~R AE0Ij
~o
+4*4+
UNITEDSTATES
NUCLEAR REGULATORY COMMISSION
REGION II
101 MARIETTAST., N.W., SUITE 3100
ATLANTA,GEORGIA 30303
JAN
8 1980
In Reply Refer To:
RII:WPA
50-250/79-38
50-251/79-38
Florida Power and Light Company
ATTN:
R. E. Uhrig, Vice President
P. 0.
Box 529100
Miami, FL
33152
Gentlemen:
This refers to the inspection
conducted
by W. P.
Ang of this office on
December
12-14,
1979, of activities authorized
by NRC Operating License
Nos.
and DPR-41 for the Turkey Point facility, and to the discussion of our
findings held with H. E. Yeager at the conclusion of the inspection.
Areas
examined during the inspection
and our findings are discussed
in the
enclosed
inspection report.
Within these
areas,
the inspection consisted of
selective
examinations of procedures
and representative
records,
interviews with
personn'el,
and observations
by the inspector.
Within the scope of this inspection,
no items of noncompliance
were disclosed.
In accordance
with Section 2.790 of the NRC's "Rules of Practice", Part 2,
Title 10,
Code of Federal Regulations,
a copy of this letter and the enclosed
inspection report will be placed in the NRC's Public Document
Room. If this
report contains
any information that you (or your contractor) believe to be
proprietary, it is necessary
that you make
a written application within 20 days
to this office to withhold such information from public disclosure.
Any such
application must include
a full statement
of the reasons
on the basis of which
it is claimed that the information is proprietary,
and should be prepared
so
that proprietary information identified in the application is contained in a
separate
part of the document.
If we do not hear from you in this regard within
the specified period, the report. will be placed in the Public Document
Room.
O
JAN
8 l98g
Florida Power and Light Company
-2-
Should you have any questions
concerning this letter,
we will be glad to discuss
them with you.
Sincerely,
J.
C.
B
ant, Acting Chief
Reactor Construction
and Engineering
Support Branch
Enclosure:
Inspection Report Nos. 50-250/79-38
and 50-251/79-38
cc w/encl:
H. E. Yaeger, Plant Manager
P. 0.
Box 013100
Miami, FL
33101
pw