Monthly Operating Repts for Aug 1988 for St Lucie & Turkey Point
ML17345A387
Person / Time
Site: Saint Lucie, Turkey Point, 05000000
Issue date: 08/31/1988
From: Bonett D
FLORIDA POWER & LIGHT CO.
To:
Shared Package
ML17345A386 List:
References
NUDOCS 8809220071
Download: ML17345A387 (31)


Text

ERAGE DAILY DIIIT POMER LEVEL 00CKET

. NO.

UNIT 50-250 Turkey Point S3 pATE Se tember 15.

1988 CONPLETED BY D. H. 'Bonett TELEPHONE 407 694-4432 NNTH Au ust.

1988 OAY AVElN6E DAILY PSKR LEVEL (s se-sac) 8/ 1/88 8/ 2/88 8/ 3/88 8/ 0/88 8/ 5/88 8/ 6/88 8/ 7/88 8/ 8/88 8/ 9/88

. 8/18/88 8/11/88 8/12/88 8/13/88.

8/14/88 8/15/88 8/16/88 8/17/88 8/18/88 8/19/SS 8/20/88'/21/SS 8/22/88 8/23'/88 8/24/88 8/25/88 8/26/88 8/27/SS 8/28/88 8/29/88 8/30/88 8/31/88 683 675 672 668 666 665 666 667 665 666 674 675 672 673 675 679 671 670 670 677 670 668 66'8 666 625

'98 504 659 661 658 659 S809220071 SS0915 PDR ADOCK 05000250 R

PDC

if,

OPERATING STATUS OF'ERATXNG DA1'A REF'ORT DOCKET NO 50 250 DATE n) g 8/88 COMPLETED BY Do Mo BOHETT TEI EFHOHE 3O"-r694Z4432 1,

UNIT NAME; TURKEY POINT UNIT 3 2.

REPORTXHG PLRXOD:

AUGUST 1988 3

LICENSED TH'ERMAL POHER

( MHT >

2200 4,

HAMEF'LATE RATXNG <GROSS MME):

760 5+

DESIGN ELECTRXCAL R*TIHG (HET MHE) 693 hi MAXIMUM DEF'ENDABLE CAPACXl'Y (GROSS MHE):

679 7+

MAXIMUM DEPEHDABLE CAF'ACITY (NET MRE) i 666 8

XF'HANGES OCCUR IH CAF'ACXTY RATXNGS (X1'EMS NUMBER 3 THROUGI.I 7 >

SIHCE LAST REPORT x GXVE REASOHS+

POWER LEVEL TO WHICH RESTRICTED'F AHY (HET MHE) 1().

REASONS FOR RESTRICTIONS~

XF ANY+

MONTHLY

-YTD-CUMULATXVE

'iii I-IOURS IN REF'ORT F'ERIODo 12+

HUMBER OF I-IOURS REACTOR k'AS CRXTICAL 13.

RI:.ACTOR RESERVE SHUTDOWN HOURS 14.

HOURS GENERATOR QN-LINE 15+

UNIT RESERVE SHUTDOWN HOURS ih ~

GROSS THERMAL FNERGY GENERATED (MHH) 17'ROSS ELECTRICAL ENERGY GENERATED (MHH) 18i HET ELECTRICAL ENERGY GENERATED

<MHH>

19+

UNIT SERVTCE FACTOR 20.

UHXT, AVAILABILITY FACTOR'1 CAPACITY I. AC1'OR

< USING MDC NET )

22 i CAF'ACXTY FACTOR

( USING DER HET )

23, UHXT FORCED OUTAGE RA1'E 24 SISUTDOk'NS SCI.IEDULED OVER NEXT 6 MOHTHS

.744 744<0 0+0 744.0 0

1621379 15575 491116 108+0 100+0

')'V. 1 9%It 3 e

58(J5 466hi4 e,e 4580i9 0

9768090 3'150945 2983568 78th.

78' 76.5 73 t 5 21 i8 137984i6 92642oi 844i4 91416

~ 1 121.8 1895723 3

60748)'46 57462354 66i3 66+3 63i5'0+1 iiie 25.

XF SHUT DOHN AT EHD OF REF'OR1 F'ERIOD, ESTXMATED DATE OF STARTUP;

i+i il I

UNIT SHUTDOWNS AND POWER REDUCTIONS REPORT MONTH DOCKET NO.

50-250 UNlTNAME Turkey Point. Unit 3 COMPLETEDBy D.

M. Bonett 6

08 Date 880827 Type'uration (Hours) 0.0 Reason2 B'ethod of Shutting Down Reactor Ucensee Event Report¹ System Component Code~

Codes HA VALVOP Cause 8 Corrective Actionto PreventRecurrence Unit 83 was reduced to approximately 55% power to perform turbine valve testing.

