Notifies of 840402-06 Meeting & Preimplementation Audit at Turkey Point to Discuss Confirmatory Items Identified in Safety Evaluation of Detailed Control Room Design Reviews for Facilities
ML17346A229
Person / Time
Site: Saint Lucie, Turkey Point, 05000000
Issue date: 03/07/1984
From: Varga S
Office of Nuclear Reactor Regulation
To: William J
FLORIDA POWER & LIGHT CO.
References
NUDOCS 8403190150
Download: ML17346A229 (10)


Text

Docket Nos.

50-250/251 and 50-335/389 DISTRIBUTION NRC PDR L PDR ORB¹1 Rdg DEisenhut JLeonard CParrish DMcDonald OELD EJordan

Dear Mr. Williams:

JNGrace Gray File

SUBJECT:

PRE-IMPLEMENTATION AUDIT OF THE DETAILED CONTROL ROOM DESIGN REVIEWS (DCRDRs)

FOR TURKEY POINT AND ST.

LUCIE March 7, 1984 Mr. J.

W. Williams, Jr.

Vice President, Nuclear Energy Department P. 0.

Box 14000 Juno Beach, Florida 33408 We have discussed the details, location and schedule for the meeting with members of your staff.

Enclosed is a proposed agenda for the meeting and pre-implementation audit to be held at the Turkey Point site on April 2 through 6, 1984, for both the St. Lucie and Turkey Point facilities.

Contact Daniel McDonald (301 492-7363),

the Turkey Point Project Manager, for any changes.

The reporting requirements associated with this information collection affect fewer than (10) respondants; therefore, OMB clearance is not required under P.L.96-511.

Sincerely, Qriginal signed bg Steven A. Varga Steven A. Varga, Chief Operating Reactors Branch ¹1 Division of Licensing

Enclosures:

As stated cc: w/enclosures See next page By letter dated February 2, 1984, we provided our draft Safety Evaluation (SE) and Technical Evaluation Report (TER) of your DCRDR's for Turkey Point 3 and 4 and St. Lucie 1 and 2.

We further indicated that a meeting would be necessary to resolve the open or confirmatory items identified in the SE.

ORB¹1: DL DMcDonald;ps 3/7/84 a

g 3/

4 DL

, Sells 3/

/84 C-L J

ler

/84 8403190150 840307 PDR ADOCK 05000250 P...,.

PDR

0

~t I

<P,R REMI Cqp

+

0 Op A

(N P w*w+

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, O. C. 20555 March 7, 1984 Docket Nos.

50-250/251 and 50-335/389

.Mr. J.

W. Williams, Jr.

Vice President, Nuclear Energy Department P.

0.

Box 14000 Juno

Beach, Florida 33408

Dear Mr. Williams:

SUBJECT:

PRE-IMPLEMENTATION AUDIT OF THE DETAILED CONTROL ROOM DESIGN REVIEWS (DCRDRs)

FOR TURKEY POINT AND ST.

LUCIE By letter dated February 2, 1984, we provided our draft Safety Evaluation (SE) and Technical Evaluation Report (TER) of your DCRDR's for Turkey Point 3 and 4 and St..Lucie 1 and 2.

We further indicated that a meeting would be necessary to resolve the open or confirmatory items identified in the SE.

We have discussed the details, location and schedule for the meeting with remembers of your staff.

Enclosed is.a proposed agenda for the meeting and pre-implementation audit to be held at the Turkey Point site on April 2 through 6, 1984, for both the St. Lucie and Turkey Point facilities.

Contact Daniel McDonald (301 492-7363),

the Turkey Point Project Manager, for any changes.

The reporting requirements associated with this information collection affect fewer than (10) respondants; therefore, OMB clearance is not required under P.L.96-511.

Sincerely,

Enclosures:

As stated l

ev n A.

arga, Ch'e Operating Reactors ch 5'1 Division of Licensing cc: w/enclosures See next page'

~

I

J.

W. Williams, Jr.

Florida Power and Light Company Turkey Point Plants Units 3 and 4

cc:

Harold F.'eis, Equire Lowenstein, Newman; Reis and Axelra'd 1025 Connecticut

Avenue, N.W.

Suite 1214 Washington, DC 20036 Bureau of Intergovernmental Relations 660 Apalachee Parkway Tallahassee,.Florida 33130 Norman A. Coll, Esquire

Steel, Hector and'avis 1400 Southeast First National Bank Building Miami, Florida 33131 Mr. Henry Yaeger, Plant Manager Turkey Point, Plant Florida Power and Light Company P.O.

Box 013100 Miami, Fl orida 33101 fir. M.

R. Stierheim County Manager of Metropolitan Dade County Miami, Florida 33130 Resident Inspector Turkey Point Nuclear Generating Station'.S.

