ML17341A839

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Repts 50-250/81-21 & 50-251/81-21 on 811013-16 & Notice of Violation
ML17341A839
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 11/24/1981
From: Kellogg P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Robert E. Uhrig
FLORIDA POWER & LIGHT CO.
Shared Package
ML17341A836 List:
References
NUDOCS 8201270676
Download: ML17341A839 (4)


See also: IR 05000250/1981021

Text

NOV 2 4 1981

Florida Power and Light Company

ATTN:

Dr.

R.

E. Uhrig, Vice President

Advanced Systems

and Technology

P. 0. Box 529100

Miami, FL

33152

Gentlemen:

Subject:

Report Nos. 50-250/81-21

and 50-251/81-21

This refers to the routine safety inspection

conducted

by Mr. L. A. Franklin of

this office

on October

13-16,

1981,

of activities authorized

by

NRC Operating

License

Nos.

DPR-31

and

DPR-41 for the Turkey Point facility.

Our preliminary

findings were'iscussed

with Mr. J.

K. Hays,

Plant

Manager-Nuclear,

at

the

conclusion of the inspection.

Areas

examined

during

the

inspection

and

our findings

are

discussed

in the

enclosed

inspection

report.

Within these

areas,

the inspection

consisted of-

selective

examinations

of procedures

and representative

records,

interviews with

personnel,

and observations

by the inspector.

During the inspection, it was

found that certain activities under your license

appear

to violate

NRC requirements.

This

item

and

references

to pertinent

requirements

are listed in the Notice of Violation enclosed

herewith

as Appen-

dix A.

Elements to be included in your response

are delineated

in Appendix A.

I

We have

examined

actions

you

have

taken with regard

to previously identified

enforcement matters.

These are discussed

in the enclosed inspection report.

In accordance

with

10 CFR 2.790(a),

a copy of this letter and the enclosure(s)

will be placed

in the

NRC's Public Document

Room unless

you notify this office,

by telephone,

within ten

days of the date of this letter

and

submit written

application to withhold information contained therein within thirty days of the

date

of this letter.

Such application

must be consistent with the requirements

of 2.790(b)(1).

Should you have

any questions

concerning this letter,

we will be glad to discuss

them with you.

Sincerely,

Paul J. Kellogg, Chief

Reactor Projects

Branch

2

Division of Resident

and

Reactor Project Inspection

Enclosures:

See

Page

2

820i270676 820ii2

PDR

ADOCK 05000250

.G

PDR

'P

Florida Power and Light Company

'Enclosures:

l.

Appendix A, Notice of Violation

2.

Inspection Report Nos. 50-250/81-21

and 50-251/81-21

cc w/encl:

H. E. Yeager, Site Manager

bcc w/encl:

NRC Resident Inspector

Document Management

Branch

State of Florida

NOV 24 198l

RII

g

I

LAFrank in:aw

II/rq/81

RII

CHosey

11//y/81

RII

Landis

11/

/81

RII

A

n

11/2. /81

RII

PJ

ogg

11 Zgl

1