ML17345A388

From kanterella
Jump to navigation Jump to search
Corrected Page to Jul 1988 Monthly Operating Rept for St Lucie Unit 1
ML17345A388
Person / Time
Site: Saint Lucie, Turkey Point, 05000000
Issue date: 07/31/1988
From: Bonett D
FLORIDA POWER & LIGHT CO.
To:
Shared Package
ML17345A386 List:
References
NUDOCS 8809220073
Download: ML17345A388 (2)


Text

i XUCO U00 ZO v9 M

RM UO OO nv R(a)

CORRECTED COPY UNIT SHUTDOWNS Ak POWER REDUCTIONS July,. 1988 I

DOCKET No.

UNlTNAME St.

Lucie Unit 1

~,

pATE Se tember 15 1988 COMPLETED BY D.. H. Bonett O00 VIM OO 04

QPw, Dh)01 neO Date 02 880630 03 880701 04 880711 Type'uration (Hours) 3.-9 3.7 503.8 Method of Shutting Down Reactor Ucen see Event Repat>>

System Code~

Component Code'H VALVEX RC FUELXX 335/88-04 HH RELAY Causes Corrective Actionto Prevent Recurrence Unit fl was operating at.lOOX power when the reactor tripped on high-pressurizer pressure.

The trip was caused by a spurious actuation of the current balance relay associated with the 18 condensate pump.

The relay was replaced; Return to power operation then comnenced.

Unit tl reached approximately 15K power when it was manually shutdown to repair a leaking safety relief valve in the feedwater filter system.

Follow'ing repairs the unit was returned to full power operation.

Unit $ 1 was shutdow'n for refueling and scheduled maintenance.

F Forced S Scheduled Reason A-Equipnwfnt Faikrre(Exphin) 8 - MaIntenance orTest C - RefueIng 0- Reguhtory Restiiction E - Operator Training 8 Ucense Examination F - Adrrdnistrative G - OperationalError(Exphln)

H-Other(BqNn) 3 Method 1 - Manual 2-. Manual Scram 3 - Automatic Scram 4 - Continued 5-Load Reduction

. 9-Other(Exphin)

ExhibitG-Instructions forpreparation ofGita Entry Scheets Ucensee Event Report(LER) Re (NUREG4161)

Exhibit 1-Same Source

4l C

f