Docket Nos. 50-250 and 50-251 Control of Combustib',es involves',

among other things, the installation of emergency diesel tank isolation valves.

Delivery of these valves was expected on June 9,

1981 and completion was then expected on August 2, 1981.

Due to, continuing procurement problems only two of the four required valves have been delivered.

The delivery date of the remaining two valves has slipped to September 1, 1981, and the completion date has accordingly slipped to November 1, 1981.

Adequate interim protection is provided as described in the Fire Protection Report dated February 25, 1977 Section 8.5.3.13.

In addition, frequent patrols by guard force and operations personnel would detect any off-normal condition of the type requiring the modifications.

Based on our review, we conclude that you have shown good cause for extending the completion date of the item listed and that the public health and safety is not adversely affected by the extension requested.

Accordingly, pursuant to 10 CFR 50.48(d) the completion date for the item listed is extended as requested.

DISTRIBUTION NRC PDR Local PDR

" (p 4 t983 ORB 1 File OELD OI8E (5)

G.

Deegan (8)

Dr. Robert E. Uhrig, Vioe President J.

Wetmore Advanced Systems and Technology G. Harrison Florida Power and Light Company R.

Ferguson

~

I

'1>'ost Office Box 529100 ACRS (10)

Miami, Florida 33152 OPA (Clare Hiles)

R.

Diggs

Dear Dr. Uhrig:

NSIC TERA

SUBJECT:

FIRE PROTECTION - TURKEY POINT

Chairman, ASLAB B. Scharf (10)

We have completed our review of your letter dated July 28, 1981, which requested extension of the completion date on, the final modification to the fire protection system at Turkey Point as outlined in our Safety Evaluation Report dated f<arch 21, 1979 (SER)>

SER No. '3.1.15 '(<ontrol of Combustibles OFFICES SUANAME/

I 8109300196 8

OA fP9QP t ~ o ~ ooo ~

PDR ADOCK 05000000

'ccocoo.

F gr oag

~ o ~ ~

~ ~ o ~ ~

~ ~ ~ ~

~ ~

OFFICjAL RECORD CopY USGPO: 1981~oooo

ls c

't

  • ~

I

~P Dr. Robert E. Uhrig H P H

t98I A copy of the related Notice of Extension, which is being forwarded to the Office of the Federal Register for publication, is enclosed.

Sincerely, 8@old "R. 'Denton

Enclosure:

Notice of Extension Harold R. Denton, Director Office of Nuclear. Reactor Regulation cc w/enclosure:

See next page ORB 1

OFFICEO SURNAME/

~I ~ ~ ~ ~I~I ~ ~

~I~I~ ~ ~ ~ ~ ~ I 8/ L'I//81 OATE P MGrot nh is/

~

~ ~ ~I

~

~

~I~I

~ ~

ski%a

~ 0 ~IHI~I~00010000000 ~

8//3/81

~ ~ ~ %0 ~ ~I~ ~I~I~I~I~I

~I

~ 00 ~I~I ~I ~ ~

81

~

~ ~

~ 0 ~I ~I~I~I~I

~

aK

~ ~ ~ ~

I~

~ ~I ~I~I~I~I~ ~

8/

/81

~ ~ ~\\ ~ ~

~

~ 0 ~ 0 ~ 0 ~ 0 ~ 0 ~ 0 ~ 0 D;DL

~I~ I ~ 00 IooI~I

~I

~I~ ~

DE>s

~I~ ~I~ ~ ~I

~I

~I 81 D'99%

~ ~off)

I~I ~ 000

~I alon Q/

/81

~ ~ ~ Coooo 000000000000000

~1"e-5 MV

~I~ 10 ~I~I~IHI~

~ I~I~

(( P~~(~ I

~I~ OHO ~I~I~ ~ 0 ~ 00 ~I~I~00

<)1g-t~i

~I~ ooool0000000000000000 NRC FOf3M 358 (50-80) NRCM 0240 OFFICIAI RECORD COPY USGPO: 15585~%0

4I

'L

~

~

Robert E. Uhrig Florida Power and Light Company cc:

Hr. Pobert Lowenstein, Esquire Lo~ienstein,

Newman, Reis and Axelrad 1025 Connecticut Avenue, H.W.

Suite 1214 Washington, D. C.

20036 Environmental 'and Urban Affairs Library

. Florida International University t'miami, Florida 33199 I'ir. Horman A. Coll, Esquire

Steel, Hector and Davis 1400 Southeast First Hational Bank Building hiami, Florida 33131 h1r; Henry Yaeger, Plant lianager Turkey Point Plant Florida Power and,Light Company P. 0.

Box 013100 Niami, Florida 33101 Honorable Dewey Knight County hanager of tfetropolitan Dade County 4i ami, Fl orida 33130 Bureau of Intergovernmental Relations 560 Apal achee Parkway

'al 1 ahassee, Fl ori da 32304 Resident Inspec or Turkey Point Huclear Generating Station U.

S. Huclear Regulatory Commission Post Office Box 1207

'-'omestead, Florida 33030

'egional Radiation Pepresentative EPA* Region IV 345 Courtland Street, H.W.

Atlanta, Georgia 30308 l1r. Jack Shreve Office of the Public Counsel Room 4, Holland Building Tallahassee; Florida 32304 Administrator Department of Environmental Regulation Power Plant Siting Section State of Florida 2600 Blair Stone Road Tallahassee, Florida 32301

V