F Forced S Scheduled Reason A-Equipment Failure(Explain)

B - Maintenance orTest C - Refueling D - Regulatory Restriction E - Operator Training &Ucense Examination F - Administrative G - Operational Error (Explain)

H - Other (Explain)

Method 1 - Manual 2-Manual Scram 3 - Automatic Scram 4-Continued 5-LoadReduction 9 - Other(Exphin)

ExhibitG-Instructions forPreparation ofData Entry Scheets Ucensee Event Report(LER) File (NUREG4161)

Exhibit1-Same Source 001587

i+i

DOCKET NO.

UNIT DATE 50-2 COMPLETED BY TELEPHONE D.

7 6

REPORT MONTH Au vst 1988 See the "Unit Shutdowns and Power Reduction Report".

i+[

0

RAGE DAILY UNIT PQMER LEVEL DOCKET NO.

UNIT DATE CQ{PLETED BY TELEPHONE 50-251 Turkey Point II4 September 15, 1988 D. H..Bonett 407 694-4432'NTH Au ust 1988 DAY AVERNIE DAILY POMER LfVEL

{IIMcHlet) 8/ 1/88 8/ 2/88 8/ 3/88 8/ 4/88 8/ 5/SS 8/ 6/88 8/ 7/88 8/ 8/88 9/88 8/ie/88 8/11/SS 8/12/88 8/13/88 8/14/88 8/15/88 8/16/88 8/17/88'/18/88 8/19/88 8/28/88

'8/21/88 8/22/88 8/23/88 8/24/88 8/25/88 8/26/88 8/27/88 8/28/88 8/29/88 8/38/88 8/31/88 319 639 673 672 670 667 669 669 620 611 676 632 22

-Zi

,21

-23 411 673 594

-23

-23'37 543 668 666 664 669 670 671 667 669

OPERATING STATUS OPERATING DATA REPORT DOCKET NQ 50 25:l.

DATE 9/ 8/88 COMPLETED BY D.

M.

BONETT TEL'EPHQNE 305/694/4432 1

UNIT NAME: TURKEY POINT UNIT 2 i REPORTING PERIOD:

AUGUST 1988 3,

LICENSED THEf."MAL POWER

<MWT>:

2200 NAMEPLATE RATTNG (GROSS MWE)l 760 5+

DESXGN ELECTRICAL RATXNG (NET MWE):

693 6.

MAXIMUM DEPENDABLE CAPACITY (GROSS MWE):

699 7'AXIMUM'EPEND*E:LEC*PACITY

< NET MWE):

666 8i XF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7)

- SINCE LAST REPORT ~

GIVE REASONS:

POWER LEVEL TO WHICH RESTRICTED r XF ANY

< NET MWE) 10 REASONS FQI'ESTRICTIONS IF ANY'ONTl.ll Y

YTD-CUMULATTVE 11, HOURS IN REPORT PERIOD; 12'UMBER OF HOURS REACTOR WAS CRXTXCAL 13.

RI=ACTOR RESERVE SHUTDOWN HOURS 14 o HOURS GENERATOR ON-LINE 15.

UNIT RESERVE SHUTDOWN HOURS 16 ~

GROSS TI-lERMAL FNERGY GENER*TED

( MWll )

17+

GROSS ELECTRICAL ENERGY GENERATED (MWH>

18.

NET ELECTRICAL ENERGY GENERATED (MWI.I>

19 UNIT SERVICE FACTOR 20'NIT AVAILABILITYFACTOR 21+

CAP*CITY FACTOR (USING MDC NFT) 2.

CAPACITY FACTOR

<USING DER NET>

23)

UNIT FORCED OUTAGE RATE 24+

Sl.lUTDOWNS SCHEDULED OVER NEXT 6 MONTHS REFUELING. 9/17/88~

105 DAYS 744 604' OoO 596+8 1235581'89278 366688 80.2 ee 2

74oO 71 t 1 7i9 58v5 4593.9 0.0 4532iO 0

9634436 3147388 2982861 77.4 77.4 76+5 73s5 l 113 131716+ 0 89780+3 166i6 86738ii 32+1 183140659 58447152 55301643 65i9 65.

9'4+4 60t6 25.

XF SHUT DOWN AT END OF REPORT PERIOD ESTIMATED DATE OF BTARTUPl

ig>

i~

UNIT SHUTDOWNS AND POWER REDUCTIONS Page 1 of 2 REPORT MONTH Au ust 1988 DOCKETNO.

