Approves Util 810213 Request for Extension of Completion Dates for Four Fire Protection Sys Mods Per 790321 Ser.Fr Notice Encl
ML17340A820
Person / Time
Site: Turkey Point  
Issue date: 02/13/1981
From: Harold Denton
Office of Nuclear Reactor Regulation
To: Robert E. Uhrig
FLORIDA POWER & LIGHT CO.
Shared Package
ML17340A821 List:
References
NUDOCS 8103120765
Download: ML17340A820 (12)


Text

Docket Nos.

- 5 d 50 1.

SER No. 3.1.6 Mater Suppression 2.

SER No. 3.1.9 Fire Doors 3.

SER No. 3.1.13 Curbs 4.

SER No. 3.1.15 Control of Combustibles Item 1 involves a 'labyrinth-door combination to protect the switch gear rooms.

This was a change fn the original modification proposed 'by,'letter dated October 20, 1980.

Me approved this change on January 26, 1981.

The'abyrinth work will be completed on February 25, 1981, Delivery. ~

of the doors fs expected on March 20, 1981.

Installat'fons of the doers fs targeted for comp'letfon on March 30, 1981.

The doors were recognized to be 1ong-lead procuremIent items and you proposed a interim solution of Harfnfte board on existing doors whfch was accepted by the staff.

In addition, an off normal condition such as a.fire would be annunciated fn the control room, and the Nuclear Turbine Operator.'nspects the area fn the course of shfft surveillance.

Item 2 involves the fnstql< ation of seventeen fire doors.=-Two. of the doors are installed and give are hung hgt~eot completed.

pA11 doors are'xpected to be fnstalled-.hy,'Hay 4, 1981':>

'fhe delay fs duj',to;procurement, of the doors and assocf'ated hardware.

Adequate -interim protection fs provided by an early warning fire. detectfon system-with annuncfators fn the control room and: by frequent patrols by operators and guard force:

personnel.

g / p $.i 20 7 C. 5

/$

Ql DISTRIBUTION:

~.'ocket'., Ff'Ie 50-280/281 CPar.rfsh NRC PDR Gray. Ffle L PDR:

ACRS,(,1 6).

TERA NSIC'Efsenhut

/

RP.ur pl e Dr. Robert~E. Uhrfg, Vice President Advan'ced Systems and Technology

.Florida Power and Light Company Post Offfce -Box 529100 Miami, Florida 33152 ISR (3)

Dear Or. Uhrfg:

SVarga MGrotengufs

SUBJECT:

FIRE PROTECTION - TURKEY POINT Me have completed our review of your letter dated February'l9', 1981, which requested extentfon of completion dates on four modfffcatfons to the fire protection system at Turkey Point as outlined fn our Safety:Evaluation Report dated March 2'l. 1979 {SER).

OFFICE)

SURNAME/

DATEP NRC FORM.318 (10/80) NRCM 0240 I

~

~ ~

~ ~

~

~ ~

~ ~ ~ ~ ~ ~ ~

OFFICIAL'RECGRD COPY

  • USGPOI 1980~29 824

~t II t

4 r,

a,

A Item 3 involves the installation of curbs for the doors in item 2.

The curbs are complete except for five;curbs which must follow the installation of doors in item 2.'hese curbs are expected to be com-pleted by April 8, 1981.

Adequate interim protection is provided as described in item 2 above.

'I Item 4 involves, among other things, the installation of emergency diesel tank isolation valves.

Delivery of these valves is expected on June 9, 1981 and completion is then expected on August 2, 1981.

Ade-quate'nterim protection is provided as described in the Fire Protection Report dated February 25, 1977 section 8.5.3.13.

Based on our.review, we conclude that you have shown good cause for extending the completion dated of the four items listed and that the public health and safety is not adversely affected by the extensions requested.

Accordingly, pursuant to 10 CFR 50.48(d) the dated for the four items listed are extended as requested.

A copy of the related Notice of Extension, which is being forwarded to the Office of the Federal Register for publication, is enclosed.

Sincerely, Steven A. Yarga, Chief Operating Reactors Branch 81 Division of Licensing

Enclosure:

Notice of Extension cc:

w/enclosure See next page OFF1CE)

SURNAME)

OATEP

.. BQB81.: DL..

"NGrotenhui

..2/... /81..".

V'~

~ TWamba ch".

.Z/.t3r.81..;.

..ORBJQ:ZL....

"SYarga c4s"

..2/..../Bl, MQRDL......

3:Navel;.......

~

0 D14lLOII~ ~

~

~

~ OV ~ ~lb'

~ ~ ~ ~ ~ ~ ~ ~

~

~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 0

~ 0 ~ ~

DEisenhut HDenton

~ $2l""/81""" 2/" gBl..............2/.../81........................

NRC FORM 318 <10/801 NRCIUI 0240 OFFICIAL RECORD COPY

+ VSGPO; 198~29.824

c,

$ 1/ C c., i.

ll

gpS Rfgy

~c+

0 4

Yt~

Q>>

0%

+*ww+

Docket Nos.

