8 f98'I
Florida Power
and Light Company
ATTN:
Dr.
R.
E. Uhrig, Vice President
Advanced
Systems
and Technology
P. 0.
Box 529100
gg CO~
Miami, FL
33152
~sQ,>~
Gentlemen:
Subject:
Report
Nos
50-250/81-18
nd 50-251/81-18
This refers
to the routine safety inspection
conducted
by Mr.
R. J. Vogt-Lowell
of this office on July 26 - August 25, 1981, of activities authorized
by
NRC
Operating
License
Nos.
DPR-31 and
DPR-41 for the Turkey Point Units
3 and
4
facility and to the discussion
of our findings held with D.
W. Haase,
Technical
Department Supervisor, at the conclusion of the inspection.
Areas
examined during the inspection
and our findings are discussed
in the
enclosed
inspection report.
Within these
areas,
the inspection
consisted of
selective
examinations
of procedures
and representative
records,
interviews with
personnel,
and observations
by the inspectors.
Within the
scope of this inspection,
no violations or deviations
were disclosed.
We have examined actions
you
have
taken with regard to previously identified
enforcement matters.
These
are discussed
in the enclosed
inspection report.
In accordance
with 10 CFR 2.790 of the Commission's
regulations,
a copy of this
letter and the enclosed
report will be placed
in the
NRC's Public Document
Room.
If the report contains
any information that you believe to be exempt
from
disclosure
under
10 CFR 9.5(a)(4), it is necessary
that you:
(a) notify this
office by telephone within ten days
from the date of this letter of your
intention to file a request for withholding; and (b) submit'ithin twenty-five
days
from the date of this letter
a written application to this office to
withhold such information. If your receipt of this letter
has
been
delayed
such
that less
than
seven
days are available for your review, please notify this
office promptly so that
a
new due date
may be established.
Consistent with
section 2.790(b)(1),
such application must
be accompanied
by an affidavit
executed
by the
owner of the information which identifies the document or part
thereof sought to
be withheld, and
a full statement
of the reasons
on the basis
of which it is claimed that the information should
be withheld from public
disclosure.
This section further requires
the statement
to address
with
specificity the considerations
listed in 10 CFR 2.790(b)(4).
The information
sought to
be withheld shall
be incorporated
as far as possible into a separate
part of the affidavit. If we do not hear
from you in this regard within the
specified periods
noted above,
the report will be placed in the Public Document
Room.
~~o>
5
l
i 8110160S33
810918
'
ADOCK 05000280
i
PD~R
s
I, E
s
~ $
I)
L I', lj
II
4J'd
'
-
~
~ '
-
I
1 8 l981
Florida Power and Light Company
Should you
have
any questions
concerning this letter,
we will be glad to discuss
them with you.
Sincerely,
R.
C. Lewis, Director
Division of Resident
and
Reactor Project Inspection
Enclosures:
Inspection
Report
Nos. 50-250/81-18
and 50-251/81-18
cc w/encl:
H.
E. Yeager, Site tanager
bcc w/encl:
NRC Resident
Inspector
Document
Hanagement
Branch
State of Florida
R
o (el 1:dt
9/
/81
Si~~~
RII
HCOPnce
9/tg /81
RI~I
KLand s
9/(7/81
RII
RCL
1
9/
/8
If
t