50-251 UNlT NAME Tur key Point Unit 4 DATE Se tern r

COMPLETED By D.

M. Bonett TELEPHONE 407 694-4432 Date 10 880812 09 880730 Type'uration (Hours) 0.0 96.2 Reason2 B

Method of Shutting Down Reactor Ucensee Event Report¹ LERR51-88-6 System Code4 HA CB Component Codes VALVOP VALVEX Cause &Corrective Actionto PreventRecurrence Unit 84 was reduced to approximately 50% power to perform turbine valve testing.

While the unit was at reduced

power, a leak in the 4A condenser waterbox was repaired, and the unit returned to full power operation.

The unit was shutdown due to reactor coolant leakage caused by a leaking flange on an unisolable pressurizer spray line.

The leak was repaired.

The unit remained shutdown for an additional period to investigate and repair a leak found on the spent fuel pool cooling pump and associated vent valve.

The unit was then returned to full power operation following a hold at 30%

ower for secondar side chemistr F Forced S Scheduled Reason A-Equipment Failure (Explain)

B - Maintenance orTest C - Refueling D - Regulatory Restriction E - Operator Training &Ucense Examination F - Administrative G - Operational Error (Explain)

H - Other (Explain) 3 Method 1 - Manual 2 - Manual Scram 3 - Automatic Scram 4 - Continued 5 - Load Reduction 9 - Other (Explain)

ExhibitG-instructions forPreparation ofData EntryScheetsUcensee Event Report(LER) File (NUREG4161)

Exhibit1-Same Source

ii Il

UNIT SHUTDOWNS AND POWER REDUCTIONS Page 2 of 2 REPORT MONTH,

. Au ust 1988 DOCKET NO.

50-.251 UNIT NAME Turke Point Unit 4 DATE Se tember 15 8

COMPLETED BY

~.

Date Type'uration (Hours)

Reason~

Method of Shutting Down Reactor Ucensee Event Reporti'ystem Code 4 Component Codes Cause &Corrective Actionto Prevent Recurrence 11

'80819 F

51.0 LER 250-88-9 IA RELAYX Unit 4 was automatically tripped du to an actuation of the B steam generator low-low level reactor tri circuitry.

An investigation into the cause of the" actuation was conducted.

While the unit was shut down a leak in an oil plug in the turbine control side of the A

turbine stop valve was discovered.

This leak was repaired and the unit returned to full power operation following several holds for secondary side chemistry, turbine control 'valve testing, B main feedwater pump maintenance, and rod position indication adjustments.

F Forced S Scheduled Reason A-Equipment Felure(Exphin)

B - Maintenance orTest C - Refueling D - Regulatory Restriction E - Operator Training &Ucense Examination F - Administrative G - Operational Error (Explain)

H - Other (Explain)

Method 1 - Manual 2-Manual Scram 3 - Automatic Scram 4 - Continued 5 - Load Reduction 9 - Other(Explain) 4 ExhibitG-instructions forPreparation ofData Entry Scheets Ucensee Event Report(LER) File (NUREG4161) 5 Exhibit1-Same Source

II igi

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO.

UNIT DATE COMPLETED BY TELEPHONE 50-251 Turke Point Unit 4 Se tember 15 1988 D. H. Bonett 407 694-4432

.REPORT MONTH Au ust 1988 See the "Unit Shutdowns and'ower Reduction Report".

II I+i iI C

't

VERAGE DAILY UNIT POMER LEVE DOCKET NO.

UNIT'ATE CONPLETED BY TELEPHONE 50-335 St. Lucie 01 September 15, 1988 D. N. Bonett aO7 694-4432 NWTH

August, 19BS DAY AVERAGE DAILY PSKR LEVEL (N QMIet) 8/ 1/SS 8/ 2/SS 8/ 3/88 8/ 4/88 8/ 5/SS 8/ 6/88 8/ 7/88 8/ 8/88 8/ 9/88 8/10/88 8/11/88 8/12/88 8/13/88 8/14/S8 8/15/88 8/16/88 8/17/88 8/18/88 8/19/88 8/20/88 8/21/88 8/22/SS 8/23/88 8/24/88 8/25/88 8/26/88 8/27/88 8/28/S8 8/29/88 8/30/88 8/31/88 2

2

'7 2

2 2

2-3

-3

-3

-3

-3

-2

-3

-3

-3

-6 3

-14 5

-17

~I (Ii dl d

OPERATIHG STATU, OF'ERATING DA1'A REF'ORT OOCl;ET HO 50 33i~d DATE 0'r 8/88 COMF'LETED BY DE M,

BOHETT TELEF'HONE:

305/694/4032 1+

UHXT HAt'lF 3 ST ~

LUCXE UHTT 1

2.

