ML17341A853
ML17341A853 | |
Person / Time | |
---|---|
Site: | Turkey Point |
Issue date: | 11/27/1981 |
From: | Kellogg P NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
To: | Robert E. Uhrig FLORIDA POWER & LIGHT CO. |
Shared Package | |
ML17341A850 | List: |
References | |
NUDOCS 8202050124 | |
Download: ML17341A853 (4) | |
Similar Documents at Turkey Point | |
---|---|
Category:CORRESPONDENCE-LETTERS
MONTHYEARL-99-223, Forwards Revised Epips,Including Revs to 0-EPIP-1102, 0-EPIP-1212,0-EPIP-20110,0-EPIP-20111,0-EPIP-20132, 0-EPIP-20133 & 0-EPIP-20201,per 10CFR50.54(q) & 10CFR50, App E.Epip 0-EPIP-20107,has Been Deleted1999-10-26026 October 1999
[Table view]Forwards Revised Epips,Including Revs to 0-EPIP-1102, 0-EPIP-1212,0-EPIP-20110,0-EPIP-20111,0-EPIP-20132, 0-EPIP-20133 & 0-EPIP-20201,per 10CFR50.54(q) & 10CFR50, App E.Epip 0-EPIP-20107,has Been Deleted ML17355A4491999-10-20020 October 1999 Discusses Request for Relief 20 Submitted by FP&L on 990409 & 990907 from Requirements of ASME Code Section Xi,Contained in First ten-year Interval for Containment ISI Program at Turkey Point.Forwards SE Supporting Proposed Alternative ML17355A4571999-10-15015 October 1999 Forwards Exam Repts 50-250/99-301 & 50-251/99-301 on 990830- 0916.All Seven SRO & RO Applicants Who Received Written Exams & Operating Tests Passed,Representing 100 Percent Pass Rate ML17355A4481999-10-13013 October 1999 Informs That on 990930,NRC Staff Completed mid-cycle PPR of Turkey Point Nuclear Plant & Did Not Identify Any Areas in Which Performance Warranted More than Core Insp Program.Nrc Plans to Conduct Core Insp at Facility Over Next 5 Months L-99-209, Forwards Rev 16 of Updated Fsar.Info Accurately Reflects Plant Changes Made Since Previous Submittal.Rev Incorporates Changes Completed Between 971015 & 990408.Summary of Accuracy Review Changes & Instructions,Included1999-10-0808 October 1999 Forwards Rev 16 of Updated Fsar.Info Accurately Reflects Plant Changes Made Since Previous Submittal.Rev Incorporates Changes Completed Between 971015 & 990408.Summary of Accuracy Review Changes & Instructions,Included ML17355A4301999-10-0808 October 1999 Forwards Rev 16 of Updated Fsar.Info Accurately Reflects Plant Changes Made Since Previous Submittal.Rev Incorporates Changes Completed Between 971015 & 990408.Summary of Accuracy Review Changes & Instructions,Included ML17355A4291999-10-0404 October 1999 Forwards Response to NRC Telcon Questions Re License Amend Request Dtd 990727,proposing Amend on one-time Basis to Modify TS 3.8.1.1 & TS 3.4.3 & 3.5.2 to Extend Allowed Outage Time for EDG from 72 H to 7 Days L-99-208, Forwards Changes,Tests & Experiments Made as Allowed by 10CFR50.59 for Period Covering 971014-990408. Summary of PORV Actuations & Results of Plants SG Tube Insp,Which Occurred During That Time Included1999-10-0404 October 1999 Forwards Changes,Tests & Experiments Made as Allowed by 10CFR50.59 for Period Covering 971014-990408. Summary of PORV Actuations & Results of Plants SG Tube Insp,Which Occurred During That Time Included L-99-217, Notifies NRC of Change in Commitment to Perform Periodic Testing of Critical Welds & Parts on Special Lifting Devices IAW NUREG-0612.Use of Ae Technology Will Provide Same Level of Testing Quality as Did NDE Methods Noted in ANSI Std1999-10-0404 October 1999 Notifies NRC of Change in Commitment to Perform Periodic Testing of Critical Welds & Parts on Special Lifting Devices IAW NUREG-0612.Use of Ae Technology Will Provide Same Level of Testing Quality as Did NDE Methods Noted in ANSI Std ML17355A4281999-10-0404 October 1999 Discusses Closeout of GL 97-06, Degradation of SG Intervals. Purpose of GL Was to Obtain Info That Would Enable Staff to Verify That Condition of Licensee SG Internals Comply with Current Licensing Bases for Plants ML17355A4461999-10-0404 October 1999 Notifies NRC of Change in Commitment to Perform Periodic Testing of Critical Welds & Parts on Special Lifting Devices IAW NUREG-0612.Use of Ae Technology Will Provide Same Level of Testing Quality as Did NDE Methods Noted in ANSI Std L-99-216, Forwards Response to NRC Telcon Questions Re License Amend Request Dtd 990727,proposing Amend on one-time Basis to Modify TS 3.8.1.1 & TS 3.4.3 & 3.5.2 to Extend Allowed Outage Time for EDG from 72 H to 7 Days1999-10-0404 October 1999 Forwards Response to NRC Telcon Questions Re License Amend Request Dtd 990727,proposing Amend on one-time Basis to Modify