APPENDIX A NOTICE OF VIOLATION Florida Power and Light Company Turkey Point, Units 3 and 4
License Nos.
DPR-31 6 DPR-41 Based on the NRC inspection May 27 to June 4, 1980, certain of your activities were apparently not conducted in full compliance with NRC requirements as indi-cated below.
These items have been categorized as described in correspondence to you dated December 31, 1974.
As required by Criterion V of Appendix B to 10 CFR 50, and implemented by FPL Topical FPLTQAR 1-76, Section 5, paragraph 5.1 specifies in part that activities affecting quality shall be accomplished in accordance with instructions, procedures, or drawings.
Paragraph 8.2 of specification 5177-M-53 Appendix 13 "Welding Filler Material Requirements",
states in part that at the end of each shift, or after 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> whichever is less, unused filler material shall be returned to the rod room and processed per Table 2.
Contrary to the
- above, between June 3 and 4,
- 1980, two (2) instances were identified where the aforementioned procedural requirements were not being followed'1)
In the lower residual heat removal (RHR) heater exchange room of Unit 3 the inspector observed 26 weld electrodes of 1/8" 7018 low hydrogen material in an area where no welding was in progress.
(2)
At the work area of Unit 4 steam generator "C" feedwater nozzle, craft had left the work station at the end of their work shift without return-ing the unused weld electrodes to the rod room.
Electrodes were observed resting on various locations of this work station and inside a portable warmer.
This is an infraction.
gp ()g>80 49 <