REPOR'l'XNG PERIOD+

AUGUST 1988 3.

LICEHSED THERMAL POWER (MHT) +

2700 NAMEF'LATE RATXNG'(GROSS MME):

850 5+

DESIGN ELECTRICAL RATING (HET MHE)'i 830 6i MAXXMUM DEF'ENDABLE CAPACITY (GROSS MWE:) l 872 7.

MAXXMUM DEPEHDABLE CAF'ACITY (NET MHE):

839 8, IF CHAHGES OCCUR IN CAF'ACTTY RATINGS (I1EMS NUMBER 3 Tl-IROUGH 7)

SIHCF 'LAST REF'ORT r GIVE REASONS+

POWER LEVEL TQ WHICH RESTRICTED r IF ANY (NET MHE) ie, REhSONS FOR RESTRICTIONS XF ANY; MONTHLY

-YTD-CUMULATIVE HOUliS IN REF'ORT F'ERXODo 12 i NUMBER OF HOURS REACTOR HAS CRI, ICAL.

13.

REAC1'OR RESEr.VE SHUTDOWN HOur' 14+

HOURS GENERATOR OH "LINE 15.

UNIT RESERVE SHUTDOWN HOURS 16'ROSS THERMAL EHERGY GENERATED (MHH) 17+

GROSS ELECTRICAL ENERGY GENERATED

'< MHH) 18+

NET FLECTRICAL EHERGY GENERATED (MHH) 19 i UHIT SERVTCE FACTOR 20.

UHIT hVhILhBXLITY FACTOR 21+

CAF'ACI1'Y FAC'l'OR

< USING 'MDC NET )

22, CAF'ACITY FACTOR (USXHG DER NET) 23, UNIT Far.CFD OUTAGE RATE 24.

SHUTDOWNS SCl-IEDULED OVER NEXT 6 MONTHS 706 69+8 O.e Qoi 0

2511 600

-5647 0.6 Oib OoO 0+0 58&5 4638.1 eiO 0558o6 0

0()85579 3870145 9

77o9 78.8 79+6 102527ie 76182.0 205.3 75528 F 4 39i3 193570627 6360'z155 6007131 73 4 7 7'

73.1 71+8 3 '

-, Ir'HUT DowN Ar END OF REFOR1

PERIOD, ESTIMAlED DATE QF STARTUP".

8/31/88

4k i+i

UNIT SHUTDOWNS AND POWER REDUCTIONS REPORT MONTH Au ust 1988 DOCKET NO.

UNiT NAMF St.

Luci e Unit 1

DATE Se tember 15, 1988 COMPLETEDBY D..H. Bonett TELEPHONE Date Type'uration (Kours)

Reason~

Method of Shutting Down Reactor Ucensee Event Report¹ System Component Code 4 Code 5 Cause 8 Corrective Actionto PreventRecurrence 04 880711 S

739. 9 RC FUELXX Unit imil Remained Shutdown For Refueling and Scheduled Haintenance.

F Forced S Scheduled Reason A-Equipment Failure(Explain)

B - Maintenance orTest C - Refueling D - Regulatory Restriction E - Operator Training &Ucense Examination F - Administrative G - Operational Error (Explain)

H - Other (Explain) 3 Method 1 - Manual 2 - Manual Scram 3 - Automatic Scram 4 - Continued 5 - Load Reduction 9 - Other (Explain)

ExhibitG-Instructions forPreparation ofData Entry Scheets Ucensee Event Report (LER)File (NUREG4161)

Exhibit1-Same Source 091587

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO.

UNIT DATE'OMPLETED BY'ELEPHONE 50-335 St. Lucie Unit 1 September I5, 1988 D. H. Bonett (407) 694-4432 REPORT MONTH Au ust, 1988 Unit.l remained shutdown for refue1ing and schedu1ed maintenance.

In accordance with requirements of Technica1 Specification 6.9.1.6, there were no cha11enges to PORV or safety va1ves durina the report month.

i+i I,

VERAGE DAILY UNIT POMER LEVEL POCKET NO.

UNIT DATE CONPLETED BY TELEPHONE 50-389 St. Lucie f2 September 15.

