See also: IR 05000250/1980019
Text
~$l REPp
+0
~o
Cy
++*++
In Reply Refer To:
RII:WHM
50-250/80-19
50-251/80-20
UNITED STATES
NUCLEAR REGULATORY COMMISSION
REGION II
101 MARIETTAST., N.W., SUITE 3100
ATLANTA,G EORG IA30303
JUH2 7 1880
Florida Power and Light Company
ATTN:
R. E. Uhrig, Vice President
P. 0. Box 529100
Miami, FL
33152
Gentlemen:
Thhs refers to the inspection
conducted
by W. H. Miller, Jr., of this office on
June
4 through 6,
1980 of activities authorized
by
NRC Operating
License Nos.
and
DPR-41 for the Turkey Point facility, and to the discussion of our
findings held with J.
K. Hays at the conclusion of the inspection.
Areas
examined
during the
inspection
and
our findings
are
discussed
in the
enclosed
inspection
report.
Within these
areas,
the inspection
consisted
of
selective
examinations of procedures
and representative
records,
interviews with
personnel,
and observations
by the inspector.
t
One
new unresolved
item resulted
from this inspection
and is discussed
in the
enclosed report.
This item will be examined during subsequent
inspections.
During the inspection, it was
found that certain activities under your license
appear
to be in noncompliance
with NRC requirements.
This item and references
to pertinent requirements
are listed in the Notice of Violation enclosed herewith
as Appendix A.
This notice is sent to you pursuant
to the provisions of Section
2.201 of the NRC's "Rules of Practice," Part 2, Title 10, Code of Federal Regula-
tions.
Section
2.201 requires
you to submit to this office, within 20 days of
your receipt of this notice,
a written statement or explanation in reply including:
(1) corrective steps
which have been taken by you and the results
achieved;
(2)
corrective steps
which will be taken to avoid further noncompliance;
and (3) the
date when full compliance will be achieved.
During the inspection it was
found that certain activities under your license
appear to deviate from commitments to the Commission and have safety significance.
This item is identified in the Notice of Deviation enclosed herewith as Appendix B.
Please
provide us in writing within 20 days of your receipt of this letter your
comments including
a description of corrective actions that have been or will be
taken,
corrective actions
which will be taken to avoid further deviations,
and
the date corrective actions were or will be completed.
In accordance
with Section 2.790 of the NRC's "Rules of Practice," Part 2, Title
10, Code of Federal Regulations,
a copy of this letter and the enclosed inspection
report will be placed in the NRC's Public Document
Room. If this report contains
any information that you (or your contractor) believe to be proprietary, it is
necessary
that you make
a written application within 20 days to this office to
withhold
such
information from public disclosure.
Any such application
must
Florida Power and Light Company
"2-
JUN~ 7)sso
include
a full statement
of the reasons
on the basis of which it is claimed that
the information is proprietary,
and should be prepared
so that proprietary infor-
mation identified in the application is contained
in a separate
part of the
document.
If we do not hear from you in this regard within the specified period,
the report will be placed in the Public Document Room.
Should you have any questions
concerning this letter,
we will be glad to discuss
them with you.
Sincerely,
C. E. Mur
y,
Ch ef
Reactor Construction
and Engineering
Support Branch
and
cc w/encl:
H. E. Yaeger, Plant Manager
Enclosures:
1.
Appendix A, Notice of Violation
2.
Appendix B, Notice of Deviation
3.
Inspection Report Nos. 50-250/80-19
50-251/80-20