TS 3.8.1.1 & TS 3.4.3 & 3.5.2 to Extend Allowed Outage Time for EDG from 72 H to 7 Days ML20212M1601999-09-28028 September 1999 Refers to 990908 Engineering Meeting Conducted at NRC Region II to Discuss Engineering Issues at Lucie & Turkey Point Facilities.List of Attendees & Copy of Presentation Handout Encl ML17355A4251999-09-22022 September 1999 Forwards NRC Form 536 in Response to NRC Administrative Ltr 99-03, Preparation & Scheduling of Operator Licensing Exams, Issued 990820 L-99-197, Forwards NRC Form 536 in Response to NRC Administrative Ltr 99-03, Preparation & Scheduling of Operator Licensing Exams, Issued 9908201999-09-22022 September 1999 Forwards NRC Form 536 in Response to NRC Administrative Ltr 99-03, Preparation & Scheduling of Operator Licensing Exams, Issued 990820 ML17355A4221999-09-16016 September 1999 Requests That Util Assess Impact of Proposed Potential Risk of Proposed Civil Aircraft Operations at Homestead Air Force Base & Update FSAR & Other Related Documents When Proposal Becomes More Defined L-99-196, Informs That Thermo-Lag Upgrades for Fire Zones 47,54,113, 114,115,116,118,119,120 & 143 Completed on 990726,per GL 92-081999-09-0909 September 1999 Informs That Thermo-Lag Upgrades for Fire Zones 47,54,113, 114,115,116,118,119,120 & 143 Completed on 990726,per GL 92-08 L-99-187, Forwards Revised Relief Request 20 Re Requirement to Perform Exams as Required by IWL-2524 & IWL-2525,Table IWL-2500-1 for Exempt Tendon Insp,Per Recent Discussions with NRC1999-09-0707 September 1999 Forwards Revised Relief Request 20 Re Requirement to Perform Exams as Required by IWL-2524 & IWL-2525,Table IWL-2500-1 for Exempt Tendon Insp,Per Recent Discussions with NRC ML17355A4131999-09-0707 September 1999 Forwards Revised Relief Request 20 Re Requirement to Perform Exams as Required by IWL-2524 & IWL-2525,Table IWL-2500-1 for Exempt Tendon Insp,Per Recent Discussions with NRC L-99-198, Documents That Util Has No Concerns or Challenges Related to site-specific Written Exam Administered at Plant on 9908301999-09-0202 September 1999 Documents That Util Has No Concerns or Challenges Related to site-specific Written Exam Administered at Plant on 990830 ML17355A4141999-09-0202 September 1999 Documents That Util Has No Concerns or Challenges Related to site-specific Written Exam Administered at Plant on 990830 ML17355A4151999-09-0101 September 1999 Forwards Summary of 990812-13 Training Managers Conference in Atlanta,Georgia Re Recent Changes to Operator Licensing Program.List of Conference Attendees,Copy of Slide Presentations & List of Participant Questions Encl L-99-174, Informs That FPL Has Completed Review of Info Listed in Reactor Vessel Integrity Database,Version 2 & Found Listed Discrepancies,Re Closure of GL 92-01,rev 1,suppl 1, Reactor Vessel Structural Integrity1999-08-23023 August 1999 Informs That FPL Has Completed Review of Info Listed in Reactor Vessel Integrity Database,Version 2 & Found Listed Discrepancies,Re Closure of GL 92-01,rev 1,suppl 1, Reactor Vessel Structural Integrity L-99-178, Forwards Semiannual FFD Performance Rept for Period of Jan- June 1999,for Turkey Point Units 3 & 4.List of Events Reported & Summary of Mgt Actions Taken,Included1999-08-23023 August 1999 Forwards Semiannual FFD Performance Rept for Period of Jan- June 1999,for Turkey Point Units 3 & 4.List of Events Reported & Summary of Mgt Actions Taken,Included ML17355A4041999-08-23023 August 1999 Forwards Info to Support Assessment of Potential Risks Associated with Proposed Civil Aircraft Operations at Former Homestead Air Force Base to FP&L Turkey Point Nuclear Facility Units 3 & 4 ML17355A4081999-08-23023 August 1999 Forwards Insp Repts 50-250/99-04 & 50-251/99-04 on 990613-0724.Two Violations Occurred & Being Treated as NCV ML17355A4001999-08-20020 August 1999 Informs That on 990722,util Determined Blind Specimen Submitted to Smithkline Beecham Clinical Labs on 990721,was Reported Back with Unsatisfactory Results.Attachment 1 Is Summary of Investigation of Unsatisfactory Performance L-99-173, Informs That on 990722,util Determined Blind Specimen Submitted to Smithkline Beecham Clinical Labs on 990721,was Reported Back with Unsatisfactory Results.Attachment 1 Is Summary of Investigation of Unsatisfactory Performance1999-08-20020 August 1999 Informs That on 990722,util Determined Blind Specimen Submitted to Smithkline Beecham Clinical Labs on 990721,was Reported Back with Unsatisfactory