ML17339A651

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Repts 50-250/79-34 & 50-251/79-34 on 791210-14.No Noncompliance Noted
ML17339A651
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 01/29/1980
From: Robert Lewis
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Robert E. Uhrig
FLORIDA POWER & LIGHT CO.
Shared Package
ML17339A652 List:
References
NUDOCS 8003120735
Download: ML17339A651 (4)


See also: IR 05000250/1979034

Text

gp,A REoo

+0

~o

Cy

0O

+a*++

In Reply Refer To:

RII:MCA

50-250/79-34

50-251/79"34

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION II

101 MARIETTAST., N.W., SUITE 3100

ATLANTA,G EORG IA30303

JAN 3

9 1980

+y ~O

Florida Power and Light Company

ATTN:

R. E. Uhrig, Vice President

P. 0. Box 529100

Miami, FL

33152

Gentlemen:

This refers

to the inspection

conducted

by M. C. Ashenden of this office on

December

10-14,

1979,

of activities authorized

by

NRC Operating License

Nos.

DPR-31

and

DPR-41 for the Turkey Point facility, and to the discussion of our

findings held with H. E. Yeager,

Plant

Manager

on December

12,

1979,

and J. E.

Vessely on December

14, 1979, at the conclusion of the inspection.

e

Areas

examined

during the inspection

and

our findings

are

discussed

in the

enclosed

inspection

report.

Within these

areas,

the inspection

consisted

of

selective

examinations of procedures

and representative

records,

interviews with

personnel,

and observations

by the inspector.

Within the scope of this inspection,

no items of noncompliance

were disclosed.

We have

examined

actions

you have

taken with regard to previously identified

enforcement matters

and unresolved

items.

The status of these items is discussed

in the enclosed report.

In accordance

with Section 2.790 of the NRC's "Rules of Practice", Part 2, Title

10, Cpde of Federal Regulations,

a copy of this letter and the enclosed inspection

report will be placed in the NRC's Public Document Room. If this report contains

any information that you (or your contractor) believe to be proprietary, it is

necessary

that you make

a written application within 20 days to this office to

withhold such

information from public disclosure.

Any such application must

include

a full statement of the reasons

on the basis of which it is claimed that

the information is pr'oprietary,

and should be prepared

so that proprietary infor-

mation identified in the application is contained in a separate

part of the

document. If we do not hear from you in this regard within the specified period,

the report willbe placed in the Public Document Room.

oooogoo

.

Florida Power and Light Company

JAN 2

8 1980

Should you have any questions

concerning this letter,

we will be glad to discuss

them with you.

l4

Sincerely,

C

R.

C. Lewis, Acting Chief

Reactor Operations

and Nuclear

Support Branch

Enclosure:

Inspection Report Nos. 50-250/79-34

and 50-251/79-34

cc w/encl:

'H. E. Yaeger, Plant Manager

P.

O. Box 013100

Miami, FL

33101

Ci