Forwards IE Insp Repts 50-250/81-18 & 50-251/81-18 on 810726-0825.No Noncompliance Noted
ML17341A577
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 09/18/1981
From: Robert Lewis
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Robert E. Uhrig
FLORIDA POWER & LIGHT CO.
Shared Package
ML17341A578 List:
References
NUDOCS 8110160533
Download: ML17341A577 (4)


See also: IR 05000250/1981018

Text

SEP

1

8 f98'I

Florida Power

and Light Company

ATTN:

Dr.

R.

E. Uhrig, Vice President

Advanced

Systems

and Technology

P. 0.

Box 529100

gg CO~

Miami, FL

33152

~sQ,>~

Gentlemen:

Subject:

Report

Nos

50-250/81-18

nd 50-251/81-18

This refers

to the routine safety inspection

conducted

by Mr.

R. J. Vogt-Lowell

of this office on July 26 - August 25, 1981, of activities authorized

by

NRC

Operating

License

Nos.

DPR-31 and

DPR-41 for the Turkey Point Units

3 and

4

facility and to the discussion

of our findings held with D.

W. Haase,

Technical

Department Supervisor, at the conclusion of the inspection.

Areas

examined during the inspection

and our findings are discussed

in the

enclosed

inspection report.

Within these

areas,

the inspection

consisted of

selective

examinations

of procedures

and representative

records,

interviews with

personnel,

and observations

by the inspectors.

Within the

scope of this inspection,

no violations or deviations

were disclosed.

We have examined actions

you

have

taken with regard to previously identified

enforcement matters.

These

are discussed

in the enclosed

inspection report.

In accordance

with 10 CFR 2.790 of the Commission's

regulations,

a copy of this

letter and the enclosed

report will be placed

in the

NRC's Public Document

Room.

If the report contains

any information that you believe to be exempt

from

disclosure

under

10 CFR 9.5(a)(4), it is necessary

that you:

(a) notify this

office by telephone within ten days

from the date of this letter of your

intention to file a request for withholding; and (b) submit'ithin twenty-five

days

from the date of this letter

a written application to this office to

withhold such information. If your receipt of this letter

has

been

delayed

such

that less

than

seven

days are available for your review, please notify this

office promptly so that

a

new due date

may be established.

Consistent with

section 2.790(b)(1),

such application must

be accompanied

by an affidavit

executed

by the

owner of the information which identifies the document or part

thereof sought to

be withheld, and

a full statement

of the reasons

on the basis

of which it is claimed that the information should

be withheld from public

disclosure.

This section further requires

the statement

to address

with

specificity the considerations

listed in 10 CFR 2.790(b)(4).

The information

sought to

be withheld shall

be incorporated

as far as possible into a separate

part of the affidavit. If we do not hear

from you in this regard within the

specified periods

noted above,

the report will be placed in the Public Document

Room.

~~o>

5

l

i 8110160S33

810918

'

PDR

ADOCK 05000280

i

PD~R

s

I, E

s

~ $

I)

L I', lj

II

4J'd

'

-

~

~ '

-

I

SEP

1 8 l981

Florida Power and Light Company

Should you

have

any questions

concerning this letter,

we will be glad to discuss

them with you.

Sincerely,

R.

C. Lewis, Director

Division of Resident

and

Reactor Project Inspection

Enclosures:

Inspection

Report

Nos. 50-250/81-18

and 50-251/81-18

cc w/encl:

H.

E. Yeager, Site tanager

bcc w/encl:

NRC Resident

Inspector

Document

Hanagement

Branch

State of Florida

R

o (el 1:dt

9/

/81

Si~~~

RII

HCOPnce

9/tg /81

RI~I

KLand s

9/(7/81

RII

RCL

1

9/

/8

If

t