Forwards Insp Repts 50-250/87-50 & 50-251/87-50 on 871212-14.No Violations or Deviations Noted
ML17342B131
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 01/12/1988
From: Herdt A
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Woody C
FLORIDA POWER & LIGHT CO.
Shared Package
ML17342B132 List:
References
NUDOCS 8802100295
Download: ML17342B131 (2)


See also: IR 05000250/1987050

Text

Docket Nos.

50-250,

50-251.

License

Nos.

DPR-31,

DPR-41

Florida Power and Light Company

ATTN:

Mr. C. 0.

Woody

Group Vice President

Nuclear Energy Department

P. 0.

Box 14000

Juno Beach,

FL

33408

Gentlemen:

SUBJECT:

NRC INSPECTION

REPORT

NOS. 50-250/87-50

AND 50-251/87-50

This refers to the Nuclear Regulatory

Commission

(NRC) inspection

conducted

by

W.

P. Kleinsorge

on

December

12-14,

1987.

The inspection included

a review of

activities authorized for your Turkey Point facility.

At the conclusion of

the inspection,

the findings were discussed

with those

members of your staff

identified in the enclosed

inspection report.

Areas

examined

during the inspection

are identified in the report.

Within

these

areas,

the inspection

consisted of selective

examinations

of procedures

and

representative

records,

interviews with personnel,

and

observation

of

activities in progress.

Within the

scope

of the

inspection,

no violations

or deviations

were

identified.

In accordance

with Section

2.790 of the

NRC's

"Rules of Practice,"

Part 2,

Title 10,

Code of Federal

Regulations,

a copy of this letter and its enclosures

will be placed in the

NRC Public Document

Room.

Should you have any questions

concerning this letter, please

contact

us.

Sincerely,

/

Alan R. Herdt, Chief

Engineering

Branch

Division of Reactor Safety

Enclosures:

NRC Inspection

Reports

8802i00295 880ii2

PDR

ADOClC 05000250

6

PDR

Florida Power and Light Company

cc w/encls:

J.

S.

Odom, Vice President

Turkey Point Nuclear Plant

C. J. Baker, Plant Manager

Turkey Point Nuclear Plant

L.

W. Bladow, Plant

gA Superintendent

J. Arias, Jr., Regulatory

and Compliance

Supervisor

bcc w/encls:

NRC Resident

Inspector

DRS Technical Assistant

Document Control

Desk

State of Florida

o

g :es

RI I

JJBl

e

/88

RII

RCerlenjak

I/ LII88