ML17341A839
| ML17341A839 | |
| Person / Time | |
|---|---|
| Site: | Turkey Point |
| Issue date: | 11/24/1981 |
| From: | Kellogg P NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Robert E. Uhrig FLORIDA POWER & LIGHT CO. |
| Shared Package | |
| ML17341A836 | List: |
| References | |
| NUDOCS 8201270676 | |
| Download: ML17341A839 (4) | |
See also: IR 05000250/1981021
Text
NOV 2 4 1981
Florida Power and Light Company
ATTN:
Dr.
R.
E. Uhrig, Vice President
Advanced Systems
and Technology
P. 0. Box 529100
Miami, FL
33152
Gentlemen:
Subject:
Report Nos. 50-250/81-21
and 50-251/81-21
This refers to the routine safety inspection
conducted
by Mr. L. A. Franklin of
this office
on October
13-16,
1981,
of activities authorized
by
NRC Operating
License
Nos.
and
DPR-41 for the Turkey Point facility.
Our preliminary
findings were'iscussed
with Mr. J.
K. Hays,
Plant
Manager-Nuclear,
at
the
conclusion of the inspection.
Areas
examined
during
the
inspection
and
our findings
are
discussed
in the
enclosed
inspection
report.
Within these
areas,
the inspection
consisted of-
selective
examinations
of procedures
and representative
records,
interviews with
personnel,
and observations
by the inspector.
During the inspection, it was
found that certain activities under your license
appear
to violate
NRC requirements.
This
item
and
references
to pertinent
requirements
are listed in the Notice of Violation enclosed
herewith
as Appen-
dix A.
Elements to be included in your response
are delineated
in Appendix A.
I
We have
examined
actions
you
have
taken with regard
to previously identified
enforcement matters.
These are discussed
in the enclosed inspection report.
In accordance
with
a copy of this letter and the enclosure(s)
will be placed
in the
NRC's Public Document
Room unless
you notify this office,
by telephone,
within ten
days of the date of this letter
and
submit written
application to withhold information contained therein within thirty days of the
date
of this letter.
Such application
must be consistent with the requirements
of 2.790(b)(1).
Should you have
any questions
concerning this letter,
we will be glad to discuss
them with you.
Sincerely,
Paul J. Kellogg, Chief
Reactor Projects
Branch
2
Division of Resident
and
Reactor Project Inspection
Enclosures:
See
Page
2
820i270676 820ii2
ADOCK 05000250
.G
'P
Florida Power and Light Company
'Enclosures:
l.
Appendix A, Notice of Violation
2.
Inspection Report Nos. 50-250/81-21
and 50-251/81-21
cc w/encl:
H. E. Yeager, Site Manager
bcc w/encl:
NRC Resident Inspector
Document Management
Branch
State of Florida
NOV 24 198l
RII
g
I
LAFrank in:aw
II/rq/81
RII
CHosey
11//y/81
RII
Landis
11/
/81
RII
A
n
11/2. /81
RII
PJ
ogg
11 Zgl
1