Results.Attachment 1 Is Summary of Investigation of Unsatisfactory Performance ML17355A4051999-08-20020 August 1999 Confirms 990813 Telcon Between M Dryden & at Boland Re Engineering Meeting to Be Conducted on 990908 in Atlanta,Ga to Discuss Engineering Issues at St Lucie & Turkey Point Facilities ML17355A3991999-08-12012 August 1999 Forwards Evaluation Rept Accepting Licensee Responses to GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design Basis Accident Conditions ML17355A3971999-08-0505 August 1999 Informs That NRC Plans to Administer Gfes of Written Operator Licensing Exam on 991006 at St Lucie & Turkey Point Nuclear Plants.Sample Registration Ltr Encl L-99-172, Submits Response to NRC AL 99-02, Operating Reactor Licensing Action Estimates, for FY00 & FY011999-07-27027 July 1999 Submits Response to NRC AL 99-02, Operating Reactor Licensing Action Estimates, for FY00 & FY01 ML17355A3941999-07-27027 July 1999 Submits Response to NRC AL 99-02, Operating Reactor Licensing Action Estimates, for FY00 & FY01 L-99-165, Provides Supplement to FP&L Response to NRC Request for Info Re Y2K Readiness at Nuclear Power Plants1999-07-16016 July 1999 Provides Supplement to FP&L Response to NRC Request for Info Re Y2K Readiness at Nuclear Power Plants L-99-152, Informs That Pages Missing from 1998 Annual Radiological Environ Operating Rept, Contain Info Unrelated to ODCM- Specified Sampling & Were Not Included as Part of Rept1999-07-14014 July 1999 Informs That Pages Missing from 1998 Annual Radiological Environ Operating Rept, Contain Info Unrelated to ODCM- Specified Sampling & Were Not Included as Part of Rept L-99-147, Forwards Revised EPIPs 0-EPIP-20201, Maintaining Emergency Preparedness - Radiological Emergency Plan Training & 0-EPIP-20126, Off-Site Dose Calculations. with Summary of Changes1999-07-0606 July 1999 Forwards Revised EPIPs 0-EPIP-20201, Maintaining Emergency Preparedness - Radiological Emergency Plan Training & 0-EPIP-20126, Off-Site Dose Calculations. with Summary of Changes L-99-151, Forwards Florida Power & Light Topical QA Rept, Dtd June 1999.Encl I Includes Summary of Changes Made to Topical QA Rept Since 19981999-06-30030 June 1999 Forwards Florida Power & Light Topical QA Rept, Dtd June 1999.Encl I Includes Summary of Changes Made to Topical QA Rept Since 1998 L-99-140, Forwards Turkey Point,Unit 4 ISI Rept. Listed Repts Are Encl.No Eddy Current Exams Scheduled for Unit 4 Steam Generators1999-06-30030 June 1999 Forwards Turkey Point,Unit 4 ISI Rept. Listed Repts Are Encl.No Eddy Current Exams Scheduled for Unit 4 Steam Generators L-99-137, Informs That Util Voluntarily Reporting Facility Readiness as Outlined in Suppl 1 to GL 98-01.Encl Is Y2K Readiness Disclosure for Units 3 & 4,reporting Status of Facility Y2K Readiness1999-06-28028 June 1999 Informs That Util Voluntarily Reporting Facility Readiness as Outlined in Suppl 1 to GL 98-01.Encl Is Y2K Readiness Disclosure for Units 3 & 4,reporting Status of Facility Y2K Readiness L-99-136, Forwards Response to NRC 990415 RAI Re GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Motor-Operated Valves1999-06-18018 June 1999 Forwards Response to NRC 990415 RAI Re GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Motor-Operated Valves L-99-117, Forwards Summary of Corrective Actions Implemented by FPL Re GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design Basis Accident Conditions1999-06-0404 June 1999 Forwards Summary of Corrective Actions Implemented by FPL Re GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design Basis Accident Conditions L-99-031, Modifies FPLs Consent to Confirmatory Order to Reflect Resolution of Four Issues Identified as Pending in L-99-0311999-05-27027 May 1999 Modifies FPLs Consent to Confirmatory Order to Reflect Resolution of Four Issues Identified as Pending in L-99-031 L-99-115, Requests Waiver of 520 Hours (13 Wks) Required Parallel Watchstanding in Control Room Prior to License Application Submittal for W Conley1999-05-24024 May 1999 Requests Waiver of 520 Hours (13 Wks) Required Parallel Watchstanding in Control Room Prior to License Application Submittal for W Conley ML17241A3281999-05-13013 May 1999 Informs That NRC Office of Nuclear Reactor Regulation Reorganized Effective 990328.As Part of Reorganization, Division of Licensing Project Management Created ML17336A0661999-05-0303 May 1999 Responds to to Chairman Jackson Expressing Support for FP&L