ML17340B048

From kanterella
Jump to navigation Jump to search
Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in IE Waste Packaging Insp Repts 15000039/80-23,50-250/80-37 & 50-251/80-35
ML17340B048
Person / Time
Site: 02700047, Turkey Point
Issue date: 04/15/1981
From: Robert Lewis
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Robert E. Uhrig
FLORIDA POWER & LIGHT CO.
Shared Package
ML17340B049 List:
References
NUDOCS 8104230911
Download: ML17340B048 (3)


See also: IR 015000039/1980023

Text

UNITEDSTATES

NUCLEAR REGULATORYCOMMISSION

REGION II

101 MARIETTAST., N.W., SuITE 3100

ATLANTA,GEORGIA 30303

C

I

Cl

C

O

I<<I

7 ++*++

APR 15 188I

~Sf/Pp <

c

co~>~

I~

19

Isse'410~

Florida Power and Light Company

ATTN:

R. E. Uhrig, Vice President

Advanced Systems

and Technology

P. 0. Box 529100

Miami, FL

33152

Gentlemen:

Subject:

Report Nos.

/80-

,

- 51/80-3

and 15000039/80-23

Thank you for your letter of March 27,

1981; informing us of steps

you have taken

to correct

the

noncompliance

concerning activities

under

NRC Operating

License

Nos.

DPR-31

and

DPR-41 brought to your attention in our letter of March 2,

1981.

We

have

examined your corrective actions

and have

no further questions at this

time.

We have reviewed your response

to our findings

and your disagreement

with the

assigned

Severity

Level III classification;

Your position that

the

closed

transport

vehicle

was

the

container

and

thus

the

punctured

drums

did

not

represent

a breach

of container integrity is inconsistent

with your shipment

records,

which clearly indicate

the individual

drums

were

the

intended

con-

'tainers.

The

shipment of punctured -drums is evidence

that your controls for

assuring

compliance with the requirements for 49 CFR 173.392 were not adequate.

In view of the above,

we continue to regard the punctured

drums in your shipment

No.80-082 as

a Severity Level III violation as cited in our Notice of Violation

dated March 2, 1981.

We appreciate

your cooperation with us.

Since ely,

. C. Lewi

, Acting Director

~

~

Division of Resident

and

Reactor Project Inspection

cc:

H. E. Yaeger, Plant Manager

j

s

~

1

ag

p

(

/ A

~,l~

FLORIDA POWER d LIGHTCOMPANY

March 27,

1981

L-81-130

Mr. James

P. O'Reilly, Director, Region II

Office of Inspection

and Enforcement

U. S. Nuclear Regulatory

Commission

101 Marietta Street; Suite

3100

Atlanta, Georgia

30303

Dear Mr. O'Reilly:

Re:

RII:

50-250/80-37

50-251/80-35

Florida Power

8 Light Company

has

reviewed the subject inspection report

and

a

response

is attached;

There is no proprietary information in the report.

Ver

your ,

Robert E. Uhrig

Vice President

Advanced

Systems

8, Technology

REU/JEM/ras

Attachment

cc:

Harold F. Reis,

Esquire

~J

PEOPI.E

SERVING PEOPLE

~

i

f