33131-2398 Mr. C.
M. Wethy, Vice President Turkey Point Nuclear Plant Florida Power and Light Company P.O.
Box 029100 Miami, Florida 33102 Mr. M. R. Stierheim County Manager of Metropolitan Dade County Miami, Florida 33130 Resident Inspector U.S. Nuclear Regulatory Commission Turkey Point Nuclear Generating Station Post Office Box 57-1185 Miami, Florida 33257-1185 Mr. Allan Schubert, Manager Public Health Physicist Department of Health and Rehabilitative Services 1323 Winewood Blvd.
Tallahassee, Florida 32301 Intergovernmental Coordination and Review Office of Planning 8 Budget Executive Office of the Governor The Capitol Building Tallahassee, Florida 32301 Administrator Department of Environmental Regulation Power Plant Siting Section State of Florida 2600 Blair Stone Road Tallahassee, Florida 32301 Regional Administrator, Region II U.S. Nuclear Regulatory Commission Suite 2900 101 Marietta Street
- Atlanta, Geor gia 30323 Martin H. Hodder, Fsquire 1131 NE, 86th Street Miami, Florida 33138 Joette Lorion 7269 SW, 54 Avenue Miami, Florida 33143 Mr. Chris J. Baker, Plant Manager Turkey Point Nuclear Plant Florida Power and Light Company P.O.
Box 029100 Miami, Florida 33102 Attorney General Department of Legal Affairs The Capitol Tallahassee, Florida 32304
~'
l
~-
D