Request for Waiver of Applicable Review Fees Associated with Application for License Renewal for Plant,Units 3 & 4 L-99-085, Forwards Rev 35 to Turkey Point EP & Revised EPIP 0-EPIP-20101, Duties of EC, Per Requirements of 10CFR50, App E & 10CFR50.54(q).Summary of Changes,Encl.Implementation Date for Both Documents Was 9903301999-04-22022 April 1999 Forwards Rev 35 to Turkey Point EP & Revised EPIP 0-EPIP-20101, Duties of EC, Per Requirements of 10CFR50, App E & 10CFR50.54(q).Summary of Changes,Encl.Implementation Date for Both Documents Was 990330 ML17355A2961999-04-16016 April 1999 Discusses DOL Administrative Review Board Case 98-ERA-044 & Administrative Law Judge Case 96-ERA-36.Investigation of Complaint Concluded That There Was Insufficient Evidence to Substantiate Allegation of Discrimination.Case Dismissed ML20205M0431999-04-13013 April 1999 Eighth Partial Response to FOIA Request for Records.App Q & R Records Encl & Being Made Available in PDR L-99-075, Forwards Relief Request 20, Exempt Tendon Insp, Requesting Relief from ASME Section XI Code,1992 Edition,Paragraph IWL-2521.1(c) Which Requires That Each Exempted Tendon Be Examined IAW IWL-2524 & IWL-2525.Approval Needed by 9910011999-04-0909 April 1999 Forwards Relief Request 20, Exempt Tendon Insp, Requesting Relief from ASME Section XI Code,1992 Edition,Paragraph IWL-2521.1(c) Which Requires That Each Exempted Tendon Be Examined IAW IWL-2524 & IWL-2525.Approval Needed by 991001 L-99-074, Forwards COLR for Turkey Point Unit 4,Cycle 18,IAW TS 6.9.1.71999-04-0505 April 1999 Forwards COLR for Turkey Point Unit 4,Cycle 18,IAW TS 6.9.1.7 1999-09-09 Category:NRC TO UTILITY MONTHYEARML17348A7461990-11-16016 November 1990
[Table view]Advises That Util 900928 Response to Generic Ltr 90-03, Relaxation of Staff Position in Generic Ltr 83-28,Item 2.2, Part 2, Vendor Interface for Safety-Related Components, Meets Requirement ML17348A7411990-11-0808 November 1990 Forwards Summary for Allegation Rii 90-A-0187,per 901107 Telcon & Requests Initiation of Review.Encl Withheld (Ref 10CFR2.790(a)(6) & 2.970(a)(7)) ML17348A7321990-11-0606 November 1990 Forwards Info Re Allegation Rii 90-A-0168,per 901105 Telcon. Results of Review Requested within 45 Days.W/O Encl IR 05000250/19900351990-10-30030 October 1990 Forwards Insp Repts 50-250/90-35 & 50-251/90-35 on 901001-05.No Violations or Deviations Noted.Repts Withheld (Ref 10CFR73.21) IR 05000250/19900261990-10-16016 October 1990 Discusses SALP Repts 50-250/90-26 & 50-251/90-26 & Forwards Summary of 901005 Meeting in Florida City,Fl ML17348A6101990-10-12012 October 1990 Requests Analyses of Liquid Samples Spiked W/Radionuclides Be Completed within 60 Days of Sample Receipt ML17348A6031990-09-28028 September 1990 Ack Receipt of Requesting Temporary Waiver of Compliance from Action Statement of Tech Specs 3.6 & 3.0.1. Request for 24 H Time Extension Granted,Per 900927 Telcon ML17223A9481990-09-19019 September 1990 Forwards Request for Addl Info Re Topical Rept NTH-TR-01 on Retran Model Qualification & Decrease in Heat Removal by Secondary Sys ML17348A5531990-09-0707 September 1990 Forwards Insp Repts 50-250/90-28 & 50-251/90-28 on 900806- 10.Violations Noted But Not Cited ML17348A5221990-08-23023 August 1990 Forwards Insp Repts 50-250/90-29 & 50-251/90-29 on 900730-0802.No Violations or Deviations Noted ML17348A5181990-08-20020 August 1990 Ack Receipt of 900810 Response to Violations Noted in Insp Repts 50-250/90-18 & 50-251/90-18 ML17348A5191990-08-17017 August 1990 Forwards Insp Repts 50-250/90-25 & 50-251/90-25 on 900630- 0803.Violation Noted But Not Cited ML20058N2041990-08-10010 August 1990 Advises That 900725 Rev 23 to Physical Security Plan Consistent W/Provisions of 10CFR50.54(p) & Acceptable ML17348A4851990-08-0606 August 1990 Forwards Notice of Withdrawal of Portion of Application for Amends to Plant Ols,Per .Amends Regard Composition List of Company Nuclear Review Board IR 05000250/19900141990-07-27027 July 1990 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-250/90-14 & 50-251/90-14 ML17348A4781990-07-27027 July 1990 Advises That Util Responses to NRC Bulletin 88-010 Confirms That Actions Required to Address Issue of Substandard Molded Case Circuit Breakers Completed ML20055J2431990-07-24024 July 1990 Advises That 900711 Rev 22 to Physical Security Plan Consistent W/Provisions of 10CFR50.54(p) & Acceptable.Plan Withheld (Ref 10CFR73.21) ML17348A4811990-07-23023 July 1990 Forwards