Forwards Insp Repts 50-250/87-36 & 50-251/87-36 on 870824-28 & Notice of Violation.Full Corrective Actions on Previous Violations (50-250/87-15-01 & 50-251/87-15-01) Not Completed
ML17342A937
Person / Time
Site: Turkey Point  
Issue date: 09/30/1987
From: Stohr J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Woody C
FLORIDA POWER & LIGHT CO.
Shared Package
ML17342A938 List:
References
NUDOCS 8710060326
Download: ML17342A937 (3)


See also: IR 05000250/1987036

Text

Docket Nos. 50-250,

50-251

License

Nos'.

DPR-31,

DPR-41

Florida Power and Light Company

ATTN:

t+r.

C. '0.

h'oody

Group Vice President

Nuclear Energy Department

P.

0.

Box 14000

Juno

Beach,

FL

334GB

Gentlemen:

SljBJECT:

NOTICE OF VIOLATION

(NRC

INSPEC110N

REPORT

NOS. 50-250/87-36

AND 50-251/87-36)

This refers to the Nuclear Regulatory

Commission

(NRC) inspection

conducted

by

G.

B.

i',uzi

on

August

24-28,

1987.

The inspection

included

a

review of

activities authorized for your Turkey Point facility.

At the conclusion of the

inspection,

the findings

were

di cussed

with those

members

of your staff

identified ir, the enclosed

inspection report.

Areas

examined

curing thi >nspection

are identified in the report.

Within

these

areas,

the inspection

consisted

of selective

examinations

of procedures

and r.presentaiive

records,

interviews with personnel,

and observation

of

activities in progress.

The inspc;cticn firdincs indicate that certain activities appeared

to violate

NPC requirements.

The violations,

re crences

to pertinent

requirements,

and

elements

to be included in your rt'-sponse

are described

in the enclosed

Notice

of Violation.

The first violation aescribed

in the enclosed

Notice is similar to a violation

contained

in the Notice sent

to you

by our letter dated April 28,

1987.

Because

"ssiin'iar violations,"

as aescribed

in the

NRC Enforcement Policy,

are,

of sIgn".ficant concern

to the

NRC,

please

give particular attention

in you>

response

to the identification of the root cause

of this problem

and your

corrective action to prevent recurrence.

In addition, the inspection

revealed that full corrective actions

on previous

violations

(50-250/87-15-01,

251/87-15-01)

had not been

completed.

In your

reply tu

she

Notice of Violation referenced

above

you should indicate

what

actions

you

have

taken

to correct this'atter

and

steps

taken

to prevent

recurrence.

87100~0~

6

gpo0250

8709'3O

PDR

ADOCy 0

PDR

6

'l

Florida Power and Light Company

In accordance

with Section

2.790 of the

NRC's

"Rules of Practice,"

Part 2,

Title 10,

Code of Federal

Regulations,

a copy of this letter and its enclosures

will be. placed in the'RC Public Document

Room.

The responses

directed

by this letter and its enclosures

are not subject io %he

clearance

procedures

of the Office of hanagement

and Budget

as required

by the

Paperwork

Reduction Act of 198G,

PL 56-511.

, Shoula you have arp questions

concerning this letter,

please

contact

us.

Sincerely,

Enclosures:

Notice of Violation

Inspectior

Report

cc w/encls:

J.

S.

Odom,

V',ce President

Turkey Point Nuclear Plant

C. J. Baker, Plant Hariager

Turkey Point Nuclear Plan.i

I .

H. Bladow, Plarit gA Superintendenv,

J. Arias, Jr.,

Regulatory

and Compliarrce

Superv-isvr

bcc w/encls:

NRC Rasidenx

Irrspector

Document Control

Desk

State of Florida

J. Philip Stohr, Director

Division of Radiation Safety

and Safeguards

RII

RII

RII

Rll (

RII

t

~n I

GKuzo

CHosey

DCollins

BHilson

GJenk

/G7

9)p /87

9/~/87

9/~87

9Qg

7