L-88-405, Forwards Monthly Operating Repts for Aug 1988 for St Lucie & Turkey Point & Corrected Rept of Unit Shutdown & Power Reduction for Jul 1988 for St Lucie Unit 1.Method of Shutting Down Reactor Incorrectly Coded Manual Scram

From kanterella
(Redirected from ML17345A385)
Jump to navigation Jump to search
Forwards Monthly Operating Repts for Aug 1988 for St Lucie & Turkey Point & Corrected Rept of Unit Shutdown & Power Reduction for Jul 1988 for St Lucie Unit 1.Method of Shutting Down Reactor Incorrectly Coded Manual Scram
ML17345A385
Person / Time
Site: Saint Lucie, Turkey Point, 05000000
Issue date: 09/15/1988
From: Conway W
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
Shared Package
ML17345A386 List:
References
L-88-405, NUDOCS 8809220070
Download: ML17345A385 (3)


Text

ACCELERATED DISTRIBUTION DEMONSTRATION SYSTEM ACCESSION NBR:

FACIL:50-000 50-250 50-251 50-335 50-389 AUTH.NAME CONWAY,W.F.

RECIP.NAME REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS) 8809220070 DOC. DATE: 88/09/15 NOTARIZED: NO Generic Docket Turkey Point Plant, Unit 3, Florida Power and Light C Turkey Point Plant, Unit 4, Florida Power and Light C St. Lucie Plant, Unit 1, Florida Power

& Light Co.

St. Lucie Plant, Unit 2, Florida Power

& Light. Co.

AUTHOR AFFILIATION Florida Power

& Light Co.

RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)

SUBJECT:

Forwards monthly operating repts for Aug 1988 for St Lucie Turkey Point

& corrected rept for Jul 1988 for St Lucie.

DISTRIBUTION CODE:

IE24D COPIES RECEIVED:LTR J ENCL SIZE:

TITLE: Monthly Operating Report (per Tech Spec

)

/Q

",'R

'I D

DOCKET g 05000000 05000250 05000251 05000335 05000389'OTES:

RECIPIENT ID CODE/NAME PD2-2 LA EDISON,G COPIES LTTR ENCL 1

0 1

0 RECIPIENT ID CODE/NAME PD2-2 PD TOURIGNY,E COPIES LTTR ENCL 5

5 1

0 j

A D

INTERNAL: ACRS AEOD/DSP/TPAB NRR/DLPQ/PEB 11 NRR DREP/RPB 10 G

01 EXTERNAL: EG&G WILLIAMS,S NRC PDR 10 10 1

1 1

1 1

1 1

1 1

1 1

1 AEOD/DOA ARM TECH ADV NRR/DOEA/EAB 11 NUDOCS-ABSTRACT RGN2 LPDR NSIC 1

1 2

2 1

1 1

1 1

1 2

2 1

1 iA!

4 Qt TOTAL NUMBER OF COPIES REQUIRED:

LTTR 33 ENCL 30

i+[

il I f I

BOX 14000, JUNO BEACH, FL 33408.0420 SEPTEMBER f 5 )g88 L-88-405 10 CFR 50.36 U. S. Nuclear Regulatory Commission Attn:

Document Control Desk Washington, D.

C.

20555 Gentlemen:

Re:

Turkey Point Units 3 and 4

Docket Nos.

50-250 and 50-251 St. Lucie Units 1 and 2

Docket Nos.

50-335 and 50-389 Monthl 0 eratin Re ort Attached are the August 1988 Operating Status Reports and Summary of Operating Experience Reports for Turkey Point Units 3 and 4 and St. Lucie Units 1 and 2.

Additionally, a

corrected copy of the Unit Shutdown and Power Reduction Report for St.

Lucie Unit 1 for the month of July 1'988 is attached.

The "Method of Shutting Down Reactor" for Item No.

03 on 880701, was incorrectly coded 2

Manual Scram.

The correct code is 9

Other, in that, the reactor remained critical during this evolution.

The previous July 1988 Report for St. Lucie Unit 1 was provided in our letters L-88-351, dated August 15,

1988, and L-88-362, dated August 22, 1988.

Should there be any questions please contact us.

Very truly yours,

~ W.

F onway Sen'or Vice President Nuclear WFC/DMB/dmb Attachments cc:

Dr. J. Nelson Grace, Regional Administrator, Region II, USNRC Senior Resident Inspector, USNRC, Turkey Point Plant Senior Resident Inspector, USNRC, St. Lucie Plant

~80' R

ADOC< 8~OS gg PD 220070 080002g0 POC an FPL Group company