Insp Repts 50-250/90-18 & 50-251/90-18 on 900526-0629 & Notice of Violation ML17348A4421990-07-19019 July 1990 Forwards Insp Repts 50-250/90-22 & 50-251/90-22 on 900618-22.No Violations or Deviations Noted ML17348A4711990-07-18018 July 1990 Forwards Insp Repts 50-250/90-21 & 50-251/90-21 on 900625-29.No Violations or Deviations Noted ML17348A4541990-07-18018 July 1990 Forwards Insp Repts 50-250/90-23 & 50-251/90-23 on 900625- 29.No Violations or Deviations Noted IR 05000250/19900091990-07-16016 July 1990 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-250/90-09 & 50-251/90-09 ML17348A4331990-07-13013 July 1990 Forwards Insp Repts 50-250/90-19 & 50-251/90-19 on 900618-22.No Violations or Deviations Noted ML17348A5441990-06-28028 June 1990 Requests Ref Matls by 900829 in Preparation for Reactor Operator (RO) & Senior RO Exams Scheduled for Wks of 901029-1116 ML17348A4011990-06-25025 June 1990 Forwards Insp Repts 50-250/90-15 & 50-251/90-15 on 900521-25.No Violations or Deviations Noted ML17348A3511990-06-21021 June 1990 Forwards Insp Repts 50-250/90-14 & 50-251/90-14 on 900428-0525 & Notice of Violation ML17348A2951990-06-15015 June 1990 Forwards Request for Addl Info Re Emergency Power Sys Enhancement Project ML17348A3071990-06-15015 June 1990 Forwards Safety Evaluation Re Implementation of Station Blackout Rule.Listed Areas Require Followup Insp to Verify That Implementation of Mods & Supporting Documents Adequate to Meet Station Blackout Rule ML20059M9461990-06-13013 June 1990 Forwards NRC Performance Indicators for First Quarter 1990. W/O Encl ML17348A2971990-06-0606 June 1990 Summarizes 900516 Meeting W/Util Onsite Re Planned Dual Unit Outage Scope,Outage Planning & Other Programmatic Issues. List of Attendees,Meeting Agenda,Meeting Summary & Handout Encl ML17348A2711990-05-25025 May 1990 Forwards Insp Repts 50-250/90-09 & 50-251/90-09 on 900324-0427 & Notice of Violation ML17348A2591990-05-23023 May 1990 Advises That 890619 Response to NRC Bulletin 89-001 Re Westinghouse Steam Generator Tube Plugs,Acceptable,Except Statement That Util Does Not Intend to Operate Beyond Last Outage Before Any Plug Exhausts Predicted Lifetime ML17348A2601990-05-22022 May 1990 Advises That 880318 Response to Bulletin 88-002 Adequate, Based on Confirmation That Steam Generators Fabricated from 405 Stainless Steel & Not Susceptible to Type of Failure Discussed in Bulletin.Action on Bulletin Complete ML20055C5941990-05-16016 May 1990 Advises That 900305 & 0416 Revs 20 & 21 to Physical Security Plan Consistent W/Provisions of 10CFR50.54(p) & Acceptable ML17348A2541990-05-11011 May 1990 Forwards Requalification Exam Rept 50-250/OL-90-02 for Units 1 & 2 During Wks of 900326 & 0402 ML17348A2411990-05-10010 May 1990 Requests Assistance from Util Re Operating History of Selected Plant Fuel Assemblies to Aid NRC in Revising Reg Guide 3.54, Spent Fuel Heat Generation in Isfsi ML17348A2311990-05-0404 May 1990 Forwards Proof & Review Tech Specs for Emergency Power Enhancement Program for Comment by 900509 ML17348A2181990-04-27027 April 1990 Forwards Summary of Anonymous Allegation RII-90-A-0049,per 900419 Telcon.Summary Withheld (Ref 10CFR2.790(a)(6)(7)) IR 05000250/19890531990-04-26026 April 1990 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-250/89-53 & 50-251/89-53 ML17348A2111990-04-24024 April 1990 Provides Info Re Interpretation of Bioassay Measurements, Specifying That Assessment of Individual Intakes Using Bioassay Data Should Be Based on Best Data & Models Available ML17348A1971990-04-13013 April 1990 Advises That Except for Two Items,Rev 19 to Plant Emergency Plan Meets 10CFR50.47(b) Planning Stds & Acceptable. Unacceptable Items Include,Shift & Emergency Staffing Capabilities & Accident Classification ML17348A1981990-04-13013 April 1990 Forwards Insp Repts 50-250/90-06 & 50-251/90-06 on 900224-0323.Violations Noted But Not Cited IR 05000250/19892031990-04-12012 April 1990 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-250/89-203 & 50-251/89-203 IR 05000250/19890481990-04-10010 April 1990 Ack Receipt of 900227 & 0326 Ltrs Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-250/89-48 & 50-251/89-48 IR 05000250/19890541990-04-0404 April 1990 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-250/89-54 & 50-251/89-54 ML17347B6371990-03-23023 March 1990 Advises That Util 900130 Response to Generic Ltr 89-13, Svc Water Sys Problems Affecting Safety-Related Equipment Meets