Forwards Addl Response to NRC 811202 Ltr Re Violations Noted in IE Insp Repts 50-250/81-26 & 50-251/81-26.Corrective Actions:Submitting Addl Info Re Bechtel Welding & Peening Procedures
ML17341A955
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 02/09/1982
From: Robert E. Uhrig
FLORIDA POWER & LIGHT CO.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML17341A951 List:
References
L-82-48, NUDOCS 8203170364
Download: ML17341A955 (6)


Text

P.O. BOX S29100 MIAMI,F L 33152

~yvlllgz USf<RC REGION -..

@, ANTA, GEOPrir,

~ri~(i+

FLORIDA POWER & LIGHT COMPANY 02FEBl6 A'0 40 February 9, 1982 L-82-48 Mr. James P. O'Reilly Regional Administrator, Region I I U. S. Nuclear Regulatory Commission 101 Marietta Street, Suite 3100 Atlanta, Georgia 30303

Dear Mr. O'Reilly:

Re: Turkey Point Units 3 5 4 Docket Nos. 50-250 and 50-251 IE Inspection Report 81-26 Florida Power 8 Light responded to Inspection Report 81-26 in our letter (L-82-10) dated January 11, 1982. Additional information in response to questions from your staff is attached. Please notify us if you have further questions on our response. There is no proprietary information in the report.

Very truly yours, Rpbert E. Uhrig Vice President Advanced Systems and Technology REU/PLP/mbd Attachment cc: Harold F. Rei s, Esquire

(', S203l70364 820304 PDR ADOCK 050002SO 8 PDR PEOPLE SERVING PEOPLE

~ ~, t Re: Turkey Point Units 3 5 4 Docket No. 50-250 and 50-251 IE Ins~ection Ressort 81-26 The requested addi ti onal in format i on on welding terminology and peening i s provided as follows:

Manual vs. Automatic/Machine Weld~in Bechtel has two series of welding procedure specifications (WPS's); one for manual welding, and another for machine and automatic welding. The first series specifications do not contain specific statements to the effect that they are for manual weldi,ng; however, from the data contained within them, it is reasonably obvious that they address manual welding only. The second series specifications are more specific and do contain statements that they are for machine/automatic welding.

The simplest method of differentiating between manual and machine or automatic WPS's is in the WPS designation. The way that WPS's are designated is described in Welding Standard GR-1, which is normally maintained as an internal document. GR-1 points out that automatic welding procedures contain the lower case 'a 'n 'o'n the WPS designation, and machine welding procedures contain the lower case the WPS designation.

By inference, WPS's with designations which contain neither 'a'or 'o're manual welding procedures. This response was considered acceptable by the National Board of Pressure Vessel Manufacturers during an audit at Bechtel's San Francisco office.

Peening It is Bechtel standard practice to prohibit the use of peening.

Paragraph QW-410.26 of ASME Section IX is listed as non-essential variable for all commonly used welding processes. This paragraph specifically addresses "the addition or deletion of peeni ng", which has been interpr eted to mean that peening needs to be addressed in the WPS's or GWS's only if it is added to or deleted from a WPS or GWS. Since this has never occurred, they have not felt the need to address peening.

4 444

'4 II ~, 4 ~

Il 4, 4 4 4 I 4 4

I I'

'I II t 4

4 II III 4 4 4 I I I 4 It 5 I I ~

4 II 4 1

STATE OF FLORiDA COUNTY OF DADE

)

) st

)

Robert E. Uhri g being first duly sworn, deposes and says:

That he 's Vice President of Florida Power Light Company, the herein; That he has executed the foregoing document; that the state-ments made in th's said document are true and correct to the best of his knowledge, information, and belief, and that he is authorized to execute the document on behalf of said Robert E. Uhrig Subscr'ed and sworn to before me th' QR'1 Of l9

.NOTARY-PUBLXC, Stake of Florida i and for the County of Dade, o( c.'o<<on at Large r orary '4b"C CornrnMiion Expiree October 30, 1983 My Bonding Agency My commission expires: Bonded thru Maynard