Forwards IE Insp Repts 50-250/81-27 & 50-251/81-27 on 811111-13.No Noncompliance Noted
ML17341A751
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 12/01/1981
From: Kellogg P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Robert E. Uhrig
FLORIDA POWER & LIGHT CO.
Shared Package
ML17341A752 List:
References
NUDOCS 8112230325
Download: ML17341A751 (4)


See also: IR 05000250/1981027

Text

@kS~~. cow

DEC - 1

ICOSI

Florida Power

and Light Company

ATTN:

Dr.

R.

E. Uhrig, Vice President

'dvanced

Systems

and Technology

P. 0. Box 529100

Miami, FL

33152

RECPI@E>

SQ

DEt. P8 1981@

N h'Qg) pffft~

~+@

Naggy'O

4R

Gentlemen:

Subject:

Report Nos. 50-250/81-27

and 50-251/81-27

This refers

to

the

routine

safety

inspection

conducted

by Mr.

W.

P.

Ang of

this office

on

November 11-13,

1981,

of activities authorized

by

NRC License

Nos.

OPR-31 and DPR-41 for the Turkey Point facility and to the discussion

of our

findings

held with Mr. H.

E. Yaeger,

Site

Manager,

at the conclusion

of the

inspection.

Areas

examined

during

the

inspection

and

our findings

are

discussed

in the

enclosed

inspection

report.

Within these

areas,

the inspection

consisted

of

selective

examinations of procedures

and representative

records,

interviews with

personnel,

and observations

by the inspector.

Within the scope of this inspection,

no violations or deviations were disclosed.

We

have

examined

actions

you

have

taken with regard

to previously identified

enforcement matters

and unresolved

i,tems.

The status of these

items is discussed

in the enclosed report.

In accordance

with

10 CFR 2.790(a),

a copy of this letter and the enclosure( s)

will be placed in the

NRC'

Public Document

Room unless

you notify this office,

by telephone,

within ten

days of the date of this letter

and

submit written

application to withhold information contained therein within thirty days of the

date of this letter.

Such application

must

be consistent

with the requirements

of 2.790(b)(1).

Should you have

any questions

concerning this letter,

we will be glad to discuss

them with you.

Sincerely,

Paul J. Kellogg, Chief

Reactor Projects

Branch 2

Division of Resident

and

Reactor Project Inspection

Bii2230325 8ii20i

PDR

ADOCK 05000250

)

6

PDRg

XEc)( s/

k4.

4

/ij

,)

Florida Power and Light Company

DEC -1 1981

Enclosure:

Inspection Report Nos.

50-250/81-27

and 50-251/81-27

cc w/encl:

H. E. Yaeger, Site Manager

bcc w/encl:

NRC Resident Inspector

Document Management

Branch

State of Florida

RII

p/P

MPAng

11/3o/81

RII ~

ARHerdt

11/y /81

RI I

g CEMurphy

11/g/81

RI ++1

KLandis

. 11/

( I/81

RI I (+P

PJKel 1 ogg

11/ t//81

g Lr/