Requirements.Documentation Demonstrating Implementation of Recommended Actions Should Be Retained in Plant Records ML20012E2521990-03-15015 March 1990 Forwards Insp Repts 50-250/90-02 & 50-251/90-02 on 900129- 0202.Noncited Violations Noted ML17347B6411990-03-14014 March 1990 Forwards Insp Repts 50-250/90-04 & 50-251/90-04 on 900127-0223 & Notice of Violation ML17347B6381990-03-14014 March 1990 Forwards Insp Repts 50-250/89-53 & 50-251/90-53 on 900122-0202.Strengths in Emergency Procedures Program & Deficiencies Noted.Response Stating Intended Corrective Actions Re Findings Should Be Submitted within 30 Days IR 05000250/19890521990-03-0707 March 1990 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-250/89-52 & 50-251/89-52 1990-09-07 Category:OUTGOING CORRESPONDENCE MONTHYEARML17355A4491999-10-20020 October 1999
[Table view]Discusses Request for Relief 20 Submitted by FP&L on 990409 & 990907 from Requirements of ASME Code Section Xi,Contained in First ten-year Interval for Containment ISI Program at Turkey Point.Forwards SE Supporting Proposed Alternative ML17355A4571999-10-15015 October 1999 Forwards Exam Repts 50-250/99-301 & 50-251/99-301 on 990830- 0916.All Seven SRO & RO Applicants Who Received Written Exams & Operating Tests Passed,Representing 100 Percent Pass Rate ML17355A4481999-10-13013 October 1999 Informs That on 990930,NRC Staff Completed mid-cycle PPR of Turkey Point Nuclear Plant & Did Not Identify Any Areas in Which Performance Warranted More than Core Insp Program.Nrc Plans to Conduct Core Insp at Facility Over Next 5 Months ML17355A4281999-10-0404 October 1999 Discusses Closeout of GL 97-06, Degradation of SG Intervals. Purpose of GL Was to Obtain Info That Would Enable Staff to Verify That Condition of Licensee SG Internals Comply with Current Licensing Bases for Plants ML20212M1601999-09-28028 September 1999 Refers to 990908 Engineering Meeting Conducted at NRC Region II to Discuss Engineering Issues at Lucie & Turkey Point Facilities.List of Attendees & Copy of Presentation Handout Encl ML17355A4221999-09-16016 September 1999 Requests That Util Assess Impact of Proposed Potential Risk of Proposed Civil Aircraft Operations at Homestead Air Force Base & Update FSAR & Other Related Documents When Proposal Becomes More Defined ML17355A4151999-09-0101 September 1999 Forwards Summary of 990812-13 Training Managers Conference in Atlanta,Georgia Re Recent Changes to Operator Licensing Program.List of Conference Attendees,Copy of Slide Presentations & List of Participant Questions Encl ML17355A4081999-08-23023 August 1999 Forwards Insp Repts 50-250/99-04 & 50-251/99-04 on 990613-0724.Two Violations Occurred & Being Treated as NCV ML17355A4051999-08-20020 August 1999 Confirms 990813 Telcon Between M Dryden & at Boland Re Engineering Meeting to Be Conducted on 990908 in Atlanta,Ga to Discuss Engineering Issues at St Lucie & Turkey Point Facilities ML17355A3991999-08-12012 August 1999 Forwards Evaluation Rept Accepting Licensee Responses to GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design Basis Accident Conditions ML17355A3971999-08-0505 August 1999 Informs That NRC Plans to Administer Gfes of Written Operator Licensing Exam on 991006 at St Lucie & Turkey Point Nuclear Plants.Sample Registration Ltr Encl ML17241A3281999-05-13013 May 1999 Informs That NRC Office of Nuclear Reactor Regulation Reorganized Effective 990328.As Part of Reorganization, Division of Licensing Project Management Created ML17336A0661999-05-0303 May 1999 Responds to to Chairman Jackson Expressing Support for FP&L Request for Waiver of Applicable Review Fees Associated with Application for License Renewal for Plant,Units 3 & 4 ML17355A2961999-04-16016 April 1999 Discusses DOL Administrative Review Board Case 98-ERA-044 & Administrative Law Judge Case 96-ERA-36.Investigation of Complaint Concluded That There Was Insufficient Evidence to Substantiate Allegation of Discrimination.Case Dismissed ML20205M0431999-04-13013 April 1999 Eighth Partial Response to FOIA Request for Records.App Q & R Records Encl & Being Made Available in PDR ML17355A2761999-03-26026 March 1999 Forwards SE as Closeout Rept for Ampacity Derating Issues Re GL 92-08, Thermo-Lag 330-1 Fire Barriers, Per Util 980626 & 30 Responses to NRC 980423 Rai.No Outstanding Ampacity Derating Issues as Identified in GL for Plants ML17355A2811999-03-22022 March 1999 Advises of Completion of Plant Performance Review on 