Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-250/84-35 & 50-251/84-36
ML17346A865
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 02/19/1985
From: Walker R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Williams J
FLORIDA POWER & LIGHT CO.
Shared Package
ML17346A866 List:
References
NUDOCS 8503040113
Download: ML17346A865 (3)


See also: IR 05000250/1984035

Text

~

~

.a ~(

FEB ia t985

~

~

~

~

~

Florida Power and Light Company

ATTN:

Hr. J.

W. Williams, Jr.

Group Vice President

Nuclear Energy Department

P. 0.

Box 14006

Juno Beach,

FL

33408

Gentlemen:

SUBJECT:

REPORT

NOS. 50-250/84-35

AND 50-251/84-36

~,

'

Thank you for your response

of January

28,

1985, to our Notice of Violation

issued

on December

27,

1984 concerning activities conducted at your Turkey Point

facility.

We have evaluated

your response

and found that it meets the. require-

ments of 10 CFR 2.201.

. We will'xamine the implementation of your corrective

actions during future inspections.

~

'

We appreciate

your cooperation in this matter.',"". ="'.'..",, "'..'.': .'.,

.;..'::::,.;

. '.-.-':".: Sincerely",'

.

, .:::i'..'--,.'g/ GRV/d, Cll

V 628l5li +R

Roger

D. Walker, Acting Director

Division of Reactor Projects

cc:

K. N. Harris, Vice President

Turkey Point Nuclear Plant

C. J. Baker, Plant Hanager.,:,'".'...'.':

.', ...=..'.-:,;:.'..'.

'.;":"-."....'"-'."

Turkey Point Nuclear Plant

K. N. Jones,

Plant gA

Superintendent

bcc:

NRC Resident Inspector

Document Control

Desk

State of Florida

'L

~

JR~I

RII ~

SAEl~od: jc

VLBJownl ee

2 '5/85

2/() /85

@$030

Oc~ 05ppppgp

401i3 850219

.PDR

"

pDR

~'e:

IE Ins ection Re ort 250-84-35

and 251-84-36

Page

3

4)

.

New. surveillance

procedures

.for the Auxiliary Feedwater

System

are being

prepared

by the

Procedure'pgrade

Program.

The

new

procedures

wi 1 1

impl ement

independent

veriff cation

by

a

Restoration

Alignment

Check

List.

The

component

status

is

checked

by

one person

and independently

verifie.d by 'another.

5)

Full compliance for item 3 above will be achieved

by Harch 15,

1985.

FINDING 3:

The facility operating license

requires that'PL shall originate

and maintain

facility operating

records

in

accordance

with

the

requi r ements

of

the

Technical Specifications

(TS).

TS 6.10.l.a requires that records

and logs of facility operation

covering time

interval of each

power level be retained for at least five years.

Contrary to the

above,

the

licensee

failed to retain operating

records.

in

that

a

completed

copy of

a

work sheet

generated

during the

performance of

Operating Procedure

(OP) 1009.1,

"Estimated Critical Conditions", could not be

produced for review.

The work sheet

was completed

on October 31, 1984.

RESPONSE:

I)

  • FPL'oncurs with the finding..

2)

Some worksheets

were not retained if they were generated

during initial

phases

of startups

that

did not

go to completion.

It was incorrectly

assumed

that

gA

Record

Storage

requirements

applied

only to

those

'orksheets

associated

with completed startups;

'I ~

3)

Now the

ECC worksheets

are kept in a binder with the startup

procedures

until all the procedures

are complete.

The

ECC worksheets will then

be .

forwarded to Document Control for gA record retention.

~

~

4)

The

Shi ft Technicians

have

been

instructed

to

ensure

that

completed

startup

procedures,

that

are

equality

Assurance

Records,

are

routed

properly for storage.

5)

Full compliance

was achieved

on September

30,

1984.

0