1988 D. N. Bonett 32 NNTH Au ust 19 DAY AVERAGE DAILY POMER LEVEL (N Qt-Net) 8/ 1/88 S/ 2/88 8/ 3/88 8/ 4/88 8/ 5/88 8/ 6/88 8/ 7/88 8/ 8/88 8/ 9/88 8/10/88 8/11/88 8/1'2/88 S/13/SS 8/14/88 8/15/88 8/16/88 S/17/88 8/18/88 8/19/88 8/20/88 8/21/88 8/22/88 8/23/88 8/24/88 8/25/88 8/26/88 8/27/88 8/28/88 8/29/88 8/30/88 8/31/88 841 847 847 839 836 837 842 844 840 814 784 822 847 846 847 848 827 824 848 852 852 834 824 849 850 850 849 849 846 845 845

igi f'

I

OPERATING STATUS OF'ERATXHG DATA REF'ORT OOCI(ET Na 50 389 DATE 9/ 8/88 COMPLETED BY Do Mo BQNETT TELEF'HONE 305/694/4432 1 o UNIT NAME o ST. + LUCIE UNIT 2 2

'REPORTING PERIOD:

AUGUST 1988 3+

LICENSED THERMAL POWDER (NWT) +

2780 NANEF'LATE RATING (GROSS 'NHE)+

850 5,

DFSIGN ELECTRXCAL R*TXHG

< NET NHE):,

830 6+

MAXIMUM DEPENDABI E CAPACITY (GROSS MME) i 882 7,

MAXIMUM DEPENDABLE CAPACITY'(NET MHE>:

839 8+

XF CHANGES QCCUR.IN CAPACIT'Y RATINGS (ITEMS NUMBER 3 THROUGH 7)

SINCE LAST REPORT r GXUE REASONS

'+

POWER LEVEL TO WHICH RESTRICTED~ IF *HY (HET NHE) 10',

REASONS FQR RESTRICTXQHS XF *NY:

MONTHI Y

-YTD-CUMULATIVE 11 I-IQUI'S XN REF'QRlERXOD

'2 NUMBER OF HOURS REACTOR HAS CRITICAL 13'EAC1'QR RESERVE SHUTDOHH HOURS 14+

HOURS GENERATOR -ON-LXNE 15'NIT RESERVE SHUTDOWN HOURS 16.

GROSS THERMAL EHERGY GENERATED (NHH) 17.

GROSS ELECTRTCAL ENERGY GENERATED (NHH) 18.

HET ELECTRXCAL ENERGY GENERATED (MHH) 19.

UHXT SLRVXCE FACTOR 28 t UHTT AVAXLAPrILITYFACTOR 21 CAPACITY FACTOR (USXHG MDC NET) 22.

CAPACITY FACTOR

<USING DER HET) 23'HXT FORCED OUTAGE RATE 24'HUTDOWNS SCHEDULED OVER 'HEXT 6 MONTHS REFUELXHGz 2/4/891 83 DAYS 744 744+8 0.0 744o8 0

1996547 658680 624614 188i8 188i8 188+1 181 '

5855 585-0 8o8 5855i8 8

15725549 5250540 4'983365 18<> ~ 0 188i8 181.4 182+5 8

44424.0 38613+8 0.0 37892+6 98722189 32939200 31151.153 85 '

85+3 85+8 85+6 ho3 XF SHUT DOWN AT END QF REPORT F'ERXOD ESTXNATED DATE OF'TARTUP;

igi

UNIT SHUTDOWNS AND POWER REDUCTIONS REPORT MONTH Au ust 1988 DOCKET NO.

UNITNAME St.

Lucie Unit 2, DATE Se tember 15, 1988 COMPLETED BY TELEPHONE 407 694-4432 Date Typei Duration (Hours)

Reason~

Method of Shutting Down Reactor Licensee Event Reports System Code4 Component Codes Cause 8 Corrective Actionto Prevent Recurrence Unit ¹2 had no shutdowns or significant power reductions.

F Forced S Scheduled Reason A - Equipment Failure (Exphin)

B - Maintenance orTest C - Refueling D - Regulatory Restriction E - Operator Training &Ucense Examination F - Administrative G - Operational Error (Explain)

H - Other (Explain)

Method 1 - Manual 2-Manual Scram 3 - Automatic Scram 4-Continued 5-Load Reduction 9-Other(Exphin)

ExhibitG-Instructions forPreparation ofData EntryScheets Ucensee Event Report (LER)File (NUBEG4161)

Exhibit1-Same Source 091587

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO.

UNIT.

DATE COMPLETED-BY TELEPHONE 50-389 St. Lucie Unit 2 Se tember 15 1988 D. l1. Bonett (407) 694-4432 REPORT MONTH

August, 1988 Unit 2 operated at essentially full power and had no "Unit Shutdowns or significant power reductions".

In accordance with requirements of Technical Specification 6.9.1.6, there were no challenges to PORV or safety valves during the report month.