990203. Review Conducted to Develop Integrated Understanding of Safety Performance,Facilitate Planning & Allocation of Insp Responses.Plant Issue Matrix Encl ML17355A2561999-03-0808 March 1999 Forwards Insp Repts 50-250/98-13 & 50-251/98-13 on 981227-990206.No Violation or Deviations Noted ML17355A2241999-02-0505 February 1999 Informs That NRC Plans to Administer Generic Fundamentals Exam Section of Written Operator Licensing Exam on 990407. Representative of Facility Must Submit Ltr Indicating No Candidates or Ltr Listing Names of Condidates for Exam ML17355A1991999-01-25025 January 1999 Discusses Util Re Participation in WOG Initiative & Activities at Turkey Point Plant,Units 3 & 4,resulting from Initiative ML17355A1981999-01-14014 January 1999 Informs That on 990117,Region II Will Implement Staff Reorganization as Part of an agency-wide Streamlining Effort.Reorganization Necessary Due to Staffing Reductions in FY99 Budget ML17355A1931999-01-12012 January 1999 Forwards Insp Repts 50-250/98-12 & 50-251/98-12 on 981115-1226.No Violations Noted.Conduct of Activities at Facility Was Generally Characterized by safety-conscious Operations & Critical self-assessment ML17354B1771998-11-0202 November 1998 Refers to 981022 Meeting Re NRC Systematic Assessment of Licensee Performance for Turkey Point Nuclear Plant.List of Attendees & Presentation Slides Encl DD-98-10, Informs That Delivery of Directors Decision DD-98-10,dtd 981021 Was Delayed & Returned to Sender, Rather than Being Forwarded to New Address1998-10-30030 October 1998 Informs That Delivery of Directors Decision DD-98-10,dtd 981021 Was Delayed & Returned to Sender, Rather than Being Forwarded to New Address ML17354B1601998-10-26026 October 1998 Forwards Request for Addl Info Re GL 97-01, Degradation of Crdm/Cedm Nozzle & Other Vessel Closure Head Penetrations, for Turkey Point Plant,Units 3 & 4.Target Date for Response Agreed Upon to Be 120 Days from Receipt of RAI ML20154B2531998-09-17017 September 1998 Responds to Stating Intention to Pursue License Renewal Application for Turkey Point,Units 3 & 4.Info Shared by Util Will Be Useful for NRC Resource Planning ML17354B1241998-09-15015 September 1998 Forwards Insp Repts 50-250/98-08 & 50-251/98-08 on 980712-0822.No Violations Noted IR 05000250/19980071998-08-14014 August 1998 Discusses Insp Repts 50-250/98-07 & 50-251/98-07 Completed on 980711.NRC Examined Issue Identified by FPL in 1998, Associated w/1984 Mod Which Affected RHR Sys Pressure Control Relays IR 05000250/19980061998-08-10010 August 1998 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-250/98-06 & 50-251/98-06 Issued on 980625 ML17354B0701998-08-0505 August 1998 Discusses 980615 Response to NRC RAI of 980414 Re Potential of Converting Homestead Air Force Base to Commerical Airport & Impact of Conversion on Plant,Units 3 & 4.Believes That Spectrum of Potential Projects Still Under Exam ML20236S7521998-07-20020 July 1998 Ltr Contract:Task Order 15, Turkey Point Safety Sys Enginering Insp, Under Contract NRC-03-98-021 ML17354B0521998-07-15015 July 1998 Addresses Certain Requests Made in Petitions,Dtd 980226,27 & 0306 Re St Lucie & Turkey Point Nuclear Facilities ML17354B0291998-07-0909 July 1998 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Investigations Rept 2-97-025. Corrected Ltr IR 05000250/19960271998-07-0909 July 1998 Forwards Corrected Ltr to Re NRC Insp Repts 50-250/96-27 & 50-251/96-27 ML17354B0251998-07-0707 July 1998 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-250/96-27 & 50-251/96-27.Response Meets Requirements of 10CFR2.201 ML17354A9881998-06-16016 June 1998 Informs of Completion of Licensing Action for GL-97-04, Assurance of Sufficent Net Positive Suction Head for Emergency Core Cooling & Containment Heat Removal Pumps ML17354A9891998-06-12012 June 1998 Forwards Corrected Page to follow-up Request for Addl Info Re Thermo-Lag 330-1 Fire Barriers ML17354A9771998-05-28028 May 1998 Forwards Copy of Revised NRC Form 398 (10-1997),personal Qualification Statement Licensee.Effective Immediately,All Applications for New Licensees or License Renewals Are to Be Submitted on Revised Form.W/O Encl ML17354A9551998-05-21021 May 1998 Forwards for Info Synopsis of NRC OI Completed Rept Re Failure to Control Contaminated Component Cooling Water Heat Exchanger Tubes IR 05000250/19980051998-05-18018 May 1998 Forwards Insp Repts 50-250/98-05 & 50-251/98-04 on 980308-0418.No Violations Noted ML17229A7161998-05-0404 