50-250 and 50-251 UNITED STATES NUCLEAR REGULA'TORY COMMISSION WASHINGTON, D. C. 20555 February 13, 1981 Dr. Robert E. Uhrig, Vice President Advanced Systems and Technology Floi ida Power and Light Company Post Office Box 529100 Miami, Florida 33152 Dear Dr.

Uhr ig:

SUBJECT:

FI'RE PROTECTION - TURKEY POINT We have.completed our review of your letter dated February 13, 1981, which requested extension of completion'ates on four modifications to the fire protection system at Turkey Point as outlined in our Safety Evaluation Report dated March 21; 1979 (SER).

1. 'ER No. 3.1.6 Water Suppression 2.

SER No. 3.1.9 Fire Doors 3,

SER No. 3.1.13 Curbs 4.

SER No. 3.1.15 Control of Combustibles I.em 1 involves a labyrinth-door combination to protect the switch gear rooms.

This was a change in the original modification proposed by letter dated October 20, 1980.

We approved this change on January 26, 1981.

The labyrinth work will be completed on February 25, 1981, Delivery of the doors is expected on March 20, 1981.

Installations of the doors is targeted. for completion on March 30, 1981.

The doors were recognized to be long-.lead procurement items and you proposed an'nterim solution, i.e.

Marinite board on existing door s which was accepted by the staff.

In addi iion, an off -normal condition such as a fire would be annunciated in the control'oom, 'and the Nuclear Turbine Operator inspects the area in the course of shift surveillance.

Item 2 involves the installation of seventeen fire doors.

Two of the doors are installed and nine are hung but not completed.

All doors are expected to be installed by May 4, 1981.

The delay is.due to procurement of the doors and -associated hardware. 'dequate interim protection is

,provided by an early warning fire detection system with annunciators in the control room and by frequent patrols by operators and guard force personnel.

ii I

em 3 involves the installation of curbs for, the doors in item 2.

The curbs are complete except for five curbs which must follow the installation of doors in item 2.

These curbs are expected to be com-pleted by April 8, 1981.

Adequate interim protection is provided as described in item 2 above.

Item 4 involves, among other things, the installation of emergency-diesel tank isolation valves.

Oelivery of these valves is expected on June 9,

1981 and completion is then expected on August 2, 1981.

Ade-quate interim 'protection is provided as described in the Fire Protection Report dated February 25',

1977 section 8.5.3.13.

Based'n our review, we conclude that you have shown good cause for extending the completion dates of the four items listed and that the public health and safety is not adversely affected by the extensions requested.

Accordingly, pursuant to 10 CFR 50.48{d) the dates for the four items listed are extended as requested.

A copy of the related.Notice of Extension, which is being forwarded to the Office of the Federal Register for publication, is enclosed Si neer eely, o

E Haro1d R.

Dentdn, Director O,fice of Nuclear Reactor Regulation Encl.osur e:

Notice. of Extension.

cc:

w/enclosure See next page

ii

Robert E. Uhri g Florida Power and Light Company cc:

Nr. Robert Lowenstein, Esquire Lowenstein,

Newman, Reis and Axelrad 1025'onnecticut
Avenue, N.W.

Suite 1214 Washington, D.

C.

20036 Environmental and Urban Affairs Library Florida international University Miami, Florida 33199 Mr. Norman A. Coll, Esquire

Steel, Hector and Davis 1400 Southeast, First ilational Bank Building Miami, Florida 33131 Nr. Henry Yaeger, Plant Manager Turkey Point, Plant Florida Power and Light Company P. 0.

Box 013100 Miami, Florida 33101 Nr. Jack Shreve Office o<

tne Public Counsel Room 4, Holland Building Tallahassee, Florida 32304 Administrator

.Department of Environmental Regulation Power Plant Siting Section State of F.lorida 2600 Blair Stone Road Tallahassee, Flori "a 32301 Resident

!nspector Turkey Point Nuclear G nerating Station U. S. nuclear Regulatory Commission Post Of,ice Box 9712?7 guai I Heights Station Miami, Fl'orida 33197

ii I

?590-01 U. S. 'NUCLEAR REGULATORY COMMISSION DOCKET NOS.

50-250 50-251-FLORIDA POWER 5 LIGHT COMPANY NOTICE OF 'EXTENSION OF COMPLETION DATES By letter dated February 13,

1981, Florida Power

& Light Company (the licensee) requested that the U. S.

Nuclear Regulatory Commission (the Commission) grant an extension until August 2, 1981, for completion of modifications to the fire protection system at the Turkey Point Plant Unit Nos.

3 and 4 located in Dade County, Florida.

The Commission's Director of Nuclear Reactor Regulation has concluded that good cause has been shown and that such postponement will not adversely a feet the health anil'safety of the public.

Accordingly, pursuant to 10 CFR 50.48(d),

the request has been grarted.

For further details with respec.

-.o this action, see (1) the licensee's J

request dated February 13,

1981, and (2) the Director's letter to the licensee 1

dated February 13, 1981.

Da.ed at Bethesda, Maryland, this 13 day of February, 1.981.

FOR NUCLEAR REGUL Y COMMISSION Edson G.

Case, Deputy Director 0 fice of Nuclear Reactor Regulation