L-88-405, Forwards Monthly Operating Repts for Aug 1988 for St Lucie & Turkey Point & Corrected Rept of Unit Shutdown & Power Reduction for Jul 1988 for St Lucie Unit 1.Method of Shutting Down Reactor Incorrectly Coded Manual Scram

From kanterella
(Redirected from L-88-405)
Jump to navigation Jump to search
Forwards Monthly Operating Repts for Aug 1988 for St Lucie & Turkey Point & Corrected Rept of Unit Shutdown & Power Reduction for Jul 1988 for St Lucie Unit 1.Method of Shutting Down Reactor Incorrectly Coded Manual Scram
ML17345A385
Person / Time
Site: Saint Lucie, Turkey Point, 05000000
Issue date: 09/15/1988
From: Conway W
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
Shared Package
ML17345A386 List:
References
L-88-405, NUDOCS 8809220070
Download: ML17345A385 (3)


Text

ACCELERATED DISTRIBUTION DEMONSTRATION SYSTEM ACCESSION NBR:

FACIL:50-000 50-250 50-251 50-335 50-389 AUTH.NAME CONWAY,W.F.

RECIP.NAME REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS) 8809220070 DOC. DATE: 88/09/15 NOTARIZED: NO Generic Docket Turkey Point Plant, Unit 3, Florida Power and Light C Turkey Point Plant, Unit 4, Florida Power and Light C St. Lucie Plant, Unit 1, Florida Power

& Light Co.

St. Lucie Plant, Unit 2, Florida Power

& Light. Co.

AUTHOR AFFILIATION Florida Power

& Light Co.

RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)

SUBJECT:

Forwards monthly operating repts for Aug 1988 for St Lucie Turkey Point

& corrected rept for Jul 1988 for St Lucie.

DISTRIBUTION CODE:

IE24D COPIES RECEIVED:LTR J ENCL SIZE:

TITLE: Monthly Operating Report (per Tech Spec

)

/Q

",'R

'I D

DOCKET g 05000000 05000250 05000251 05000335 05000389'OTES:

RECIPIENT ID CODE/NAME PD2-2 LA EDISON,G COPIES LTTR ENCL 1

0 1

0 RECIPIENT ID CODE/NAME PD2-2 PD TOURIGNY,E COPIES LTTR ENCL 5

5 1

0 j

A D

INTERNAL: ACRS AEOD/DSP/TPAB NRR/DLPQ/PEB 11 NRR DREP/RPB 10 G

01 EXTERNAL: EG&G WILLIAMS,S NRC PDR 10 10 1

1 1

1 1

1 1

1 1

1 1

1 AEOD/DOA ARM TECH ADV NRR/DOEA/EAB 11 NUDOCS-ABSTRACT RGN2 LPDR NSIC 1

1 2

2 1

1 1

1 1

1 2

2 1

1 iA!

4 Qt TOTAL NUMBER OF COPIES REQUIRED:

LTTR 33 ENCL 30

i+[

il I f I

BOX 14000, JUNO BEACH, FL 33408.0420 SEPTEMBER f 5 )g88 L-88-405 10 CFR 50.36 U. S. Nuclear Regulatory Commission Attn:

Document Control Desk Washington, D.

C.

20555 Gentlemen:

Re:

Turkey Point Units 3 and 4

Docket Nos.

50-250 and 50-251 St. Lucie Units 1 and 2

Docket Nos.

50-335 and 50-389 Monthl 0 eratin Re ort Attached are the August 1988 Operating Status Reports and Summary of Operating Experience Reports for Turkey Point Units 3 and 4 and St. Lucie Units 1 and 2.

Additionally, a

corrected copy of the Unit Shutdown and Power Reduction Report for St.

Lucie Unit 1 for the month of July 1'988 is attached.

The "Method of Shutting Down Reactor" for Item No.

03 on 880701, was incorrectly coded 2

Manual Scram.

The correct code is 9

Other, in that, the reactor remained critical during this evolution.

The previous July 1988 Report for St. Lucie Unit 1 was provided in our letters L-88-351, dated August 15,

1988, and L-88-362, dated August 22, 1988.

Should there be any questions please contact us.

Very truly yours,

~ W.

F onway Sen'or Vice President Nuclear WFC/DMB/dmb Attachments cc:

Dr. J. Nelson Grace, Regional Administrator, Region II, USNRC Senior Resident Inspector, USNRC, Turkey Point Plant Senior Resident Inspector, USNRC, St. Lucie Plant

~80' R

ADOC< 8~OS gg PD 220070 080002g0 POC an FPL Group company