REGULA Y INFORMATION DISTRIBUTIQh YSTEM (RIDS)
ACCESSION NBR: 8802180092 DOC. DATE: 88/02/12 NOTARIZED:
NO FACIL: 50-250 Turkey Point Plant>
Unit 3i Florida Poeer and Light C 50 251 Tur keg Point Planti Unit 4i Florida Power and Light C
AUTH. NAME AUTHOR AFFILIATION LJOODYI C. O.
Florida Poeer h Light Co.
RECIP. NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)
SUBJECT:
Foreards integrated schedule
( I/S) summary report for Dec 1987'eflecting info as of 871215. Complete I/8 rept will be issued May 1988.
DISTRIBUTION CODE:
A001D COPIES RECEIVED: LTR'NCL SIZE:
TITLE:
OR Submittal:
General Distribution DOCKET 0 05000250 05000251 NOTES:
REC IP IENT ID CODE/NAME PD2-2 LA EDISON~ G COPIES LTTR ENCL 1
0 1
RECIPIENT ID CODE/NAME PD2-2 PD COPIES LTTR ENCL 5
5 INTERNAL: ARM/DAF/LFMB NRR/DEST/CEBSH7 NRR/DEST/RSB NRR/
S/ILRB REG F E
01 EXTERNAL:
LPDR NSIC NRR/DEBT/*DS7E4 NRR/DEST/MTB NRR/DOEA/TSB OGC 15-B-18 RES/DE/EI 8 NRC PDR 1
1 1
1 1
0 1
1 TOTAL NUMBER OF CQP IES REQUIRED:
LTTR 20 ENCL 17
I
P. O.
14000, JUNO BEACH, FL 33408.0420 "E8RUAtR i 2 1988 L-88-64 U.
S. Nuclear Regulatory Commission Attn:
Document Control Desk Washington, D.
C.
20555 Gentlemen:
Re:
Turkey Point Units 3 and 4
Docket Nos.
50-250 and 50-251 Inte rated Schedule Monthl Summar Attached is the Summary Report of the Integrated Schedule generated for the month of December, 1987.
The schedules discussed in this summary report reflect information as of the issuance date of December 15, 1987.
Updated information will be provided in subsecgxent reports.
The changes to the schedule discussed in this summary have been reviewed with members of the NRC Staff in accordance with the Integrated Schedule Plan.
In accordance with the Turkey Point Facility
- Licenses, the next complete Integrated Schedule (I/S) Report will be issued in May 1988.
Very truly yours, C. 0.
Wood Executiv ice President COW/RG gp Attachment cc:
Dr. J. Nelson Grace, Regional Administrator, Region II, USNRC Senior Resident Inspector, USNRC, Turkey Point Plant
- 8802i80092 8802i2, PDR ADOCN, 05000250 I
PDR RG/020.ISM an FPL Group company
<l
~r P
PROJECTS WHOSE NRC STATUS HAS CHANGED MOD 14 CONTROL ROOM HABITAB1LITYHVAC The NRC commitment for this modification is directly dependent on the restart of Unit 3 and the subsequent.
"stabilization" of both units.
Based on an expected restart date of December 20,
- 1987, the NRC target date should be changed to April 29, 1988.
This date is in accordance with the FPL to NRC letter, Control Room Habitability L-87-272, dated June 26, 1987.
MOD 25 UNIT 3 ALTERNATE SHUTDOWN A meeting was held on December 3,
1987 to develop a plan and schedule for the completion of training and procedures for Mod 25.
Based on input from that meeting, the expected completion is now July 6, 1988.
May 1988 was the previous completion date for procedures.
MOD 215 UNIT 3 AFW NITROGEN SUPPLY The COFO portion of this modification has been completed.
The licensing category can now be changes from "COFO" to "FPL" to address follow on activities.
MOD 246 UNIT 3 AFW STOP CHECK VALVE FAILURE The COFO portion of this modification has been completed.
The licensing category can now be changed from "COFO" to "FPL" to address follow on activities.
MOD 267 UNIT 3 AFW STOP CHECK VALVE FAILURE The COFO portion of this modification has been completed.
The licensing category can now be changed from "COFO" to "FPL" to address follow on activities.
MOD 426 UNIT 3 RPI INVERTER UPGRADE This modification had been an erroneous status of an actual start date of May 5, 1986.
The only work that has taken place includes preliminary scoping and estimating.
The reported start date has been removed and the project has been allowed to schedule by priority.
The new start date is in November 1988.
The Unit 4 modification (Mod 765) is presently scheduled to start in July 1988.
The NRC commitment for, Mod 426 will now be in December 1990.
RG/020.ISM
MOD 526 UNIT 3 MOV FAILURE DUE TO IMPROPER SWITCH SETTING
'I This modification has had additional scope added.
The original
- scope, a response to I&E Bulletin 85-03, has been completed and the NRC commitment has been met.
The additional
- scope, based on INPO recommendations, is expected to be completed by May 1, 1988.
The licensing categories for Mod 526 has been changed from "I&E" to "FPL".
MOD 531 UNIT 3 CCW TPCW AMERTAP SYSTEM The COFO portion of this modification has been completed.
The licensing category can now be changed from "COFO" to "FPL" to address follow on activities.
RG/020.ISM