C1 Docket Hos. 50-250 and 50-251 Dr. Robert E. Uhrig, Vice President Advanced Systems and Technology Florida Power and Light Company Post Office Box 529100 Iliami, Florida 33152

Dear Dr. Uhrig:

e~ eW

~

ep I e

ep c

Qe

, j~

SEP

$g;e DISTRIBUTION Dockets NRC PDR L

PDR TERA NSIC ORB81 Rdg DEisenhut OELD IE-3 SVarga MGrotenhuis CParrish ACRS-10 Gray File PBenda TLoomis On Ilarch 10, 1981,(L-81-110) you submitted an amendment request for the Turkey Point Plant Unit Hos.

3 and 4.

The proposed amendment addresses the operabil ity and surveillance of the Overppessure tlitigating System.

In order to complete our review we find we need the additional information identified in tlie enclosure.

Sincerely,

.priginal signed b7:

S. A. varga Steven A. Varga, Chief Operating Reactors Branch 81 Division of Licensing

Enclosure:

As stated cc w/enclosure:

See next page ORB81 DL OR OFFICE/I SURNAME/

~

~

~ ~

HGrotenhui 9/I~/81 : ds DATE$

eoo ~ o/oge ~ ~ ee

~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~

81

~ ~ ~ ~ ~

~ ~ ~ oeooo ~ o ~

~

~ ~ ~ e ~

'DR """'"-'"'"'""

NRG FORM 318 (10-80) NRCM 0240 OFFICIAL RECORD COPY USG PO: 1981~5-060

0 V

I, lh r, ~

L I'

Robert. E. Uhrig Florida Power and Light Company CC:

Nr. Robert Lowenstein, Esquire Lowenstein,

Newman, Reis and Axelrad 1025 Connecticut, Avenue, N.M.

Suite 1214 Mashington, D. C.

20036 Environmental and Urban Affairs Library Florida International University Miami, Florida 33199 Nr. Norman A. Coll, Esquire

Steel, Hector and Davis 1400 Southeast First llational Bank Building Ni ami, Fl orida 33131 llr. Henry Yaeger, Plant Nanager Turkey Point Plant Florida Power and Light Company P. 0.

Box 013100 Miami, Florida 33101 Nr. Jack Shreve Office of the Public Counsel Room 4, Holland Building Tallahassee, Florida 32304 Administrator Department of Environmental Regulation Power Plant Siting Section State of Florida 2600 Blair Stone Road Tallahassee, Florida 32301 Resident Inspector Turkey Point nuclear Generating Station U.

S. Huclear Regulatory Commission Post Office Box 1207 Homestead, Florida 33030

e Sea S'aw '

  • a W
  • -'Sw...

V z OamW 'W sm i ZWXwe' m aWcaeara~~

"x m ~ s a+a

-c c ENCLOSURE RE(VEST FOR ADDITIONAL INFORMATION TURKEY POINT 3 5 4 1.

For what specific reason or reasons are you redefining the REACTOR COOLANT SYSTEM PRESSURE BOUNDRY INTEGRITY?

2.

Explain why the RCS temperature of 380'F is used to isolate the high head SI pumps by closing MOV-843A, MOV-843B and MOV-869.

3.

Explain why the RCS temperature of 275'F is used to initiate the pressurizer power operated relief valves at the low setpoint range.

The March 14, 1980 SER required the low setpoint range to be initiated at an RCS temperature of 300'F.

4.

Are there any flow lines connecting between h10V's 866B, 866A and valve 869 that 'are not indicated on P&ID's that could cause an overpressurization event?

5.

l!hat is the purpose of the two flow lines (one from the accumulator test

line, and one to accumulator makeup header) between MOV's 866B, 866A and 869?

6.

Provide diagrams which point out the OMS pressurizer relief valves and the pressurizer relief valve isolation valves.

7.

Please investigate the apparent

omission, in proposed Section 3.15, of a bases for OPM operations when RCS temperatures are at or below 380'F.

(See proposed Technical Specification 3.15.1).

Correct the proposed bases and/or the proposed Technical Specifications as appropriate.