Forwards IE Insp Repts 50-250/80-20 & 50-251/80-17 on 800527-29 & 0603-04 & Notice of Violation
ML17340A161
Person / Time
Site: Turkey Point  
Issue date: 07/03/1980
From: Murphy C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Robert E. Uhrig
FLORIDA POWER & LIGHT CO.
Shared Package
ML17340A159 List:
References
NUDOCS 8009120495
Download: ML17340A161 (4)


See also: IR 05000250/1980020

Text

(4ggs Rfoo

~o

Cy

+o

~o

~+*++

Ii

In Reply Refer To:

RII:NE

50"250/80-20

50-251/80-17

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION II

101 MARIETTAST., N.W., SUITE 3100

ATLANTA,GEORGIA 30303

JUL

3 580

Florida Power and Light Company

ATTN:

R. E. Uhrig, Vice President

P.'.

Box 529100

Miami, FL

33152

Gentlemen:

This prefers to the inspection

conducted

by N. Economos of this office on May 27

through

29,

1980

and

June

3 through 4,

1980 of activities authorized

by

NRC

Operating .License

Nos.

DPR-31

and DPR-41 for the Turkey Point facility, and to

the discussion

of our findings held with J.

K. Hays at the conclusion of the

inspection.

Areas

examined

during the

inspection

and

our findings

are

discussed

in the

enclosed

inspection

report.

Within these

areas,

the inspection

consisted

of

selective

examirlations of procedures

and representative

records,

interviews with

personnel,

and observations

by the inspector.

One

new unresolved

item resulted

from this inspection

and is discussed

in the

enclosed report.

This item will be examined during subsequent

inspections.

During the inspection, it was

found that certain activities under your license

appear

to be in noncompliance

with NRC requirements.

This item and references

to pertinent requirements

are listed in the Notice of Violation enclosed herewith

as Appendix A.

This notice is sent to you pursuant

to the provisions of Section

2.201 of the NRC's "Rules of Practice," Part 2, Title 10, Code of Federal Regula-

tions.

Section

2.201 requires

you to submit to this office, within 20 days of

your receipt of this notice,

a written statement

or explanation in reply including:

(1) corrective steps

which have been taken by you and the results

achieved;

(2)

corrective steps

which will be taken to avoid further noncompliance;

and (3) the

date when full compliance will be achieved.

In accordance

with Section 2.790 of the NRC's "Rules of Practice," Part 2, Title

10,

Code of Federal Regulations,

a copy of this letter and the enclosed inspection

report will be placed 'in the NRC's Public Document

Room. If this report conta'ins

any information that you (or your contractor) believe to be 'proprietary, it is

necessary

that you make

a written application within 20 days to this office to

withhold

such

information

from public disclosure.

Any such application

must

include

a full statement

of the reasons

on the basis of which it is claimed that

the information is proprietary,

and should be prepared

so that proprietary infor-

mation identified in the application is contained in a separate

part of the

document. If we do not hear from you in this regard within the specified period,

the report will be placed in the Public Document Room.

80 09180 495

l

~,

Florida Power

and Light Company

JUL

3 1980

Should you have any questions

concerning this letter,

we will be glad to discuss

them with you.

Sincerely,

C. E. Murphy, Chxe f

Reactor Construction

and Engineering

Support Branch

Enclosures:

l.

Appendix A, Notice of Violation

2.

Inspection Report Nos. 50-250/80-20

and 50-251/80-17

cc w/encl:

H. E. Yaeger, Plant Manager