ML17342B009
| ML17342B009 | |
| Person / Time | |
|---|---|
| Site: | Turkey Point |
| Issue date: | 11/05/1987 |
| From: | Herdt A NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Woody C FLORIDA POWER & LIGHT CO. |
| Shared Package | |
| ML17342B010 | List: |
| References | |
| NUDOCS 8711130055 | |
| Download: ML17342B009 (2) | |
See also: IR 05000250/1987042
Text
0
~0
S
<9S7
Docket Nos. 50-250,
50-251
License
Nos.
Florida Power
and Light Company
ATTN:
Nr.
C. 0.
Moody
Group Vice President
Nuclear Energy Department
P. 0.
Box 14000
Juno Beach,
FL
33408
Gentlemen:
SUBJECT:
(NRC IljSPECTION REPORT NOS. 50-250/87-42
AND 50-251/87-42)
This refers to the Nuclear Regulatory
Commission
(NRC) inspection
conducted
by
J.
R. Harris
on
September
28 October 2,
1987.
The inspection
included
a
review of activities
authorized
for your Turkey Point facility.
At the
conclusion of the inspection,
the findings were discussed
with those
members of
your staff identified in the enclosed
inspection report.
Areas
examined
during the inspection
are 'identified in the report.
Mithin
these
areas,
the inspection
consisted of selective
examinations
of procedures
and
representative
records,
interviews with personnel,
and
observation
of
activities in progress.
The inspection findings indicate that certain activities appeared
to violate
bRC requirements.
This item
and references
to pertinent
requirements
are
listed in the Notice of Violation enclosed
herewith
as Enclosure
1.
Corrective
action to prevent
recurrence
have
been
completed,
therefore,
a reply is not
requested.
In accordance
with Section
2.790 of the
NRC's
"Rules of Practice,"
Part 2,
Title 10,
Code of Federal
Regulations,
a copy of this letter and its enclosure
w'ill be placed in the
NRC Public Document
Room.
Should you have any questions
concerning this letter, please
contact
us.
87iii30055 87ii05
ADOCK 05000250
8
Sincerely,
ORIGINAL SIGNED BY
ALAN R. HERDT
Alan R. Herdt, Chief
Engineering
Branch
Division of Reactor Safety
Zgol
Florida Power and 'ght
Company
NOV 0 5 1987
Enclosures:
1.
2.
NRC Inspection
Report
cc w/encls:
J.
S.
Odom, Vice President
Turkey Point Nuclear Plant
C. J.
Baker, Plant Manager
Turkey Point Nuclear Plant
L. M. Bladow, Plant
gA Superintendent
J. Arias, ilr.; Regulatory
and Compliance
Supervisor
bcc w/encls:
NRC Resident
Inspector
Document Control
Desk
State of Florida
t
RII
JRH rris:er
10/30/87
RII
TEConlon
10///87
RI~~
BW lson
10+0/87
RII
GJENK
NS
ll//87