Forwards IE Insp Repts 50-250/80-05 & 50-251/80-05 on 800205-07.No Noncompliance Noted
ML17339A906
Person / Time
Site: Turkey Point  
Issue date: 02/22/1980
From: Bryant J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Robert E. Uhrig
FLORIDA POWER & LIGHT CO.
Shared Package
ML17339A907 List:
References
NUDOCS 8004230009
Download: ML17339A906 (4)


See also: IR 05000250/1980005

Text

0

~S AE0y

+

0

Cy

C1

.'

gO

++*++

UNITEDSTATES

NUCLEAR REGULATORY COIVIIVIISSION

REGION II

101 MARIETTAST., N.W., SUITE 3100

ATLANTA,GEORGIA 30303

FEB 3 2 1980

~ ~~~m

+->dc

asl

In Reply Refer To:

RII:WPA

50-250/80-5

50-251/80-5

Florida Power and Light Company

ATTN:

R. E. Uhrig, Vice President

P. 0. Box 529100

Miami, FL

33152

Gentlemen:

This refers to the inspection

conducted

by W. P.

Ang of this office on February

5

through February 7,

1980 of activities authorized

by NRC Operating License Nos.

DPR-31

and DPR-41 for the Turkey Point Nuclear Plant facility, and to the discus-

sion of our findings held with H. E. Yaeger at the conclusion of the inspection.

Areas

examined

during the

inspection

and

our findings

are

discussed

in the

enclosed

inspection

report.

Within these

areas,

the inspection

consisted

of

selective

examinations

of procedures

and representative

records,

interviews with

personnel,

and observations

by the inspector.

Within the scope of this inspection,

no items of noncompliance

were disclosed.

One

new unresolved

item resulted

from this inspection

and is discussed

in the

enclosed report.

This item will be examined during subsequent

inspections.

In accordance

with Section 2.790 of the NRC's "Rules of Practice",

Part 2, Title

10,

Code of Federal Regulations,

a copy of this letter and the enclosed inspection

report will be placed in the NRC's Public Document

Room. If this report contains

any information that you (or your contractor) believe to be proprietary, it is

necessary

that you make

a written application within 20 days to this office to

withhold

such

information from public disclosure.

Any such application

must

include

a full statement

of the reasons

on the basis of which it is claimed that

the

information is proprietary,

and

should

be

prepared

so that proprietary

information identified in the application is contained in a separate

part of the

document. If we do not hear from you in this regard within the specified period,

the report willbe placed in the Public Document Room.

Should you have any questions

concerning this letter,

we will be glad to discuss

them with you.

Sincerely,

J.

C.

ant, Acting Chief

React

Construction

and Engineering

Support Branch

Enclosure:

(See

Page

2)

I

8 0 0 4 3300op

Florida Power and Light Company

FEB 22 i980

Inspection Report Nos. 50-250/80-5

and 50-251/80"5

cc w/encl:

H. E. Yaeger,

Plant Manager