Nucl'ear Regulatory Commission Post Office Box 1207 Homestead, Florida 33030 Regional Radiation Representative EPA Region IV

'345 Courtland Street, N.W.

Atlanta, GA 30308 Mr. Jack-Shreve Office of the Public Counsel Room 4, Holland Building Tallahassee, Florida 32304 Administrator Department of Environmental Regulation Power Plant Sfting Section State of Florida 2600 Blair Stone Road Tallahassee, Florida 32301 James P. O'Reilly Regional Administrator, Region II U.S. Nuclear Regulatory Commission 101 Marietta Street, Suite 3100
Atlanta, GA 30303 Martin H. Hodder, Esquire 1131 N. E. 86th Street Miami, Florida 33138 II

Florida Power 8 Light Company CC:

Harold F. Reis, Esquire Lowenstein,

Newman, Reis 8 Alexrad 1025 Connecticut
Avenue, N.W.

Washington, D.

C.

20036 Norman A. Coll, Esquire

'McCarthy, Steel, Hector 8 Davis 14th Floor, First National Bank Building Miami Fl orida 33131 Mr. Jack Schreve Office of the Public Counsel Room 4, Holland Building

'allahassee, Florida 32304 Resident Inspector c/o U.S.N.R.C.

Senior Resident Inspector 7585 S.

Hwy AIA Jensen

Beach, Florida 33457 Administrator Department of Environmental "Regulation Power Plant Siting Section State of Florida 2600 Blair Stone Road Tallahassee, Florida 32301 Mr. Weldon B. Lewis County Administrator

. St. Lucie County

'300 Yirginia Avenue, Room 104 Fort Pierce, Florida 33450 U.S. Environmental Protection Agency

. Region IV Office ATTN:

Regional Radiation

. Representative 345 Courtland Street, N.E.

Atlanta, Georgia 30308 Mr. Charles B. Brinkman Manager - Washington Nuclear Operations C-E Power Systems Combustion Engineering, Inc.

7910 Woodmont Avenue

Bethesda, Maryland 20814 State Planning and Develpment Clearinghouse Office of Planning and Budgeting Executive Office of the Governor The Capi tol Bui lying Tallahassee, Florida 32'301 0

Regional Administrator Nuclear Regulatory Commission, Region II Office of Executive Director for Operations 101 Marietta Street, Suite 2900 Atlanta, Georgia 30303

v'

~

S F o" ida Power and Lioht Pre-Implementation Audit Schedule

,~i. ates:

I Oc ation:

Participants April', ! 984 through April 6, 1984 Turkey Point Plant Daniel HcDonald, NRC Donald Sells, NRC Joel

Vramer, NRC Raymond Ra ir'ez, NRC Daniel.Jones, NRC Joseph
DeBor, SAI Gary Bethke, COMEX St. Lucie 1 and 2 Representatives Turkey Point 3 and 4 Representatives Proposed Agenda:

Yio~m>a A ril 2 A. Yi.

P.N.

Travel to Turkey Point 1'ick-off meeting at Turkey Point 1.

NRC discussion of audit scope, objectives and schedules.

2.

Turkey Point Representative description of DCRDR, process.

Tuesda A ril 3 Review of Turkey Point 3 and 4 task analysis

data, including data col'.ection forms or loss of coolant accident event sequence.

The review should include a wall:-through of selected tasks iri the ac'ual control room.

The emphasis will be on how the information and control require en.s were established and how.hey were used in conjunction with the control room inventory.

'~ednesda April 4

A. Yi.

Review of St. Lucie 1:nd 2 ",EDs left uncorrected or partially corrected.

This review should also include a desk top description o

assE'ssment p1ocedui es ior t}-.e design

',n,provement proorams.

RevIew of iurkey

< o int 3 and 4 findings arid assessment procedu; es for ',"Ds lie.t i ri".: rec'.ed or partially corrected.

This review s,"c u

( d bc cofici)c'..Pd i

i i or '.-y Po int 3 eric

~ control i ooms.

- P.Yi.

Control room>>walk-through o, significant HEDs and design improvements in the Turkey Point 3 and 4 control rooms.

Discussion of FPSL methodology

'sed to verify that the design improvements-would provide the necessary correction.

Discussion of hov'P8L methodology validated that new HEDs were not introduced into the control roomi bv i.he design improvements.

Discussion of design iri.provement implementation schedules.

Discussion of coordination of control room improvement programs including:

SPDS 2.

Reg.

Gu',de I.97 instrumentation 3.

Upgraded emergency operating procedures 4.

Impact of Salem ATMS and other Post THI actions on control room design balll 11 1

A. Yi.

Exit briefing, including:

l.

Overview of significant t<RC findings 2..

NRC reporting schedule 3.

FPLL action/reporting schedule P.N.

Travel from Turkey Point

l

~

~

1'