y
~R RED
~4
"o
O
0
~O
++*++
UNITEDSTATES
NUCLEAR REGULATORYCOMMISSION
REGION II
101 MARIETTAST., N.W., SUITE 3100
ATLANTA,GEO RG IA30303
In Reply Refer To:
RII:RWZ
50-250/79-27.
50-251/79-27
2 1 1979
Florida Power and Light Company
ATTN:
R. E. Uhrig, Vice President
P. 0. Box 529100
Miami, FL
33152
Gentlemen:
This refers
to the inspection
conducted
by R.
W. Zavadoski of this office on
August 29-31,
1979,
of activities
authorized
by
NRC Operating
License
Nos.
and
DPR-41 for the Turkey Point facility, and to the discussion of our
findings held with H. E. Yaeger, Plant Manager at the conclusion of the inspection.
The inspection
was
an examination of the activities conducted
under your license
as they relate to radiation safety
and to compliance with the Commission's
rules
and regulations
and the conditions of your license.
The inspection consisted of
selective
examinations of procedures
and representative
records,
interviews with
personnel,
and observations
by the inspector.
During the inspection, it was
found that certain activities under your license
appear to be in noncompliance with NRC requirements.
These items
and references
to pertinent requirements
are listed in the Notice of Violation enclosed herewith
as Appendix A.
This notice is sent to you pursuant to the provisions of Section
2.201 of the NRC's "Rules of Practice," Part 2, Title 10, Code of Federal Regula-
tions.
Section 2.201 requires
you to submit to this office, within 20 days of
your receipt of this notice, a'written statement or explanation in reply including:
(1) corrective steps
which have been taken by you and the results
achieved;
(2)
corrective steps
which will be taken to avoid further noncompliance;
and (3) the
date when full compliance will be achieved.
In accordance
with Section 2.790 of the NRC's "Rules of Practice," Part 2, Title
10, Code of Federal Regulations,
a copy of this letter and the enclosed inspection
report will be placed in the NRC's Public Document
Room. If this report contains
any information that you (or your contractor) believe to be proprietary, it is
necessary
that you make
a written application within 20 days to this office to
withhold such information from public disclosure.
Any such application must
include
a full statement of the reasons
on the basis of which it is claimed that
the
information is proprietary,
and
should
be prepared
so that proprietary
information identified in the application is contained in a separate
part of the
document. If we do not hear from you in this regard within the specified period,
the-report willbe placed in the Public Document Room.
79111 5Q + Q
SEP 21 1979
'lorida
Power and Light Company
Should you have any questions
concerning this letter,
we will be glad to discuss
them with you.
Sincerely,
Fuel Facility and Materials
Safety Branch
Enclosures:
1.
Appendix A, Notice of Violation
2.
Inspection Report Nos. 50-250/79-27,
and 50-251/79-27
cc w/encl:
H. E. Yaeger, Plant Manager
P. 0.
Box 013100
Miami, FL
33101
pal