May 1998 Ack Receipt of Petitions Dtd 980226,27 & 0306 & Suppl Petitions of 980315,17,29,30 & 0404 Filed on Behalf of Recipient & National Litigation Consultants.Petitions Request Numerous Action Be Taken Re FPL Facilities ML17354A9101998-04-23023 April 1998 Discusses Completion of Licensing Action for NRC Bulletin 96-002, Movement of Heavy Loads Over Sf,Over Fuel in Reactor Core,Or Over Safety-Related Equipment, for Plant ML17354A8921998-04-14014 April 1998 Discusses Request for Info Re Impact of Commercial Airport at Homestead Air Force Base Site on Safety at Plant,Units 3 & 4 ML17354A8871998-04-0101 April 1998 Forwards Insp Repts 50-250/98-03 & 50-251/98-03 on 980302-06.No Violations Noted.Insp Consisted of Selective Exam of Procedures & Representative Records,Interviews W/Personnel & Observation of Activities in Progress ML17354A8701998-03-26026 March 1998 Forwards Insp Repts 50-250/98-02 & 50-251/98-02 on 980125- 0307.No Violations Noted ML17354A8461998-03-23023 March 1998 Requests Addl Info to Complete Review of Util Request Re Exemption from Requirements of Section III.G.2.a of App R to 10CFR50 for Raceway Fire Barriers in Turbine Bldg ML17354A8341998-03-0909 March 1998 Forwards Exam Repts 50-250/98-300 & 50-251/98-300 on 980227. NRC Administered JPM re-take Exam to One Employee Who re-applied for License to Operate Plant.Candidate Performance on JPM re-take Exam Satisfactory ML17354A8221998-03-0909 March 1998 Confirms Telcon Between O Hanek & Rudisail on 980304,re Self Assessment of Performance Presentation Which Has Been Scheduled for 980512 ML17354A8211998-03-0303 March 1998 Refers to Training Managers Conference Conducted at Atlanta Federal Ctr on 971112 & 13 & Exam Workshop Conducted at RB Russell Bldg on 980127-29.Agenda,list of Attendees,Slides, Exam Schedules for FY97 & 98 & Concerns IR 05000250/19970121998-02-24024 February 1998 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-250/97-12 & 50-251/97-12 on 980109.Evaluated Response & Finds Response Meets Requirements of 10CFR2.201 1999-09-28 |
See also: IR 05000250/1981025
Text
~
oQ
~
'V
)/e/l~w
NOV 2 7 198)
Florida Power
and Light Company
ATTN:
Dr.
R.
E. Uhrig, Vice President
Advanced
Systems
and Technology
P. 0.
Box 529100
Miami, FL. 33152
Gentlemen:
Subject:
Report Nos.
50-
-2
and 50-251/81-25
This refers
to the routine safety inspection
conducted
by tir.
R. Vogt-Lowell of
this office on September
26 - October 25,
1981, of activities authorized
by
NRC
Operating
License
Nos.
DPR-31 and
DPR-41 for the Turkey Point facility.
Our
preliminary findings were discussed
with Hr. J.
K. Hays, Plant tanager,
at the
conclusion of the inspection.
Areas
examined during the inspection
and our findings are discussed
in the
enclosed
inspection report.
Within these
areas,
the inspection consisted of
selective
examinations
of procedures
and representative
records,
interviews with
personnel,
and observations
by the inspector.
During the inspection, it was found that certain activities under your license
appear
to violate
NRC requirements.
This item and references
to pertinent
requirements
are listed in the Notice of Violation enclosed
herewith
as
Appendix A.
Elements
to
be included in your response
are delineated
in
Appendix A.
Two new unresolved
items were identified in the enclosed
inspection report.
The
items will be examined during subsequent
inspections.
In accordance
with 10 CFR 2.790(a),
a copy of this letter and the enclosure will
be placed
in the
NRC's Public Document
Room unless
you notify this office, by
telephone,
within ten days of the date of this letter and submit written
application to withhold information contained therein within thirty days of the
date of this letter.
Such application must
be consistent
with the requirements
of 2.790(b)(1).
Should you
have
any questions
concerning this letter,
we will be glad to discuss
them with you.
Sincerely,
Enclosures:
(See
Page
2)
8202050l24
820120
PDR,AOOCZ OSOOO250
~- '.'9-
',,,
Paul J. Kellogg, Chief
Reactor Project
Branch
2
Division of Resident
and
Reactor Project Inspection
P
I
!
W
I
~
~
Florida Power
and Light Company
HOV 2 7 iS8l
Enclosures:
l.
Appendix A, Notice of Violation
2.
Inspection
Report
Nos. 50-250/81-25
and 50-251/81-25
cc w/encl:
H.
E. Yaeger, Site tanager
bcc w/encl:
NRC Resident Inspector
Document
t1anagement
Branch
State of Florida
RI I
RII
RVL (ell:dt
KL nd
s
11/
/81
11/~Q /81
RII~
HCDance
11/w'L /81
RII
PJK
1 ogg
11/ pi/81
II
~
I
J
I