Forwards Request for Addl Info Re Rev 7 to FPL-NQA-100A Concerning QA Program Description
ML17346A573
Person / Time
Site: Saint Lucie, Turkey Point, 05000000
Issue date: 08/08/1984
From: Robert Lewis
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Williams J
FLORIDA POWER & LIGHT CO.
Shared Package
ML17346A574 List:
References
NUDOCS 8410100684
Download: ML17346A573 (8)


Text

Florida Power and Light Company ATTN:

Mr. J.

W. Williams, Jr.

Group Vice President Nuclear Energy Department P.

0,.

Box 14000 Juno

Beach, FL 33408 Gentlemen:

SUBJECT:

FP8(L TOPICAL QA PROGRAM UPDATE Your letter dated

.June 8,

1984, (L-84-151) transmitted FP5L Topical Quality Assurance Report (FPL-NQA-100A), Revi,sion 7, in. accordance with 10 CFR 50.54(a).

This report provides the current quality assurance, program description for Turkey Point and St.

Lucie (Docket Nos.

50-250, 50-251, 50-335; and 50-389).

We have reviewed'our submittal and determined that additional information is needed to complete our evaluation of changes to the program.

Our request for additional information i's enclosed.

'Please contact Mr. C.

M. Upright of this office on (404) 221-5596 if you have questions regarding our request.

Sincerely,,

(Original signed by RCLewis)

Enclosure:

Request for Additional Information cc w/encl:

K. N. Harris, Vice President Turkey Point Nuclear 'Plant C. J.

Baker, Plant Manager Turkey Point Nuclear Plant C.

M. Wethy, Plant Manager St.

Lucie Nuclear Plant N. Weems, Site QA Superintendent St.

Lucie Nuclear Plant Richard C. Lewis, Director Division of Reactor Projects bcc w/encl:

(See page 2) 841'0100684 840808

PDR ADOCK 05000250

.- PDR

~

)

iiigoo(

II 4

d A

Florida Power and Light.Company bcc w/encl,:

NRC Resident Inspectors

'Document Control 'Desk State of Florida C.

N. Upright,,RII G. A. Bel i sl e, RII J.

Gi 1 ray, IE RI

(

R I RII RI RII' Upright:cdg AFGibson JA

'shinski nce RC

.s 84

~

j84 84-f84 p~ ~e-

~/tZi" Oft<<l1t<<

fjUC 08 1984 ENCLOSURE REQUEST FOR ADDITIONAL CLARIFICATION ON FP8 L QA PROGRAM, REVISION 7 1.

Section TQR 1.0, paragraph 1.22, Quality Assurance Program Review Committee.

This new organization does not appear on the Organization Chart.

The topical report states that this group is administered by the QA System and Audit Group.

This is not reflected in paragraph 1.'2.3.2.a which delineates the responsibilities of the QA System and Audit Group.

Revise Appendix A, Figure 1-1, to show new organization.

2.

Section TQR 1.0, paragraph 1.2.8, Construction Quality Control (Revision 6

Topical Report).

Item "d" within the subparagraph beginning with administrative reporting addresses final approval for dispositions of deviations from program, procedure, specification, or other requirement by the Superintendent Construction Q.C.

This item has been deleted in Revision 7.

Clarify the basis for this deletion or replace these commitments in appropriate sections of the topical report.

3.

Appendix A, Figure 1-1, Revision 7, Organization of Departments Affecting Quality.

The following titles are shown on Appendix A, Figure l-l, 'Revision 7.

a.

Project General Manager b.

Technical Advisor Nuclear Training Paragraph 1.2.4< 4'roject Management Department, of the topical report makes reference to a Project General Manager Nuclear who reports to the Director of Projects.

Similarly, paragraph 1.2.3. 1, Nuclear Operations, makes reference to a Training Supervisor who is accountable for establishing company policy regarding nuclear training.

Clari,fy the differences in titles to ensure consistency between the QA program description and Appendix A, Figure 1-1.

4.

FPEL memorandum dated 7/3/84 from J.

E. Vessely, Director of Quality Assurance, to various individuals indicates that the QA Superintendent of Turkey Point reports to the Director of Quality Assurance.

Paragraph 1.2.3.2.c, Quality Assurance Turkey Point

Group, makes reference to an Assistant Manager of QA who has responsibility for onsite development and implementation of the Quality Assurance Program.

Additionally, the Assistant Manager of QA is shown on Appendix A, Figure l-l, Revision 7, reporting to the Manager of Quality Assurance.

4

, ~

Clarify the difference in titles and reporting requirements of the person assigned responsibility for development and implementation of the QA program at Turkey Point.

5.

The July 3,

1984, memorandum states that the QC Supevvisors at St.

Lucie and Turkey Point will receive quality program direction from the Director of QA.

Paragraph 1.2.3. 1, Nuclear Operations, does not address this interface between the Director of QA and the plant QC Supervisors.

The topical report needs to address this interface.

6.

The above

.memorandum states that the Administrative Coordinator reports to the Manager of QA.

Paragraph 1.2.3.2, Quality Assurance, does not address the reporting requirements nor the responsibilities of the Administrative Coordinators.

Clarify the responsibility and reporting requirements of the Administrative Coordinators.

7.

Appendix C, Revision 6, page 10 of 22 relative to Regulatory Guide

1. 144/ANSI N45.2. 12-1977, the fourth paragraph contains the following statement which has been deleted in Revision 7:

A facility evaluation (audit) will be performed at least every three years and conducted in accordance with Quality Procedures and Quality Instructions for supplier evaluation.

Clarify the deletion or replace this commitment.

8.

Section TQR 8.0, paragraph

8. 1, General Requirements, in the second sentence states that identification of items shall be by heat
number, part
number, serial
number, FPL MRS number, or other suitable means.

Define FPL MRS number.

9.

Appendix C, Revision 7, page 22 of 23 describes an exception to ANSI Standard N45.2. 12-1977, paragraph 4.5.1, involving the following statement:

The audited organization shall provide a follow-up report stating the corrective action taken and the date corrective action was completed.

Justify this deletion relative to the statement that precedes it or replace the commitment.