ML17341A853

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Repts 50-250/81-25 & 50-251/81-25 on 810926-1025 & Notice of Violation
ML17341A853
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 11/27/1981
From: Kellogg P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Robert E. Uhrig
FLORIDA POWER & LIGHT CO.
Shared Package
ML17341A850 List:
References
NUDOCS 8202050124
Download: ML17341A853 (4)


See also: IR 05000250/1981025

Text

~

oQ

~

'V

)/e/l~w

NOV 2 7 198)

Florida Power

and Light Company

ATTN:

Dr.

R.

E. Uhrig, Vice President

Advanced

Systems

and Technology

P. 0.

Box 529100

Miami, FL. 33152

Gentlemen:

Subject:

Report Nos.

50-

-2

and 50-251/81-25

This refers

to the routine safety inspection

conducted

by tir.

R. Vogt-Lowell of

this office on September

26 - October 25,

1981, of activities authorized

by

NRC

Operating

License

Nos.

DPR-31 and

DPR-41 for the Turkey Point facility.

Our

preliminary findings were discussed

with Hr. J.

K. Hays, Plant tanager,

at the

conclusion of the inspection.

Areas

examined during the inspection

and our findings are discussed

in the

enclosed

inspection report.

Within these

areas,

the inspection consisted of

selective

examinations

of procedures

and representative

records,

interviews with

personnel,

and observations

by the inspector.

During the inspection, it was found that certain activities under your license

appear

to violate

NRC requirements.

This item and references

to pertinent

requirements

are listed in the Notice of Violation enclosed

herewith

as

Appendix A.

Elements

to

be included in your response

are delineated

in

Appendix A.

Two new unresolved

items were identified in the enclosed

inspection report.

The

items will be examined during subsequent

inspections.

In accordance

with 10 CFR 2.790(a),

a copy of this letter and the enclosure will

be placed

in the

NRC's Public Document

Room unless

you notify this office, by

telephone,

within ten days of the date of this letter and submit written

application to withhold information contained therein within thirty days of the

date of this letter.

Such application must

be consistent

with the requirements

of 2.790(b)(1).

Should you

have

any questions

concerning this letter,

we will be glad to discuss

them with you.

Sincerely,

Enclosures:

(See

Page

2)

8202050l24

820120

PDR,AOOCZ OSOOO250

~- '.'9-

',,,

PDR

Paul J. Kellogg, Chief

Reactor Project

Branch

2

Division of Resident

and

Reactor Project Inspection

P

I

!

W

I

~

~

Florida Power

and Light Company

HOV 2 7 iS8l

Enclosures:

l.

Appendix A, Notice of Violation

2.

Inspection

Report

Nos. 50-250/81-25

and 50-251/81-25

cc w/encl:

H.

E. Yaeger, Site tanager

bcc w/encl:

NRC Resident Inspector

Document

t1anagement

Branch

State of Florida

RI I

RII

RVL (ell:dt

KL nd

s

11/

/81

11/~Q /81

RII~

HCDance

11/w'L /81

RII

PJK

1 ogg

11/ pi/81

II

~

I

J

I