ML17341A181

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Repts 50-250/81-06 & 50-251/81-06 on 810317-20 & Notice of Violation
ML17341A181
Person / Time
Site: Turkey Point  
Issue date: 04/20/1981
From: Robert Lewis
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Robert E. Uhrig
FLORIDA POWER & LIGHT CO.
Shared Package
ML17340B316 List:
References
NUDOCS 8106100169
Download: ML17341A181 (4)


See also: IR 05000250/1981006

Text

UNITEDSTATES

NUCLEAR REGULATORY COMMISSION

REGION I I

101 MARIETTAST., N.W., SUITE 3100

ATLANTA,GEORGIA 30303

APR 2p ~)

1,P,R RfOIj,

c>

Florida Power and Light Company

ATTN:

R.

E. Uhrig, Vice President

Advanced Systems

and Technology

P. 0. Box 529100

Miami, FL

33152

Gentlemen:

Subject:

Report Nos

~ 50-250/81-6

and 50-251/81-6

This refers to the routine inspection

conducted

by

D.

M. Montgomery of this

office on March 17-20,

1981, of activities authorized

by

NRC Operating

License

Nos,

DPR-31

and

DPR-41 for the Turkey Point facility.

Our preliminary findings

were discussed with J.

E. Moore at the conclusion of the inspection.

Areas

examined

during

the

inspection

and

our findings

are

discussed

in the

enclosed

inspection

report.

Within these

areas,

the

inspection

consisted

of

selective

examinations of procedures

and representative

records,

interviews with

personnel,

and observations

by the inspector.

The

Region II Mobile Laboratory

was also brought to your site

and used

by the inspector to make certain in4ipen-

dent measurements.

The basic

purpose

of these

independent

measurements

is to

verify your capability for analyzing radioactive effluents,

and to achieve

and

t

maintain comparable

methods of analyses

between your facility and the

NRC.

The

complete data

from these

measurements

will be reported in a subsequent

Inspection

Report.

During the inspection, it. was found that certain activities

under your license

appear

to violate

NRC requirements.

These

items

and references

to pertinent

requirements

are

listed

in

the

Notice of Violation enclosed

herewith

as

Appendix A.

Elements

to

be

included

in your

response

are

delineated

in

Appendix A.

P

One

new unresolved

item is identified in the enclosed

inspection

report.

This

item will be examined during subsequent

inspections.

In accordance

with Section

2.790 of the

NRC "Rules of Practice,"

Part 2, Title

10,

Code of Federal

Regulations,

a copy of this letter and the enclosed

inspec-

tion report will be placed

in the

NRC Public

Document

Room. If this report

contains

any information that you believe to be proprietary, it is necessary

that

you

make

a written application within 20 days to this office to withhold such

information from public disclosure.

Any such application

must include the basis

for claiming that the information is proprietary

and the proprietary information

should

be contained in a. separate

part of the document.

If we do not hear from

you in this regard within the specified period,

the report will be placed in the

Public Document

Room.

~

~

~

E

!

I

l'

2

Florida Power and Light Company

APR 3p ~)

~

y

4'hould

you have

any questions

concerning this letter,

we will be glad..to"discuss

them with you.

Sincerely,

Enclosures:

1.

Appendix A, Notice of Violation

2.

Inspection Report Nos-. 50-250/81-6

and 50-251/81-6

E.c.

R. C.

L

i s, Acting'Director

Division of Resident

and

Reactor Project Inspection

cc w/encl:

H. E.'Yaeger,

Plant Manager

L

~

~