ML17345A741

From kanterella
Jump to navigation Jump to search
Forwards Insp Repts 50-250/89-17,50-251/89-17,50-335/89-12 & 50-389/89-12 on 890410-12.No Violations or Deviations Noted
ML17345A741
Person / Time
Site: Saint Lucie, Turkey Point, 05000000
Issue date: 05/19/1989
From: Cline W
NRC Office of Inspection & Enforcement (IE Region II)
To: Woody C
Florida Power & Light Co
Shared Package
ML17345A742 List:
References
NUDOCS 8906200194
Download: ML17345A741 (4)


See also: IR 05000250/1989017

Text

gc CELEBRATED

DISTRIBUTION

DEMONSTRATIO.'i

SYSTEM

REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION

NBR

FACIL:50-000

50-250

50-251

50-335

50-389

AUTH.NAME

CLINE,W.E.

RECIP.NAME

WOODY,C.O.

8906200194

DOC.DATE: 89/05/19

NOTARIZED:

NO

Generic

Docket

Turkey Point Plant, Unit 3, Florida Power and.Light

C

Turkey Point Plant, Unit 4, Florida Power

and Light C

St. Lucie Plant, Unit 1, Florida Power

& Light Co.

St. Lucie Plant, Unit 2, Florida Power

a Light Co.

AUTHOR AFFILIATION

Region

2, Ofc of the Director

RECIPIENT AFFILIATION

Florida Power

6 Light Co.

DOCKET

05000000

05000250

05000251

05000335

05000389

SUBJECT:

Forwards

Znsp Repts

50-250/89-17,50-251/89-17,50-335/89-12

&

50-389/89-12

on 890410-12.No violations or deviations

noted.

DISTRIBUTION CODE:

ZE01D

COPIES

RECEIVED:LTR

(

ENCL Q

SIZE:

TITLE: General

(50 Dkt)-Znsp Rept/Notice of Violation Response

NOTES:

RECIPIENT

ZD CODE/NAME

PD2-2

PD

NORRIS,J

iNTERNAL: ACRS

AEOD/DEZIB

DEDRO

NRR/DEST

DZR

NRR/DOEA DjR 11

NRR/DREP/RPB

10

NUDOCS-ABSTRACT

OGC/HDS2

RGN2

.ILE

Ol

COPIES

LTTR ENCL

1

1

1

1

2

2

1

1

1

1

1

1

1

1

2

2

1

1

1

1

1

1

RECIPIENT

ID CODE/NAM"

EDISON,G

AEOD

AEOD/TPAD

NRR SHANKMANrS

NRR/DLPQ/PQEB

NRR/DREP/EPB

10

NRR/PMAS/ILRB12

O~E

ZEBER5@~N..J

6KG~ILE

0~2

COP1ES

LTTR ENCL

1

1

1

1

1

1

1

1

1

1

1

1

1'

1

1

1

1

EXTERNAL: LPDR

NSIC

2

2

1

NRC

PDR

1

1

NCTE Z0 ALL 'RIES" RECZFENZS:

PZZASE HELP US K) REIXKZ RQ3TB!

CGHIRCT~ DXXMEÃi'XWZROLDESK,

RXM Pl-37

(EXT. 20079)

%0 ELXKt:HAXS FLOOR MNE HKH DISTBIHUTICK

LISTS H1R DOCUMENXS YOU DON'T HEED!

TOTAL NUMBER OF COPIES

REQUIRED:

LTTR

26

ENCL

26

MAY 18 tMg

Docket Nos.50-335,

50-389,

and 50-250,

50-251

License

Nos.

DPR-67,

NPF-16,

and

DPR-31

and

41

Florida

Power and Light Company

ATTN:

Hr.

C. 0.

Woody

Acting Senior Vice President - Nuclear

P. 0.

Box 14000

Juno

Beach,

FL

33408-0420

Gentlemen:

SUBJECT:

NRC

INSPECTION

REPORT

NOS. 50-335/89-12,

50-389/89-12,

50-250/89-17

AND 50-251/89-17

This refers

to the Nuclear Regulatory

Commission

(NRC) inspection

conducted

by

W. J.

Tobin on April 10-12,

1989 at your Corporate Offices.

The inspection

included

a review of your Fitness for Duty Program.

At the conclusion of the

inspection,

the

findings

were

discussed

with those

members

of your staff

identified in the enclosed

Inspection

Report.

Areas

examined

during

the inspection

are identified in the report.

Within

these

areas,

the inspection

consisted

of selective

examinations

of procedures

and

representative

records,

interviews with personnel,

and

observation

of

activities in progress.

Within the

scope

of the

inspection,

no violations

or deviations

were

identified.

In accordance

with Section

2.790 of the

NRC's

"Rules. of Practice,"

Part 2,

Title 10,

Code of Federal

Regulations,

a copy of this letter and its enclosure

will be placed in the

NRC Public

Document

Room.

Should you have

any ouestions

concerning this letter,

please

contact

us.

Sincerely,

8906200194

8905i9

PDR

ADOCK 05000250

G

PNU

Wi liam E. Cline, Chief

Nuclear Naterials Safety

and

Safeguards

Branch

Division of Radiation Safety

and Safeguards

Enclosure:

NRC Inspection

Report

cc w/encl:

(See

page

2)

Florida Power and Light Company

MAY 19

1989

cc w/encl:

K. N. Harris, Vice President

St. Lucie Nuclear Plant

G. J. Boissy, Plant Manager

J.

B. Harper,

gA Superintendent

J.

E. Cross,

Plant Manager

Turkey Point Nuclear Plant

L.

W. Bladow, Plant

gA Superintendent

J. Arias, Jr., Regulatory

and Compliance

Supervisor

State of Florida

bcc w/encl:

G.

E. Edison, Project Manager,

Project

Directorate II-2, Division of Reactor

Projects,

NRR

NRC Resident

Inspector

6

RII pi (

WTobin:eh

05/~g/89

D

uire

05/iNi89

RI I

WCline

Crlenjak

05/

/89 ~ 05/ 4/89